NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 05/22/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 1 BEAVER VALLEY 1 4501 100 -------------------------------------------------------------------------------- 1 BEAVER VALLEY 2 4501 100 -------------------------------------------------------------------------------- 1 CALVERT CLIFFS 1 4502 000 03/30 06/03 MODE 5 - COLD SHUTDOWN REFUELING OUTAGE -------------------------------------------------------------------------------- 1 CALVERT CLIFFS 2 4502 100 -------------------------------------------------------------------------------- 1 FITZPATRICK 1 4503 100 -------------------------------------------------------------------------------- 1 GINNA 1 4504 000 04/01 06/01 MODE 6 - REFUELING * REFUELING OUTAGE - FUEL RELOAD IN PROGRESS - APPROXIMATELY 1/3 COMPLETE -------------------------------------------------------------------------------- 1 HADDAM NECK 1 4505 100 -------------------------------------------------------------------------------- 1 HOPE CREEK 1 4506 100 -------------------------------------------------------------------------------- 1 INDIAN POINT 2 4507 100 -------------------------------------------------------------------------------- 1 INDIAN POINT 3 4508 001 MODE 2 - STARTUP * SHUT DOWN UNIT ON 05/20/96 TO REPAIR A SEVERE AIR LEAK ON THE AIR LINE TO A SOLENOID VALVE WHICH KEEPS MSIV '34' OPEN - THE COPPER AIR LINE BROKE AT POWER WHILE IT WAS BEING REPAIRED - PLAN TO PLACE UNIT ON LINE TODAY -------------------------------------------------------------------------------- 1 LIMERICK 1 4509 000 05/21 05/22 COND 3 - HOT SHUTDOWN * # AUTOMATIC HIGH REACTOR PRESSURE SCRAM FROM 100% POWER DURING MSIV TESTING (REFER TO EVENT #30518) - MAY RESTART TODAY PENDING ADEQUATE ROOT CAUSE INVESTIGATION -------------------------------------------------------------------------------- 1 LIMERICK 2 4509 100 -------------------------------------------------------------------------------- 1 MAINE YANKEE 1 4510 090 POWER LIMITED TO 90% UNTIL NRC APPROVAL OF NEW LOCA ANALYSES -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 05/22/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 1 MILLSTONE 1 4511 000 11/95 UNK COND 5 - REFUELING REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 1 MILLSTONE 2 4512 000 02/20 UNK MODE 5 - COLD SHUTDOWN MAINTENANCE OUTAGE - PERFORMING 10 CFR 50.54(f) REVIEWS -------------------------------------------------------------------------------- 1 MILLSTONE 3 4513 000 03/30 UNK MODE 5 - COLD SHUTDOWN MAINTENANCE OUTAGE -------------------------------------------------------------------------------- 1 NINE MILE POINT 1 4514 000 05/20 05/23 COND 3 - HOT SHUTDOWN * REACTOR SCRAM ON HIGH REACTOR VESSEL WATER LEVEL (REFER TO EVENT #30501) - PLAN TO BEGIN STARTUP TONIGHT AND TO PLACE UNIT ON LINE TOMORROW -------------------------------------------------------------------------------- 1 NINE MILE POINT 2 4514 100 -------------------------------------------------------------------------------- 1 OYSTER CREEK 1 4515 100 -------------------------------------------------------------------------------- 1 PEACH BOTTOM 2 4516 087 COASTDOWN TO REFUELING OUTAGE -------------------------------------------------------------------------------- 1 PEACH BOTTOM 3 4516 100 -------------------------------------------------------------------------------- 1 PILGRIM 1 4517 100 -------------------------------------------------------------------------------- 1 SALEM 1 4518 000 05/95 07/01 MODE 6 - REFUELING REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 1 SALEM 2 4518 000 06/95 07/01 MODE 6 - REFUELING REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 1 SEABROOK 1 4519 100 -------------------------------------------------------------------------------- 1 SUSQUEHANNA 1 4520 100 -------------------------------------------------------------------------------- 1 SUSQUEHANNA 2 4520 100 -------------------------------------------------------------------------------- 1 THREE MILE ISLAND 1 4521 100 -------------------------------------------------------------------------------- 1 VERMONT YANKEE 1 4522 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 05/22/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 2 BROWNS FERRY 1 4525 000 03/85 UNK COND 5 - REFUELING DEFUELED -------------------------------------------------------------------------------- 2 BROWNS FERRY 2 4525 100 -------------------------------------------------------------------------------- 2 BROWNS FERRY 3 4525 100 -------------------------------------------------------------------------------- 2 BRUNSWICK 1 4526 100 -------------------------------------------------------------------------------- 2 BRUNSWICK 2 4526 100 -------------------------------------------------------------------------------- 2 CATAWBA 1 4527 100 -------------------------------------------------------------------------------- 2 CATAWBA 2 4527 100 -------------------------------------------------------------------------------- 2 CRYSTAL RIVER 3 4528 063 POWER ESCALATION TESTING * FOR THIS POWER LEVEL COMPLETED - PLAN TO INCREASE POWER 3% PER HOUR FOLLOWING RPS ADJUSTMENTS - PLAN TO PERFORM INTEGRATED CONTROL SYSTEM TUNING AND RPS FLOW OPTIMIZATION BETWEEN 85% AND 90% POWER -------------------------------------------------------------------------------- 2 FARLEY 1 4529 100 -------------------------------------------------------------------------------- 2 FARLEY 2 4529 100 -------------------------------------------------------------------------------- 2 HARRIS 1 4531 100 -------------------------------------------------------------------------------- 2 HATCH 1 4532 100 -------------------------------------------------------------------------------- 2 HATCH 2 4532 100 -------------------------------------------------------------------------------- 2 MCGUIRE 1 4533 100 -------------------------------------------------------------------------------- 2 MCGUIRE 2 4533 000 05/22 UNK MODE 3 - HOT STANDBY * # AUTOMATIC REACTOR TRIP FROM 99% POWER DUE TO TRIPPING OF THE 'B' RCP - RCP TRIPPED DUE TO ELECTRICAL FAULT (REFER TO #30519) -------------------------------------------------------------------------------- 2 NORTH ANNA 1 4534 100 -------------------------------------------------------------------------------- 2 NORTH ANNA 2 4534 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 05/22/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 2 OCONEE 1 4535 100 -------------------------------------------------------------------------------- 2 OCONEE 2 4535 100 -------------------------------------------------------------------------------- 2 OCONEE 3 4535 100 -------------------------------------------------------------------------------- 2 ROBINSON 2 4536 100 -------------------------------------------------------------------------------- 2 SEQUOYAH 1 4537 100 -------------------------------------------------------------------------------- 2 SEQUOYAH 2 4537 000 04/20 06/02 MODE 6 - REFUELING * REFUELING OUTAGE - FUEL RELOAD COMPLETE -------------------------------------------------------------------------------- 2 ST LUCIE 1 4538 000 04/29 06/26 MODE 6 - REFUELING REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 2 ST LUCIE 2 4538 100 -------------------------------------------------------------------------------- 2 SUMMER 1 4539 003 MODE 2 - STARTUP * EXITING REFUELING OUTAGE - MAY PLACE UNIT ON LINE LATE THIS AFTERNOON -------------------------------------------------------------------------------- 2 SURRY 1 4540 100 -------------------------------------------------------------------------------- 2 SURRY 2 4540 000 05/03 06/08 MODE 6 - REFUELING REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 2 TURKEY POINT 3 4541 100 -------------------------------------------------------------------------------- 2 TURKEY POINT 4 4541 100 -------------------------------------------------------------------------------- 2 VOGTLE 1 4542 100 -------------------------------------------------------------------------------- 2 VOGTLE 2 4542 100 -------------------------------------------------------------------------------- 2 WATTS BAR 1 2249 081 HOLDING REACTOR POWER AT * THIS LEVEL IN ORDER TO PLACE THE SECOND FEEDWATER PUMP IN SERVICE -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 05/22/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 3 BIG ROCK POINT 1 4544 095 FULL POWER BASED ON FUEL * LIMITS -------------------------------------------------------------------------------- 3 BRAIDWOOD 1 4545 100 -------------------------------------------------------------------------------- 3 BRAIDWOOD 2 4545 095 INCREASING POWER * -------------------------------------------------------------------------------- 3 BYRON 1 4546 000 04/05 06/26 MODE 5 - COLD SHUTDOWN * REFUELING OUTAGE - STEAM GENERATOR TUBE REPAIRS IN PROGRESS -------------------------------------------------------------------------------- 3 BYRON 2 4546 100 -------------------------------------------------------------------------------- 3 CLINTON 1 4548 100 -------------------------------------------------------------------------------- 3 COOK 1 4549 100 -------------------------------------------------------------------------------- 3 COOK 2 4549 100 -------------------------------------------------------------------------------- 3 DAVIS BESSE 1 4550 000 04/08 05/28 MODE 4 - HOT SHUTDOWN * EXITING REFUELING OUTAGE -------------------------------------------------------------------------------- 3 DRESDEN 2 4551 063 HOLDING POWER LEVEL FOR * REACTOR FEEDWATER TESTING -------------------------------------------------------------------------------- 3 DRESDEN 3 4551 000 05/15 05/24 COND 4 - COLD SHUTDOWN * MAINTENANCE OUTAGE FOLLOWING LOW LEVEL REACTOR SCRAM ON 05/15/96 - PLAN TO ENTER STARTUP TOMORROW AND TO PLACE THE UNIT ON LINE THE FOLLOWING DAY -------------------------------------------------------------------------------- 3 DUANE ARNOLD 1 4552 043 HOLDING AT THIS POWER * LEVEL TO TROUBLESHOOT AND REPAIR 'B' RECIRC PUMP MG SET -------------------------------------------------------------------------------- 3 FERMI 2 4553 096 FULL POWER LIMIT * -------------------------------------------------------------------------------- 3 KEWAUNEE 1 4554 098 POWER LIMITED DUE TO * STEAM GENERATOR TUBE PLUGGING -------------------------------------------------------------------------------- 3 LASALLE 1 4555 080 HOLDING POWER AT THIS * LEVEL TO PERFORM LPRM CALIBRATIONS -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 05/22/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 3 LASALLE 2 4555 000 05/21 05/23 COND 3 - HOT SHUTDOWN * UNIT SHUT DOWN DUE TO EHC PROBLEMS - PLAN TO PERFORM TROUBLESHOOTING - PLAN TO ENTER STARTUP TOMORROW AND TO PLACE UNIT ON LINE AT 2400 ON 05/23/96 -------------------------------------------------------------------------------- 3 MONTICELLO 1 4556 020 HOLDING POWER AT THIS * LEVEL TO PERFORM MAIN TURBINE TESTING -------------------------------------------------------------------------------- 3 PALISADES 1 4557 100 -------------------------------------------------------------------------------- 3 PERRY 1 4558 100 -------------------------------------------------------------------------------- 3 POINT BEACH 1 4559 100 -------------------------------------------------------------------------------- 3 POINT BEACH 2 4559 090 MAXIMUM POWER LEVEL DUE * TO RCS FLOW CONSIDERATIONS -------------------------------------------------------------------------------- 3 PRAIRIE ISLAND 1 4560 100 -------------------------------------------------------------------------------- 3 PRAIRIE ISLAND 2 4560 100 -------------------------------------------------------------------------------- 3 QUAD CITIES 1 4561 000 02/10 05/29 COND 4 - COLD SHUTDOWN REFUELING OUTAGE -------------------------------------------------------------------------------- 3 QUAD CITIES 2 4561 000 05/10 UNK COND 4 - COLD SHUTDOWN MAINTENANCE OUTAGE -------------------------------------------------------------------------------- 3 ZION 1 4562 100 -------------------------------------------------------------------------------- 3 ZION 2 4562 001 MODE 2 - STARTUP * UNIT SHUT DOWN ON 05/19/96 DUE TO BOTH EDGs BEING DECLARED INOPERABLE (REFER TO EVENT #30496) - UNIT CRITICAL - PLAN TO PLACE UNIT ON LINE TODAY -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 05/22/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 4 ARKANSAS NUCLEAR 1 4563 000 05/19 05/23 MODE 4 - HOT SHUTDOWN * REACTOR MANUALLY TRIPPED AFTER LOSS OF BOTH MAIN FEEDWATER PUMPS (REFER TO EVENT #30495) - PLAN TO ENTER STARTUP TOMORROW AND TO PLACE UNIT ON LINE EITHER LATE TOMORROW OR 05/24/96 -------------------------------------------------------------------------------- 4 ARKANSAS NUCLEAR 2 4563 098 -------------------------------------------------------------------------------- 4 CALLAWAY 1 4564 100 -------------------------------------------------------------------------------- 4 COMANCHE PEAK 1 4565 100 -------------------------------------------------------------------------------- 4 COMANCHE PEAK 2 4565 096 HOLDING POWER AT THIS * LEVEL DUE TO REHEATER DRAIN TANK CHECK VALVE PROBLEM -------------------------------------------------------------------------------- 4 COOPER 1 4566 097 FOLLOWING LOAD SCHEDULE * -------------------------------------------------------------------------------- 4 DIABLO CANYON 1 4567 100 -------------------------------------------------------------------------------- 4 DIABLO CANYON 2 4567 000 04/06 05/24 MODE 2 - STARTUP * EXITING REFUELING OUTAGE - UNIT CRITICAL - PERFORMING LOW POWER PHYSICS TESTING -------------------------------------------------------------------------------- 4 FT CALHOUN 1 4568 100 -------------------------------------------------------------------------------- 4 GRAND GULF 1 4569 100 -------------------------------------------------------------------------------- 4 PALO VERDE 1 4570 100 -------------------------------------------------------------------------------- 4 PALO VERDE 2 4570 100 -------------------------------------------------------------------------------- 4 PALO VERDE 3 4570 100 -------------------------------------------------------------------------------- 4 RIVER BEND 1 4571 100 -------------------------------------------------------------------------------- 4 SAN ONOFRE 2 4572 099 -------------------------------------------------------------------------------- 4 SAN ONOFRE 3 4572 099 * -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 05/22/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 4 SOUTH TEXAS 1 4573 000 05/18 06/14 MODE 6 - REFUELING * FEFUELING OUTAGE - PLAN TO BEGIN OFFLOADING FUEL IN APPROXIMATELY 18 HOURS -------------------------------------------------------------------------------- 4 SOUTH TEXAS 2 4573 100 -------------------------------------------------------------------------------- 4 WASHINGTON NUCLEAR 2 4574 000 03/02 06/06 COND 5 - REFUELING * REFUELING OUTAGE - RELOADING FUEL INTO THE CORE -------------------------------------------------------------------------------- 4 WATERFORD 3 4575 100 -------------------------------------------------------------------------------- 4 WOLF CREEK 1 4576 100 -------------------------------------------------------------------------------- * - REASON OR COMMENT HAS BEEN CHANGED IN PAST 24 HOURS # - NUMBER OF REACTOR SCRAMS WITHIN PAST 24 HOURS NOTE - REACTOR STATUS DATA COLLECTED BETWEEN 4 A.M. AND 8 A.M. EACH DAY. ALL TIMES ARE BASED ON EASTERN TIMES (ET).