NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 07/11/94 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 1 BEAVER VALLEY 1 4501 100 * -------------------------------------------------------------------------------- 1 BEAVER VALLEY 2 4501 100 -------------------------------------------------------------------------------- 1 CALVERT CLIFFS 1 4502 100 -------------------------------------------------------------------------------- 1 CALVERT CLIFFS 2 4502 100 -------------------------------------------------------------------------------- 1 FITZPATRICK 1 4503 025 TURBINE CONTROL VALVE * MAINTENANCE -------------------------------------------------------------------------------- 1 GINNA 1 4504 097 * -------------------------------------------------------------------------------- 1 HADDAM NECK 1 4505 100 -------------------------------------------------------------------------------- 1 HOPE CREEK 1 4506 100 * -------------------------------------------------------------------------------- 1 INDIAN POINT 2 4507 090 FUEL OPTIMIZATION -------------------------------------------------------------------------------- 1 INDIAN POINT 3 4508 000 02/93 10/01 MODE 5 - COLD SHUTDOWN MAINTENANCE OUTAGE -------------------------------------------------------------------------------- 1 LIMERICK 1 4509 100 -------------------------------------------------------------------------------- 1 LIMERICK 2 4509 100 -------------------------------------------------------------------------------- 1 MAINE YANKEE 1 4510 100 -------------------------------------------------------------------------------- 1 MILLSTONE 1 4511 100 -------------------------------------------------------------------------------- 1 MILLSTONE 2 4512 100 -------------------------------------------------------------------------------- 1 MILLSTONE 3 4513 098 * -------------------------------------------------------------------------------- 1 NINE MILE POINT 1 4514 000 07/10 UNK COND 3 - HOT SHUTDOWN * # REACTOR SCRAM ON FAILED ELECTRONIC PRESSURE REGULATOR. SEE EVENT #27517 -------------------------------------------------------------------------------- 1 NINE MILE POINT 2 4514 100 -------------------------------------------------------------------------------- 1 OYSTER CREEK 1 4515 100 * -------------------------------------------------------------------------------- 1 PEACH BOTTOM 2 4516 091 COASTDOWN TO REFUELING -------------------------------------------------------------------------------- 1 PEACH BOTTOM 3 4516 100 -------------------------------------------------------------------------------- 1 PILGRIM 1 4517 100 * -------------------------------------------------------------------------------- 1 SALEM 1 4518 100 -------------------------------------------------------------------------------- 1 SALEM 2 4518 002 MODE 2 - STARTUP * STARTUP IN PROGRESS -------------------------------------------------------------------------------- 1 SEABROOK 1 4519 000 04/08 08/01 MODE 6 - REFUELING CORE RELOADED -------------------------------------------------------------------------------- 1 SUSQUEHANNA 1 4520 100 -------------------------------------------------------------------------------- 1 SUSQUEHANNA 2 4520 100 -------------------------------------------------------------------------------- 1 THREE MILE ISLAND 1 4521 100 -------------------------------------------------------------------------------- 1 VERMONT YANKEE 1 4522 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 07/11/94 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 2 BROWNS FERRY 1 4525 000 03/85 UNK COND 5 - REFUELING DEFUELED -------------------------------------------------------------------------------- 2 BROWNS FERRY 2 4525 100 -------------------------------------------------------------------------------- 2 BROWNS FERRY 3 4525 000 03/85 UNK COND 5 - REFUELING DEFUELED -------------------------------------------------------------------------------- 2 BRUNSWICK 1 4526 100 -------------------------------------------------------------------------------- 2 BRUNSWICK 2 4526 100 * -------------------------------------------------------------------------------- 2 CATAWBA 1 4527 100 * -------------------------------------------------------------------------------- 2 CATAWBA 2 4527 000 07/10 07/12 MODE 4 - HOT SHUTDOWN * # REACTOR TRIP ON LOSS OF FEEDWATER. SEE EVENT #27515. -------------------------------------------------------------------------------- 2 CRYSTAL RIVER 3 4528 100 -------------------------------------------------------------------------------- 2 FARLEY 1 4529 100 -------------------------------------------------------------------------------- 2 FARLEY 2 4529 100 -------------------------------------------------------------------------------- 2 GRAND GULF 1 4530 100 -------------------------------------------------------------------------------- 2 HARRIS 1 4531 100 * -------------------------------------------------------------------------------- 2 HATCH 1 4532 100 -------------------------------------------------------------------------------- 2 HATCH 2 4532 100 -------------------------------------------------------------------------------- 2 MCGUIRE 1 4533 100 -------------------------------------------------------------------------------- 2 MCGUIRE 2 4533 100 -------------------------------------------------------------------------------- 2 NORTH ANNA 1 4534 087 COASTDOWN TO REFUELING -------------------------------------------------------------------------------- 2 NORTH ANNA 2 4534 100 -------------------------------------------------------------------------------- 2 OCONEE 1 4535 100 -------------------------------------------------------------------------------- 2 OCONEE 2 4535 100 -------------------------------------------------------------------------------- 2 OCONEE 3 4535 000 07/05 07/17 MODE 5 - COLD SHUTDOWN * LETDOWN COOLER REPAIRS -------------------------------------------------------------------------------- 2 ROBINSON 2 4536 100 * -------------------------------------------------------------------------------- 2 SEQUOYAH 1 4537 100 -------------------------------------------------------------------------------- 2 SEQUOYAH 2 4537 000 07/04 11/15 MODE 5 - COLD SHUTDOWN REFUELING OUTAGE -------------------------------------------------------------------------------- 2 ST LUCIE 1 4538 100 -------------------------------------------------------------------------------- 2 ST LUCIE 2 4538 100 * -------------------------------------------------------------------------------- 2 SUMMER 1 4539 100 -------------------------------------------------------------------------------- 2 SURRY 1 4540 100 -------------------------------------------------------------------------------- 2 SURRY 2 4540 100 -------------------------------------------------------------------------------- 2 TURKEY POINT 3 4541 100 -------------------------------------------------------------------------------- 2 TURKEY POINT 4 4541 100 -------------------------------------------------------------------------------- 2 VOGTLE 1 4542 100 -------------------------------------------------------------------------------- 2 VOGTLE 2 4542 100 -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 07/11/94 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 3 BIG ROCK POINT 1 4544 093 -------------------------------------------------------------------------------- 3 BRAIDWOOD 1 4545 093 LOAD FOLLOWING * -------------------------------------------------------------------------------- 3 BRAIDWOOD 2 4545 099 * -------------------------------------------------------------------------------- 3 BYRON 1 4546 083 COASTDOWN TO REFUELING * -------------------------------------------------------------------------------- 3 BYRON 2 4546 083 LOAD FOLLOWING * -------------------------------------------------------------------------------- 3 CALLAWAY 1 4547 098 INCREASING TO 100% * -------------------------------------------------------------------------------- 3 CLINTON 1 4548 100 * -------------------------------------------------------------------------------- 3 COOK 1 4549 100 -------------------------------------------------------------------------------- 3 COOK 2 4549 090 LOAD FOLLOWING * -------------------------------------------------------------------------------- 3 DAVIS BESSE 1 4550 100 -------------------------------------------------------------------------------- 3 DRESDEN 2 4551 099 * -------------------------------------------------------------------------------- 3 DRESDEN 3 4551 000 03/10 07/16 COND 4 - COLD SHUTDOWN REFUELING OUTAGE:CORE RELOADED -------------------------------------------------------------------------------- 3 DUANE ARNOLD 1 4552 000 07/10 07/18 COND 3 - HOT SHUTDOWN * # REACTOR SCRAM ON EHC LEAK. SEE EVENT #27516. -------------------------------------------------------------------------------- 3 FERMI 2 4553 000 12/93 10/01 COND 5 - REFUELING DEFUELED -------------------------------------------------------------------------------- 3 KEWAUNEE 1 4554 100 -------------------------------------------------------------------------------- 3 LASALLE 1 4555 002 COND 2 - STARTUP * STARTUP IN PROGRESS -------------------------------------------------------------------------------- 3 LASALLE 2 4555 087 LOAD FOLLOWING * -------------------------------------------------------------------------------- 3 MONTICELLO 1 4556 100 -------------------------------------------------------------------------------- 3 PALISADES 1 4557 100 -------------------------------------------------------------------------------- 3 PERRY 1 4558 000 02/06 07/16 COND 4 - COLD SHUTDOWN PREPARING FOR HEATUP -------------------------------------------------------------------------------- 3 POINT BEACH 1 4559 100 -------------------------------------------------------------------------------- 3 POINT BEACH 2 4559 100 -------------------------------------------------------------------------------- 3 PRAIRIE ISLAND 1 4560 100 -------------------------------------------------------------------------------- 3 PRAIRIE ISLAND 2 4560 100 -------------------------------------------------------------------------------- 3 QUAD CITIES 1 4561 000 03/13 07/25 COND 4 - COLD SHUTDOWN * REFUELING-CORE RELOADED -------------------------------------------------------------------------------- 3 QUAD CITIES 2 4561 000 06/29 07/12 COND 4 - COLD SHUTDOWN PREPARING FOR HEATUP -------------------------------------------------------------------------------- 3 ZION 1 4562 000 07/02 07/13 MODE 3 - HOT STANDBY * HEATUP IN PROGRESS -------------------------------------------------------------------------------- 3 ZION 2 4562 087 LOAD FOLLOWING * -------------------------------------------------------------------------------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 07/11/94 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY ------------------------------------------------ REG PLANT NAME PHONE %PWR DOWN RESTART REASON OR COMMENT * # --- --------------------- ----- ---- ----- ------- ------------------------ - - 4 ARKANSAS NUCLEAR 1 4563 100 -------------------------------------------------------------------------------- 4 ARKANSAS NUCLEAR 2 4563 100 -------------------------------------------------------------------------------- 4 COMANCHE PEAK 1 4564 100 -------------------------------------------------------------------------------- 4 COMANCHE PEAK 2 4564 100 * -------------------------------------------------------------------------------- 4 COOPER 1 4565 000 05/25 07/12 COND 4 - COLD SHUTDOWN MAINTENANCE OUTAGE - - - - UNUSUAL EVENT UNTIL 1 OF 2 INOPERABLE EDGs CAN BE DECLARED OPERABLE. SEE EVENT #27295. -------------------------------------------------------------------------------- 4 DIABLO CANYON 1 4566 100 -------------------------------------------------------------------------------- 4 DIABLO CANYON 2 4566 100 * -------------------------------------------------------------------------------- 4 FT CALHOUN 1 4567 100 -------------------------------------------------------------------------------- 4 PALO VERDE 1 4568 098 ADMIN LIMIT OF 86% POWER DUE TO STRESS CORROSION IN THE STEAM GENERATORS LIMIT WAIVED DUE TO DEMAND WILL INCREASE POWER TO 100% -------------------------------------------------------------------------------- 4 PALO VERDE 2 4568 088 ADMIN LIMIT OF 88% POWER DUE TO STRESS CORROSION IN THE STEAM GENERATORS -------------------------------------------------------------------------------- 4 PALO VERDE 3 4568 100 -------------------------------------------------------------------------------- 4 RIVER BEND 1 4569 100 -------------------------------------------------------------------------------- 4 SAN ONOFRE 2 4571 098 -------------------------------------------------------------------------------- 4 SAN ONOFRE 3 4571 097 * -------------------------------------------------------------------------------- 4 SOUTH TEXAS 1 4572 100 -------------------------------------------------------------------------------- 4 SOUTH TEXAS 2 4572 100 -------------------------------------------------------------------------------- 4 WASHINGTON NUCLEAR 2 4574 000 04/26 07/13 COND 4 - COLD SHUTDOWN PREPARING FOR HEATUP -------------------------------------------------------------------------------- 4 WATERFORD 3 4575 100 -------------------------------------------------------------------------------- 4 WOLF CREEK 1 4576 099 -------------------------------------------------------------------------------- * - REASON OR COMMENT HAS BEEN CHANGED IN PAST 24 HOURS # - NUMBER OF REACTOR SCRAMS WITHIN PAST 24 HOURS NOTE - REACTOR STATUS DATA COLLECTED BETWEEN 4 A.M. AND 8 A.M. EACH DAY. ALL TIMES ARE BASED ON EASTERN TIMES (ET).