NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 11/23/1998 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY REG PLANT NAME %PWR DOWN REASON OR COMMENT * # --- ------------------------ ---- -------- -------------------------------- - - 1 BEAVER VALLEY 1 100 -------------------------------------------------------------------------------- 1 BEAVER VALLEY 2 100 -------------------------------------------------------------------------------- 1 CALVERT CLIFFS 1 100 -------------------------------------------------------------------------------- 1 CALVERT CLIFFS 2 100 -------------------------------------------------------------------------------- 1 FITZPATRICK 1 0 10/16/98 Refueling REFUELING OUTAGE - CORE RELOAD IN PROGRESS -------------------------------------------------------------------------------- 1 GINNA 1 100 -------------------------------------------------------------------------------- 1 HOPE CREEK 1 2 Startup * HOLDING POWER FOR TESTING -------------------------------------------------------------------------------- 1 INDIAN POINT 2 99 -------------------------------------------------------------------------------- 1 INDIAN POINT 3 0 11/19/98 Cold Shutdown MAINTENANCE OUTAGE -------------------------------------------------------------------------------- 1 LIMERICK 1 100 -------------------------------------------------------------------------------- 1 LIMERICK 2 100 -------------------------------------------------------------------------------- 1 MILLSTONE 2 0 02/20/96 Refueling REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 1 MILLSTONE 3 100 -------------------------------------------------------------------------------- 1 NINE MILE POINT 1 100 -------------------------------------------------------------------------------- 1 NINE MILE POINT 2 25 Power Operation * REDUCED POWER TO RECOVER "B" RECIRC PUMP - TROUBLESHOOTING FLOW CONTROL VALVE -------------------------------------------------------------------------------- 1 OYSTER CREEK 1 100 -------------------------------------------------------------------------------- 1 PEACH BOTTOM 2 100 -------------------------------------------------------------------------------- 1 PEACH BOTTOM 3 100 * -------------------------------------------------------------------------------- 1 PILGRIM 1 99 * -------------------------------------------------------------------------------- 1 SALEM 1 100 -------------------------------------------------------------------------------- 1 SALEM 2 100 -------------------------------------------------------------------------------- 1 SEABROOK 1 0 11/12/98 Hot Standby * MAINTENANCE OUTAGE - ANTICIPATE ENTERING MODE 2 TODAY -------------------------------------------------------------------------------- 1 SUSQUEHANNA 1 100 -------------------------------------------------------------------------------- 1 SUSQUEHANNA 2 100 -------------------------------------------------------------------------------- 1 THREE MILE ISLAND 1 100 -------------------------------------------------------------------------------- 1 VERMONT YANKEE 1 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 11/23/1998 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY REG PLANT NAME %PWR DOWN REASON OR COMMENT * # --- ------------------------ ---- -------- -------------------------------- - - 2 BROWNS FERRY 1 0 03/03/85 Refueling DEFUELED -------------------------------------------------------------------------------- 2 BROWNS FERRY 2 100 -------------------------------------------------------------------------------- 2 BROWNS FERRY 3 100 -------------------------------------------------------------------------------- 2 BRUNSWICK 1 100 -------------------------------------------------------------------------------- 2 BRUNSWICK 2 100 -------------------------------------------------------------------------------- 2 CATAWBA 1 100 -------------------------------------------------------------------------------- 2 CATAWBA 2 100 -------------------------------------------------------------------------------- 2 CRYSTAL RIVER 3 100 -------------------------------------------------------------------------------- 2 FARLEY 1 0 10/17/98 Refueling REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 2 FARLEY 2 100 -------------------------------------------------------------------------------- 2 HARRIS 1 0 10/23/98 Cold Shutdown * REFUELING OUTAGE - TESTING IN PROGRESS - STARTED 1 RCP -------------------------------------------------------------------------------- 2 HATCH 1 100 -------------------------------------------------------------------------------- 2 HATCH 2 97 * -------------------------------------------------------------------------------- 2 MCGUIRE 1 100 -------------------------------------------------------------------------------- 2 MCGUIRE 2 100 -------------------------------------------------------------------------------- 2 NORTH ANNA 1 100 -------------------------------------------------------------------------------- 2 NORTH ANNA 2 100 -------------------------------------------------------------------------------- 2 OCONEE 1 100 -------------------------------------------------------------------------------- 2 OCONEE 2 100 -------------------------------------------------------------------------------- 2 OCONEE 3 0 10/08/98 Cold Shutdown REFUELING OUTAGE -------------------------------------------------------------------------------- 2 ROBINSON 2 100 Power Operation * REDUCING POWER TO 98% FOR SCHEDULED CONTROL ROD EXERCISE -------------------------------------------------------------------------------- 2 SEQUOYAH 1 100 -------------------------------------------------------------------------------- 2 SEQUOYAH 2 100 -------------------------------------------------------------------------------- 2 ST LUCIE 1 100 -------------------------------------------------------------------------------- 2 ST LUCIE 2 0 11/09/98 Refueling REFUELING OUTAGE -------------------------------------------------------------------------------- 2 SUMMER 1 100 -------------------------------------------------------------------------------- 2 SURRY 1 0 11/21/98 Hot Shutdown REACTOR TRIP ON TURBINE TRIP DUE TO HIGH SG WATER LEVEL FOLLOWED BY SPURIOUS SI - SEE EVENT #35071 -------------------------------------------------------------------------------- 2 SURRY 2 100 -------------------------------------------------------------------------------- 2 TURKEY POINT 3 100 -------------------------------------------------------------------------------- 2 TURKEY POINT 4 100 -------------------------------------------------------------------------------- 2 VOGTLE 1 100 -------------------------------------------------------------------------------- 2 VOGTLE 2 100 -------------------------------------------------------------------------------- 2 WATTS BAR 1 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 11/23/1998 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY REG PLANT NAME %PWR DOWN REASON OR COMMENT * # --- ------------------------ ---- -------- -------------------------------- - - 3 BRAIDWOOD 1 99 Power Operation * TESTING IN PROGRESS -------------------------------------------------------------------------------- 3 BRAIDWOOD 2 87 Power Operation * REDUCED POWER FOR THROTTLE VALVE/GOVERNOR VALVE TESTING -------------------------------------------------------------------------------- 3 BYRON 1 100 -------------------------------------------------------------------------------- 3 BYRON 2 100 -------------------------------------------------------------------------------- 3 CLINTON 1 0 09/06/96 Cold Shutdown REFUELING OUTAGE -------------------------------------------------------------------------------- 3 COOK 1 0 09/08/97 Cold Shutdown MAINTENANCE OUTAGE -------------------------------------------------------------------------------- 3 COOK 2 0 09/09/97 Cold Shutdown REFUELING OUTAGE -------------------------------------------------------------------------------- 3 DAVIS BESSE 1 100 -------------------------------------------------------------------------------- 3 DRESDEN 2 98 Power Operation * INCREASING POWER TO 99% -------------------------------------------------------------------------------- 3 DRESDEN 3 99 -------------------------------------------------------------------------------- 3 DUANE ARNOLD 1 100 -------------------------------------------------------------------------------- 3 FERMI 2 96 Power Operation * ADMINISTRATIVE LIMIT -------------------------------------------------------------------------------- 3 KEWAUNEE 1 0 10/16/98 Cold Shutdown * REFUELING OUTAGE -------------------------------------------------------------------------------- 3 LASALLE 1 100 -------------------------------------------------------------------------------- 3 LASALLE 2 0 09/20/96 Refueling REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 3 MONTICELLO 1 100 -------------------------------------------------------------------------------- 3 PALISADES 1 100 -------------------------------------------------------------------------------- 3 PERRY 1 100 * -------------------------------------------------------------------------------- 3 POINT BEACH 1 51 Power Operation * HOLDING POWER FOR MAINTENANCE ON MAIN FEEDWATER PUMP -------------------------------------------------------------------------------- 3 POINT BEACH 2 72 Power Operation * COASTDOWN TO REFUELING OUTAGE -------------------------------------------------------------------------------- 3 PRAIRIE ISLAND 1 100 -------------------------------------------------------------------------------- 3 PRAIRIE ISLAND 2 0 11/09/98 Refueling REFUELING OUTAGE -------------------------------------------------------------------------------- 3 QUAD CITIES 1 0 11/07/98 Refueling REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 3 QUAD CITIES 2 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 11/23/1998 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY REG PLANT NAME %PWR DOWN REASON OR COMMENT * # --- ------------------------ ---- -------- -------------------------------- - - 4 ARKANSAS NUCLEAR 1 100 -------------------------------------------------------------------------------- 4 ARKANSAS NUCLEAR 2 100 -------------------------------------------------------------------------------- 4 CALLAWAY 1 100 -------------------------------------------------------------------------------- 4 COMANCHE PEAK 1 100 -------------------------------------------------------------------------------- 4 COMANCHE PEAK 2 100 * -------------------------------------------------------------------------------- 4 COOPER 1 0 10/03/98 Cold Shutdown REFUELING OUTAGE -------------------------------------------------------------------------------- 4 DIABLO CANYON 1 100 -------------------------------------------------------------------------------- 4 DIABLO CANYON 2 100 -------------------------------------------------------------------------------- 4 FT CALHOUN 1 100 -------------------------------------------------------------------------------- 4 GRAND GULF 1 100 -------------------------------------------------------------------------------- 4 PALO VERDE 1 100 -------------------------------------------------------------------------------- 4 PALO VERDE 2 100 -------------------------------------------------------------------------------- 4 PALO VERDE 3 100 -------------------------------------------------------------------------------- 4 RIVER BEND 1 100 -------------------------------------------------------------------------------- 4 SAN ONOFRE 2 100 -------------------------------------------------------------------------------- 4 SAN ONOFRE 3 100 -------------------------------------------------------------------------------- 4 SOUTH TEXAS 1 100 -------------------------------------------------------------------------------- 4 SOUTH TEXAS 2 100 * -------------------------------------------------------------------------------- 4 WASHINGTON NUCLEAR 2 100 -------------------------------------------------------------------------------- 4 WATERFORD 3 0 11/18/98 Cold Shutdown * MAINTENANCE OUTAGE -------------------------------------------------------------------------------- 4 WOLF CREEK 1 100 -------------------------------------------------------------------------------- * - REASON OR COMMENT HAS BEEN CHANGED IN PAST 24 HOURS # - NUMBER OF REACTOR SCRAMS WITHIN PAST 24 HOURS NOTE - REACTOR STATUS DATA COLLECTED BETWEEN 4 A.M. AND 8 A.M. EACH DAY. ALL TIMES ARE BASED ON EASTERN TIMES (ET).