NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 02/29/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 1 BEAVER VALLEY 1 4501 094 CONDENSER WATERBOX * CLEANING. REFUELING OUTAGE SCHEDULED TO START 03/22. -------------------------------------------------------------------------------- 1 BEAVER VALLEY 2 4501 100 -------------------------------------------------------------------------------- 1 CALVERT CLIFFS 1 4502 100 -------------------------------------------------------------------------------- 1 CALVERT CLIFFS 2 4502 000 02/27 UNK MODE 3 - HOT STANDBY * ENTERING A COLD SHUTDOWN CONDITION TO INVESTIGATE A LEAK ON STEAM GENERATOR "21" BLOWDOWN LINE. -------------------------------------------------------------------------------- 1 FITZPATRICK 1 4503 000 02/22 UNK COND 4 - COLD SHUTDOWN * MAINTENANCE OUTAGE -------------------------------------------------------------------------------- 1 GINNA 1 4504 097 -------------------------------------------------------------------------------- 1 HADDAM NECK 1 4505 100 -------------------------------------------------------------------------------- 1 HOPE CREEK 1 4506 000 11/95 03/09 COND 4 - COLD SHUTDOWN * REFUELING OUTAGE -------------------------------------------------------------------------------- 1 INDIAN POINT 2 4507 100 -------------------------------------------------------------------------------- 1 INDIAN POINT 3 4508 000 09/95 03/03 MODE 4 - HOT SHUTDOWN MAINTENANCE OUTAGE -------------------------------------------------------------------------------- 1 LIMERICK 1 4509 005 COND 2 - STARTUP * RANGE 8 ON INTERMEDIATE RANGE MONITORS. -------------------------------------------------------------------------------- 1 LIMERICK 2 4509 100 -------------------------------------------------------------------------------- 1 MAINE YANKEE 1 4510 090 HOLDING POWER UNTIL COMPLETION OF COMPUTER MODEL EVALUATION -------------------------------------------------------------------------------- 1 MILLSTONE 1 4511 000 11/95 UNK COND 5 - REFUELING REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 1 MILLSTONE 2 4512 000 02/20 03/25 MODE 5 - COLD SHUTDOWN MID-CYCLE OUTAGE -------------------------------------------------------------------------------- 1 MILLSTONE 3 4513 100 -------------------------------------------------------------------------------- 1 NINE MILE POINT 1 4514 100 * -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 02/29/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 1 NINE MILE POINT 2 4514 100 -------------------------------------------------------------------------------- 1 OYSTER CREEK 1 4515 100 -------------------------------------------------------------------------------- 1 PEACH BOTTOM 2 4516 100 -------------------------------------------------------------------------------- 1 PEACH BOTTOM 3 4516 100 -------------------------------------------------------------------------------- 1 PILGRIM 1 4517 100 -------------------------------------------------------------------------------- 1 SALEM 1 4518 000 05/95 07/01 MODE 6 - REFUELING REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 1 SALEM 2 4518 000 06/95 07/01 MODE 6 - REFUELING REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 1 SEABROOK 1 4519 100 -------------------------------------------------------------------------------- 1 SUSQUEHANNA 1 4520 100 -------------------------------------------------------------------------------- 1 SUSQUEHANNA 2 4520 100 -------------------------------------------------------------------------------- 1 THREE MILE ISLAND 1 4521 100 -------------------------------------------------------------------------------- 1 VERMONT YANKEE 1 4522 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 02/29/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 2 BROWNS FERRY 1 4525 000 03/85 UNK COND 5 - REFUELING DEFUELED -------------------------------------------------------------------------------- 2 BROWNS FERRY 2 4525 094 COASTDOWN TO REFUELING * OUTAGE. OUTAGE SCHEDULED TO COMMENCE 3/22. -------------------------------------------------------------------------------- 2 BROWNS FERRY 3 4525 000 02/29 UNK COND 3 - HOT SHUTDOWN * # REACTOR SCRAM. LOOKS LIKE REACTOR SCRAMMED ON HIGH APRM FLUX SIGNAL. ALL RODS FULLY INSERTED. SEE EVENT # 30044. -------------------------------------------------------------------------------- 2 BRUNSWICK 1 4526 100 -------------------------------------------------------------------------------- 2 BRUNSWICK 2 4526 000 02/02 03/10 COND 5 - REFUELING REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 2 CATAWBA 1 4527 100 -------------------------------------------------------------------------------- 2 CATAWBA 2 4527 100 -------------------------------------------------------------------------------- 2 CRYSTAL RIVER 3 4528 000 02/16 04/11 MODE 6 - REFUELING REFUELING OUTAGE -------------------------------------------------------------------------------- 2 FARLEY 1 4529 100 -------------------------------------------------------------------------------- 2 FARLEY 2 4529 100 -------------------------------------------------------------------------------- 2 HARRIS 1 4531 100 -------------------------------------------------------------------------------- 2 HATCH 1 4532 083 COASTDOWN TO REFUELING OUTAGE. REFUELING OUTAGE SCHEDULED TO START 03/23. -------------------------------------------------------------------------------- 2 HATCH 2 4532 098 INCREASING REACTOR * POWER. -------------------------------------------------------------------------------- 2 MCGUIRE 1 4533 100 -------------------------------------------------------------------------------- 2 MCGUIRE 2 4533 100 -------------------------------------------------------------------------------- 2 NORTH ANNA 1 4534 000 02/11 03/15 MODE 6 - REFUELING REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 2 NORTH ANNA 2 4534 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 02/29/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 2 OCONEE 1 4535 000 02/28 UNK MODE 4 - HOT SHUTDOWN * # REACTOR TRIPPED ON LOSS OF MAIN FEEDWATER. LOOKS LIKE A MODULE IN THE INTEGRATED CONTROL SYSTEM CALLED THE FEEDWATER MULTIPLIER FAILED WHICH CAUSED THE LOSS OF MAIN FEEDWATER. SEE EVENT # 30043. -------------------------------------------------------------------------------- 2 OCONEE 2 4535 100 -------------------------------------------------------------------------------- 2 OCONEE 3 4535 100 -------------------------------------------------------------------------------- 2 ROBINSON 2 4536 100 -------------------------------------------------------------------------------- 2 SEQUOYAH 1 4537 100 EVENING OF 03/01 * LICENSEE WILL START A PLANNED SHUTDOWN TO REPLACED REACTOR COOLANT PUMP # 2 SEAL AND MOTOR. OUTAGE IS SCHEDULED TO LAST 8.5 DAYS. -------------------------------------------------------------------------------- 2 SEQUOYAH 2 4537 100 -------------------------------------------------------------------------------- 2 ST LUCIE 1 4538 098 * -------------------------------------------------------------------------------- 2 ST LUCIE 2 4538 100 -------------------------------------------------------------------------------- 2 SUMMER 1 4539 100 -------------------------------------------------------------------------------- 2 SURRY 1 4540 100 -------------------------------------------------------------------------------- 2 SURRY 2 4540 100 -------------------------------------------------------------------------------- 2 TURKEY POINT 3 4541 100 -------------------------------------------------------------------------------- 2 TURKEY POINT 4 4541 100 -------------------------------------------------------------------------------- 2 VOGTLE 1 4542 081 COASTDOWN TO REFUELING * OUTAGE. SCHEDULED TO ENTER REFUELING OUTAGE 03/01. -------------------------------------------------------------------------------- 2 VOGTLE 2 4542 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 02/29/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 2 WATTS BAR 1 2249 000 02/19 03/02 MODE 4 - HOT SHUTDOWN * MAKING MODIFICATIONS TO AUXILIARY FEEDWATER SYSTEM -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 02/29/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 3 BIG ROCK POINT 1 4544 000 01/05 03/15 COND 5 - REFUELING REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 3 BRAIDWOOD 1 4545 100 -------------------------------------------------------------------------------- 3 BRAIDWOOD 2 4545 097 COASTDOWN TO REFUELING * OUTAGE. START OF REFUELING OUTAGE IS 03/15 -------------------------------------------------------------------------------- 3 BYRON 1 4546 098 FULL POWER LIMIT -------------------------------------------------------------------------------- 3 BYRON 2 4546 100 -------------------------------------------------------------------------------- 3 CLINTON 1 4548 100 -------------------------------------------------------------------------------- 3 COOK 1 4549 100 -------------------------------------------------------------------------------- 3 COOK 2 4549 100 -------------------------------------------------------------------------------- 3 DAVIS BESSE 1 4550 100 -------------------------------------------------------------------------------- 3 DRESDEN 2 4551 000 06/95 03/05 COND 4 - COLD SHUTDOWN REFUELING OUTAGE -------------------------------------------------------------------------------- 3 DRESDEN 3 4551 100 * -------------------------------------------------------------------------------- 3 DUANE ARNOLD 1 4552 100 -------------------------------------------------------------------------------- 3 FERMI 2 4553 096 -------------------------------------------------------------------------------- 3 KEWAUNEE 1 4554 098 -------------------------------------------------------------------------------- 3 LASALLE 1 4555 000 01/25 04/05 COND 5 - REFUELING REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 3 LASALLE 2 4555 100 -------------------------------------------------------------------------------- 3 MONTICELLO 1 4556 086 COASTDOWN TO REFUELING * OUTAGE. START OF REFUELING OUTAGE IS 04/10. -------------------------------------------------------------------------------- 3 PALISADES 1 4557 100 -------------------------------------------------------------------------------- 3 PERRY 1 4558 000 01/27 03/29 COND 5 - REFUELING REFUELING OUTAGE -------------------------------------------------------------------------------- 3 POINT BEACH 1 4559 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 02/29/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 3 POINT BEACH 2 4559 090 FULL POWER LIMIT -------------------------------------------------------------------------------- 3 PRAIRIE ISLAND 1 4560 000 01/05 03/02 MODE 5 - COLD SHUTDOWN * REFUELING OUTAGE. REPAIRING LETDOWN INLET LOOP MANUAL ISOLATION VALVE STEM WHICH CAME LOOSE FROM THE VALVE SEAT. -------------------------------------------------------------------------------- 3 PRAIRIE ISLAND 2 4560 100 -------------------------------------------------------------------------------- 3 QUAD CITIES 1 4561 000 02/10 04/30 COND 5 - REFUELING REFUELING OUTAGE -------------------------------------------------------------------------------- 3 QUAD CITIES 2 4561 100 -------------------------------------------------------------------------------- 3 ZION 1 4562 000 02/18 03/04 MODE 5 - COLD SHUTDOWN LOOKING FOR A LOOSE PART IN THE 'B' LOOP -------------------------------------------------------------------------------- 3 ZION 2 4562 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 02/29/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 4 ARKANSAS NUCLEAR 1 4563 100 -------------------------------------------------------------------------------- 4 ARKANSAS NUCLEAR 2 4563 098 -------------------------------------------------------------------------------- 4 CALLAWAY 1 4564 100 -------------------------------------------------------------------------------- 4 COMANCHE PEAK 1 4565 100 -------------------------------------------------------------------------------- 4 COMANCHE PEAK 2 4565 000 02/23 04/04 MODE 6 - REFUELING REFUELING OUTAGE -------------------------------------------------------------------------------- 4 COOPER 1 4566 100 -------------------------------------------------------------------------------- 4 DIABLO CANYON 1 4567 100 -------------------------------------------------------------------------------- 4 DIABLO CANYON 2 4567 100 -------------------------------------------------------------------------------- 4 FT CALHOUN 1 4568 100 -------------------------------------------------------------------------------- 4 GRAND GULF 1 4569 100 -------------------------------------------------------------------------------- 4 PALO VERDE 1 4570 000 02/26 03/01 MODE 3 - HOT STANDBY REPAIRING BUSHING ON MAIN TRANSFORMER -------------------------------------------------------------------------------- 4 PALO VERDE 2 4570 100 -------------------------------------------------------------------------------- 4 PALO VERDE 3 4570 100 -------------------------------------------------------------------------------- 4 RIVER BEND 1 4571 100 -------------------------------------------------------------------------------- 4 SAN ONOFRE 2 4572 100 -------------------------------------------------------------------------------- 4 SAN ONOFRE 3 4572 100 -------------------------------------------------------------------------------- 4 SOUTH TEXAS 1 4573 100 -------------------------------------------------------------------------------- 4 SOUTH TEXAS 2 4573 100 -------------------------------------------------------------------------------- 4 WASHINGTON NUCLEAR 2 4574 080 PER LOAD DISPATCHER. WILL INCREASE REACTOR POWER TO 100% BY 0700PT. -------------------------------------------------------------------------------- 4 WATERFORD 3 4575 100 -------------------------------------------------------------------------------- 4 WOLF CREEK 1 4576 000 01/30 03/30 MODE 6 - REFUELING REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 02/29/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - * - REASON OR COMMENT HAS BEEN CHANGED IN PAST 24 HOURS # - NUMBER OF REACTOR SCRAMS WITHIN PAST 24 HOURS NOTE - REACTOR STATUS DATA COLLECTED BETWEEN 4 A.M. AND 8 A.M. EACH DAY. ALL TIMES ARE BASED ON EASTERN TIMES (ET).