NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 02/02/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 1 BEAVER VALLEY 1 4501 100 -------------------------------------------------------------------------------- 1 BEAVER VALLEY 2 4501 100 -------------------------------------------------------------------------------- 1 CALVERT CLIFFS 1 4502 100 -------------------------------------------------------------------------------- 1 CALVERT CLIFFS 2 4502 100 -------------------------------------------------------------------------------- 1 FITZPATRICK 1 4503 100 -------------------------------------------------------------------------------- 1 GINNA 1 4504 097 -------------------------------------------------------------------------------- 1 HADDAM NECK 1 4505 100 -------------------------------------------------------------------------------- 1 HOPE CREEK 1 4506 000 11/95 02/25 COND 5 - REFUELING REFUELING OUTAGE - FUEL LOAD AND SHUFFLE COMPLETE -------------------------------------------------------------------------------- 1 INDIAN POINT 2 4507 100 -------------------------------------------------------------------------------- 1 INDIAN POINT 3 4508 000 09/95 02/15 MODE 5 - COLD SHUTDOWN MAINTENANCE OUTAGE -------------------------------------------------------------------------------- 1 LIMERICK 1 4509 030 PERFORMING SHUTDOWN * PROCEDURE. PLAN TO START REFUELING OUTAGE TODAY. -------------------------------------------------------------------------------- 1 LIMERICK 2 4509 100 -------------------------------------------------------------------------------- 1 MAINE YANKEE 1 4510 090 POWER LIMITED BY CORE COOLING AND CONTAINMENT PRESSURE ACCIDENT ANALYSIS -------------------------------------------------------------------------------- 1 MILLSTONE 1 4511 000 11/95 02/29 COND 5 - REFUELING REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 1 MILLSTONE 2 4512 100 -------------------------------------------------------------------------------- 1 MILLSTONE 3 4513 100 -------------------------------------------------------------------------------- 1 NINE MILE POINT 1 4514 100 -------------------------------------------------------------------------------- 1 NINE MILE POINT 2 4514 100 -------------------------------------------------------------------------------- 1 OYSTER CREEK 1 4515 100 -------------------------------------------------------------------------------- 1 PEACH BOTTOM 2 4516 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 02/02/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 1 PEACH BOTTOM 3 4516 055 PERFORMING CONDENSER * WATERBOX REPAIRS -------------------------------------------------------------------------------- 1 PILGRIM 1 4517 100 -------------------------------------------------------------------------------- 1 SALEM 1 4518 000 05/95 07/01 MODE 6 - REFUELING REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 1 SALEM 2 4518 000 06/95 07/01 MODE 6 - REFUELING REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 1 SEABROOK 1 4519 018 PREPARING TO PLACE UNIT * BACK ON LINE FOLLOWING GENERATOR STATOR COOLANT FLOW PROBLEMS -------------------------------------------------------------------------------- 1 SUSQUEHANNA 1 4520 100 -------------------------------------------------------------------------------- 1 SUSQUEHANNA 2 4520 100 -------------------------------------------------------------------------------- 1 THREE MILE ISLAND 1 4521 100 -------------------------------------------------------------------------------- 1 VERMONT YANKEE 1 4522 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 02/02/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 2 BROWNS FERRY 1 4525 000 03/85 UNK COND 5 - REFUELING DEFUELED -------------------------------------------------------------------------------- 2 BROWNS FERRY 2 4525 099 COASTDOWN TO REFUELING OUTAGE. PLAN TO START REFUELING OUTAGE ON 03/22/96. -------------------------------------------------------------------------------- 2 BROWNS FERRY 3 4525 100 -------------------------------------------------------------------------------- 2 BRUNSWICK 1 4526 100 -------------------------------------------------------------------------------- 2 BRUNSWICK 2 4526 057 COASTDOWN TO REFUELING * OUTAGE. PLAN TO START REFUELING OUTAGE TODAY. -------------------------------------------------------------------------------- 2 CATAWBA 1 4527 100 -------------------------------------------------------------------------------- 2 CATAWBA 2 4527 100 -------------------------------------------------------------------------------- 2 CRYSTAL RIVER 3 4528 100 -------------------------------------------------------------------------------- 2 FARLEY 1 4529 100 -------------------------------------------------------------------------------- 2 FARLEY 2 4529 100 * -------------------------------------------------------------------------------- 2 HARRIS 1 4531 100 -------------------------------------------------------------------------------- 2 HATCH 1 4532 092 COASTDOWN TO REFUELING OUTAGE. PLAN TO START REFUELING OUTAGE ON 03/23/96. -------------------------------------------------------------------------------- 2 HATCH 2 4532 100 -------------------------------------------------------------------------------- 2 MCGUIRE 1 4533 100 -------------------------------------------------------------------------------- 2 MCGUIRE 2 4533 100 -------------------------------------------------------------------------------- 2 NORTH ANNA 1 4534 071 COASTDOWN TO REFUELING * OUTAGE. PLAN TO START REFUELING OUTAGE ON 02/11/96. -------------------------------------------------------------------------------- 2 NORTH ANNA 2 4534 100 -------------------------------------------------------------------------------- 2 OCONEE 1 4535 100 -------------------------------------------------------------------------------- 2 OCONEE 2 4535 100 -------------------------------------------------------------------------------- 2 OCONEE 3 4535 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 02/02/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 2 ROBINSON 2 4536 100 -------------------------------------------------------------------------------- 2 SEQUOYAH 1 4537 100 -------------------------------------------------------------------------------- 2 SEQUOYAH 2 4537 100 -------------------------------------------------------------------------------- 2 ST LUCIE 1 4538 100 -------------------------------------------------------------------------------- 2 ST LUCIE 2 4538 100 -------------------------------------------------------------------------------- 2 SUMMER 1 4539 100 -------------------------------------------------------------------------------- 2 SURRY 1 4540 100 -------------------------------------------------------------------------------- 2 SURRY 2 4540 100 -------------------------------------------------------------------------------- 2 TURKEY POINT 3 4541 060 PERFORMING WATERBOX * CLEANING FOLLOWING TURBINE VALVE TESTING AND REMOVAL OF AQUATIC GRASS FROM THE INTAKE STRUCTURE (REFER TO EVENT #29919.) -------------------------------------------------------------------------------- 2 TURKEY POINT 4 4541 100 -------------------------------------------------------------------------------- 2 VOGTLE 1 4542 100 -------------------------------------------------------------------------------- 2 VOGTLE 2 4542 100 -------------------------------------------------------------------------------- 2 WATTS BAR 1 2249 002 MODE 2 - STARTUP COMPLETED LOW POWER TESTING. WAITING FOR PERMISSION TO INCREASE POWER. -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 02/02/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 3 BIG ROCK POINT 1 4544 000 01/05 03/06 COND 5 - REFUELING REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 3 BRAIDWOOD 1 4545 100 -------------------------------------------------------------------------------- 3 BRAIDWOOD 2 4545 100 -------------------------------------------------------------------------------- 3 BYRON 1 4546 097 -------------------------------------------------------------------------------- 3 BYRON 2 4546 100 -------------------------------------------------------------------------------- 3 CLINTON 1 4548 100 -------------------------------------------------------------------------------- 3 COOK 1 4549 100 -------------------------------------------------------------------------------- 3 COOK 2 4549 100 -------------------------------------------------------------------------------- 3 DAVIS BESSE 1 4550 100 -------------------------------------------------------------------------------- 3 DRESDEN 2 4551 000 06/95 02/22 COND 5 - REFUELING REFUELING OUTAGE - FUEL LOAD COMPLETE -------------------------------------------------------------------------------- 3 DRESDEN 3 4551 100 -------------------------------------------------------------------------------- 3 DUANE ARNOLD 1 4552 100 -------------------------------------------------------------------------------- 3 FERMI 2 4553 096 -------------------------------------------------------------------------------- 3 KEWAUNEE 1 4554 098 -------------------------------------------------------------------------------- 3 LASALLE 1 4555 000 01/25 04/05 COND 5 - REFUELING * REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS - 170 BUNDLES REMOVED -------------------------------------------------------------------------------- 3 LASALLE 2 4555 095 INCREASING POWER * -------------------------------------------------------------------------------- 3 MONTICELLO 1 4556 096 COASTDOWN TO REFUELING OUTAGE. PLAN TO START REFUELING OUTAGE ON 04/10/96. -------------------------------------------------------------------------------- 3 PALISADES 1 4557 100 * -------------------------------------------------------------------------------- 3 PERRY 1 4558 000 01/27 03/29 COND 5 - REFUELING REFUELING OUTAGE - CORE ALTERATIONS HAVE NOT COMMENCED. -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 02/02/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 3 POINT BEACH 1 4559 100 -------------------------------------------------------------------------------- 3 POINT BEACH 2 4559 090 FULL POWER LIMIT -------------------------------------------------------------------------------- 3 PRAIRIE ISLAND 1 4560 000 01/05 02/14 MODE 6 - REFUELING REFUELING OUTAGE - FUEL SHUFFLE SUSPENDED -------------------------------------------------------------------------------- 3 PRAIRIE ISLAND 2 4560 100 -------------------------------------------------------------------------------- 3 QUAD CITIES 1 4561 093 COASTDOWN TO REFUELING * OUTAGE. PLAN TO START REFUELING OUTAGE ON 02/10/96. -------------------------------------------------------------------------------- 3 QUAD CITIES 2 4561 100 -------------------------------------------------------------------------------- 3 ZION 1 4562 100 -------------------------------------------------------------------------------- 3 ZION 2 4562 001 MODE 2 - STARTUP HOLDING REACTOR POWER AT 1%. TROUBLESHOOTING AUXILIARY FEEDWATER FLOW TO STEAM GENERATOR "2A" HEADER (NOT GETTING ENOUGH FLOW THROUGH VALVE INTO HEADER). FLOW IS WITHIN MIN TECH SPEC LIMITS. -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 02/02/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 4 ARKANSAS NUCLEAR 1 4563 090 HOLDING POWER AT THIS * LEVEL DUE TO FLOW BLOCKAGE ON HIGH PRESSURE FEEDWATER HEATER E1B -------------------------------------------------------------------------------- 4 ARKANSAS NUCLEAR 2 4563 098 -------------------------------------------------------------------------------- 4 CALLAWAY 1 4564 100 -------------------------------------------------------------------------------- 4 COMANCHE PEAK 1 4565 000 01/22 02/04 MODE 4 - HOT SHUTDOWN * MAINTENANCE OUTAGE -------------------------------------------------------------------------------- 4 COMANCHE PEAK 2 4565 100 -------------------------------------------------------------------------------- 4 COOPER 1 4566 100 -------------------------------------------------------------------------------- 4 DIABLO CANYON 1 4567 100 -------------------------------------------------------------------------------- 4 DIABLO CANYON 2 4567 100 -------------------------------------------------------------------------------- 4 FT CALHOUN 1 4568 100 -------------------------------------------------------------------------------- 4 GRAND GULF 1 4569 100 -------------------------------------------------------------------------------- 4 PALO VERDE 1 4570 100 -------------------------------------------------------------------------------- 4 PALO VERDE 2 4570 100 -------------------------------------------------------------------------------- 4 PALO VERDE 3 4570 100 -------------------------------------------------------------------------------- 4 RIVER BEND 1 4571 000 01/04 02/11 COND 4 - COLD SHUTDOWN * EXITING REFUELING OUTAGE. -------------------------------------------------------------------------------- 4 SAN ONOFRE 2 4572 100 * -------------------------------------------------------------------------------- 4 SAN ONOFRE 3 4572 100 * -------------------------------------------------------------------------------- 4 SOUTH TEXAS 1 4573 100 -------------------------------------------------------------------------------- 4 SOUTH TEXAS 2 4573 100 -------------------------------------------------------------------------------- 4 WASHINGTON NUCLEAR 2 4574 100 -------------------------------------------------------------------------------- 4 WATERFORD 3 4575 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 02/02/96 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 4 WOLF CREEK 1 4576 000 01/30 UNK MODE 5 - COLD SHUTDOWN MANUAL REACTOR TRIP DUE TO ICE BUILDUP IN INTAKE STRUCTURE. TRAIN 'A' ESW IN SERVICE BUT NOT OPERABLE. UNUSUAL EVENT DECLARED, EXITED, AND DECLARED AGAIN. (REFER TO EVENT NUMBERS 29904, 29905, AND 29913.) -------------------------------------------------------------------------------- * - REASON OR COMMENT HAS BEEN CHANGED IN PAST 24 HOURS # - NUMBER OF REACTOR SCRAMS WITHIN PAST 24 HOURS NOTE - REACTOR STATUS DATA COLLECTED BETWEEN 4 A.M. AND 8 A.M. EACH DAY. ALL TIMES ARE BASED ON EASTERN TIMES (ET).