NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 09/29/95 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 1 BEAVER VALLEY 1 4501 100 -------------------------------------------------------------------------------- 1 BEAVER VALLEY 2 4501 100 -------------------------------------------------------------------------------- 1 CALVERT CLIFFS 1 4502 100 -------------------------------------------------------------------------------- 1 CALVERT CLIFFS 2 4502 100 -------------------------------------------------------------------------------- 1 FITZPATRICK 1 4503 100 -------------------------------------------------------------------------------- 1 GINNA 1 4504 096 -------------------------------------------------------------------------------- 1 HADDAM NECK 1 4505 100 -------------------------------------------------------------------------------- 1 HOPE CREEK 1 4506 100 END OF CYCLE COASTDOWN. * OUTAGE SCHEDULED TO COMMENCE ON 11/11/95. -------------------------------------------------------------------------------- 1 INDIAN POINT 2 4507 100 -------------------------------------------------------------------------------- 1 INDIAN POINT 3 4508 000 09/14 09/30 MODE 5 - COLD SHUTDOWN MAINTENANCE OUTAGE. -------------------------------------------------------------------------------- 1 LIMERICK 1 4509 100 -------------------------------------------------------------------------------- 1 LIMERICK 2 4509 100 -------------------------------------------------------------------------------- 1 MAINE YANKEE 1 4510 000 01/14 12/01 MODE 6 - REFUELING DEFUELED - SLEEVING STEAM GENERATOR TUBES -------------------------------------------------------------------------------- 1 MILLSTONE 1 4511 100 -------------------------------------------------------------------------------- 1 MILLSTONE 2 4512 100 -------------------------------------------------------------------------------- 1 MILLSTONE 3 4513 100 -------------------------------------------------------------------------------- 1 NINE MILE POINT 1 4514 100 -------------------------------------------------------------------------------- 1 NINE MILE POINT 2 4514 097 INCREASING POWER. * -------------------------------------------------------------------------------- 1 OYSTER CREEK 1 4515 100 -------------------------------------------------------------------------------- 1 PEACH BOTTOM 2 4516 100 -------------------------------------------------------------------------------- 1 PEACH BOTTOM 3 4516 000 09/22 10/28 COND 4 - COLD SHUTDOWN REFUELING OUTAGE -------------------------------------------------------------------------------- 1 PILGRIM 1 4517 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 09/29/95 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 1 SALEM 1 4518 000 05/16 04/96 MODE 6 - REFUELING MAINTENANCE OUTAGE- DEFUELED -------------------------------------------------------------------------------- 1 SALEM 2 4518 000 06/07 07/96 MODE 5 - COLD SHUTDOWN MAINTENANCE OUTAGE -------------------------------------------------------------------------------- 1 SEABROOK 1 4519 100 -------------------------------------------------------------------------------- 1 SUSQUEHANNA 1 4520 100 -------------------------------------------------------------------------------- 1 SUSQUEHANNA 2 4520 000 09/13 10/18 COND 5 - REFUELING -------------------------------------------------------------------------------- 1 THREE MILE ISLAND 1 4521 000 09/08 10/08 MODE 6 - REFUELING * CORE RELOAD ON HOLD PENDING REPAIR OF ONCE BURNT FUEL. -------------------------------------------------------------------------------- 1 VERMONT YANKEE 1 4522 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 09/29/95 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 2 BROWNS FERRY 1 4525 000 03/85 UNK COND 5 - REFUELING DEFUELED -------------------------------------------------------------------------------- 2 BROWNS FERRY 2 4525 100 -------------------------------------------------------------------------------- 2 BROWNS FERRY 3 4525 000 03/85 02/96 COND 5 - REFUELING DEFUELED - FUEL LOAD SCHEDULED FOR 10/7/95. -------------------------------------------------------------------------------- 2 BRUNSWICK 1 4526 100 -------------------------------------------------------------------------------- 2 BRUNSWICK 2 4526 092 COASTDOWN TO REFUELING * OUTAGE. -------------------------------------------------------------------------------- 2 CATAWBA 1 4527 100 -------------------------------------------------------------------------------- 2 CATAWBA 2 4527 100 -------------------------------------------------------------------------------- 2 CRYSTAL RIVER 3 4528 097 * -------------------------------------------------------------------------------- 2 FARLEY 1 4529 000 09/15 10/19 MODE 6 - REFUELING DEFUELED -------------------------------------------------------------------------------- 2 FARLEY 2 4529 100 -------------------------------------------------------------------------------- 2 GRAND GULF 1 4530 100 -------------------------------------------------------------------------------- 2 HARRIS 1 4531 000 09/01 10/06 MODE 6 - REFUELING CORE RELOAD IN PROGRESS. -------------------------------------------------------------------------------- 2 HATCH 1 4532 100 -------------------------------------------------------------------------------- 2 HATCH 2 4532 000 09/22 11/01 COND 5 - REFUELING CORE OFFLOAD IN PROGRESS. -------------------------------------------------------------------------------- 2 MCGUIRE 1 4533 004 MODE 2 - STARTUP * STARTUP ON HOLD FOR CONTAINMENT ENTRY TO REPAIR A DRAIN VALVE. -------------------------------------------------------------------------------- 2 MCGUIRE 2 4533 100 -------------------------------------------------------------------------------- 2 NORTH ANNA 1 4534 100 -------------------------------------------------------------------------------- 2 NORTH ANNA 2 4534 100 -------------------------------------------------------------------------------- 2 OCONEE 1 4535 100 -------------------------------------------------------------------------------- 2 OCONEE 2 4535 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 09/29/95 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 2 OCONEE 3 4535 100 -------------------------------------------------------------------------------- 2 ROBINSON 2 4536 100 -------------------------------------------------------------------------------- 2 SEQUOYAH 1 4537 000 09/09 10/28 MODE 6 - REFUELING DEFUELED -------------------------------------------------------------------------------- 2 SEQUOYAH 2 4537 100 -------------------------------------------------------------------------------- 2 ST LUCIE 1 4538 000 08/01 10/08 MODE 3 - HOT STANDBY * MAINTENANCE OUTAGE. THE PLANT IS COOLING DOWN TO REPAIR TWO LEAKING PRESSURIZER CODE SAFETY VALVES. THESE VALVES HAD BEEN WORKED ON DURING THE OUTAGE. -------------------------------------------------------------------------------- 2 ST LUCIE 2 4538 089 COASTDOWN TO REFULEING OUTAGE SCHEDULED TO COMMENCE 10/8/95. -------------------------------------------------------------------------------- 2 SUMMER 1 4539 100 -------------------------------------------------------------------------------- 2 SURRY 1 4540 000 09/07 10/14 MODE 6 - REFUELING -------------------------------------------------------------------------------- 2 SURRY 2 4540 100 -------------------------------------------------------------------------------- 2 TURKEY POINT 3 4541 000 09/03 10/08 MODE 5 - COLD SHUTDOWN REFUELING OUTAGE -------------------------------------------------------------------------------- 2 TURKEY POINT 4 4541 100 -------------------------------------------------------------------------------- 2 VOGTLE 1 4542 100 * -------------------------------------------------------------------------------- 2 VOGTLE 2 4542 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 09/29/95 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 3 BIG ROCK POINT 1 4544 083 COASTDOWN TO REFUELING OUTAGE SCHEDULED TO COMMENCE 1/6/96. -------------------------------------------------------------------------------- 3 BRAIDWOOD 1 4545 081 COASTDOWN TO REFUELING OUTAGE SCHEDULED TO COMMENCE 09/30/95. -------------------------------------------------------------------------------- 3 BRAIDWOOD 2 4545 100 -------------------------------------------------------------------------------- 3 BYRON 1 4546 099 AT FULL POWER -------------------------------------------------------------------------------- 3 BYRON 2 4546 100 -------------------------------------------------------------------------------- 3 CALLAWAY 1 4547 098 * -------------------------------------------------------------------------------- 3 CLINTON 1 4548 100 -------------------------------------------------------------------------------- 3 COOK 1 4549 000 07/16 UNK MODE 6 - REFUELING * CORE RELOAD IN PROGRESS. -------------------------------------------------------------------------------- 3 COOK 2 4549 100 -------------------------------------------------------------------------------- 3 DAVIS BESSE 1 4550 100 -------------------------------------------------------------------------------- 3 DRESDEN 2 4551 000 06/05 11/01 COND 5 - REFUELING REFUELING OUTAGE - DEFUELED -------------------------------------------------------------------------------- 3 DRESDEN 3 4551 000 09/28 UNK COND 3 - HOT SHUTDOWN * # REACTOR SCRAM ON GENERATOR TRIP. SEE EVENT 29390. THE PLANT IS COOLING DOWN TO REPAIR A RWCU RELIEF VALVE THAT LIFTED DURING THE TRANSIENT. -------------------------------------------------------------------------------- 3 DUANE ARNOLD 1 4552 100 -------------------------------------------------------------------------------- 3 FERMI 2 4553 096 -------------------------------------------------------------------------------- 3 KEWAUNEE 1 4554 096 * -------------------------------------------------------------------------------- 3 LASALLE 1 4555 032 HOLDING POWER TO REPAIR * A PROBLEM WITH THE "A" TURBINE DRIVEN FEED PUMP. -------------------------------------------------------------------------------- 3 LASALLE 2 4555 068 ROD SHUFFLE. * -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 09/29/95 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 3 MONTICELLO 1 4556 100 -------------------------------------------------------------------------------- 3 PALISADES 1 4557 100 -------------------------------------------------------------------------------- 3 PERRY 1 4558 100 -------------------------------------------------------------------------------- 3 POINT BEACH 1 4559 100 -------------------------------------------------------------------------------- 3 POINT BEACH 2 4559 100 -------------------------------------------------------------------------------- 3 PRAIRIE ISLAND 1 4560 100 -------------------------------------------------------------------------------- 3 PRAIRIE ISLAND 2 4560 100 -------------------------------------------------------------------------------- 3 QUAD CITIES 1 4561 100 * -------------------------------------------------------------------------------- 3 QUAD CITIES 2 4561 100 -------------------------------------------------------------------------------- 3 ZION 1 4562 000 09/09 11/12 MODE 6 - REFUELING REFUELING OUTAGE. -------------------------------------------------------------------------------- 3 ZION 2 4562 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 09/29/95 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 4 ARKANSAS NUCLEAR 1 4563 100 -------------------------------------------------------------------------------- 4 ARKANSAS NUCLEAR 2 4563 000 09/22 10/20 MODE 6 - REFUELING * REFUELING OUTAGE -------------------------------------------------------------------------------- 4 COMANCHE PEAK 1 4564 100 -------------------------------------------------------------------------------- 4 COMANCHE PEAK 2 4564 100 -------------------------------------------------------------------------------- 4 COOPER 1 4565 089 COASTDOWN TO REFUELING OUTAGE. OUTAGE IS SCHEDULED TO COMMENCE 10/12/95. -------------------------------------------------------------------------------- 4 DIABLO CANYON 1 4566 097 -------------------------------------------------------------------------------- 4 DIABLO CANYON 2 4566 000 09/23 09/30 MODE 3 - HOT STANDBY REACTOR TRIP FOLLOWING A FAILURE OF BOTH CIRCULATING WATER PUMP TRAVELING SCREENS DUE TO HIGH KELP LOADING. SEE EVENT #29366. -------------------------------------------------------------------------------- 4 FT CALHOUN 1 4567 100 -------------------------------------------------------------------------------- 4 PALO VERDE 1 4568 100 -------------------------------------------------------------------------------- 4 PALO VERDE 2 4568 100 -------------------------------------------------------------------------------- 4 PALO VERDE 3 4568 100 -------------------------------------------------------------------------------- 4 RIVER BEND 1 4569 100 -------------------------------------------------------------------------------- 4 SAN ONOFRE 2 4571 100 * -------------------------------------------------------------------------------- 4 SAN ONOFRE 3 4571 068 INCREASING POWER. * -------------------------------------------------------------------------------- 4 SOUTH TEXAS 1 4572 100 -------------------------------------------------------------------------------- 4 SOUTH TEXAS 2 4572 100 -------------------------------------------------------------------------------- 4 WASHINGTON NUCLEAR 2 4574 100 -------------------------------------------------------------------------------- 4 WATERFORD 3 4575 000 09/22 11/01 MODE 6 - REFUELING REFUELING OUTAGE -------------------------------------------------------------------------------- 4 WOLF CREEK 1 4576 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 09/29/95 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - * - REASON OR COMMENT HAS BEEN CHANGED IN PAST 24 HOURS # - NUMBER OF REACTOR SCRAMS WITHIN PAST 24 HOURS NOTE - REACTOR STATUS DATA COLLECTED BETWEEN 4 A.M. AND 8 A.M. EACH DAY. ALL TIMES ARE BASED ON EASTERN TIMES (ET).