U.S. Nuclear Regulatory Commission Operations Center Event Reports For 05/08/97 - 05/09/97 ** EVENT NUMBERS ** 32244 32296 32297 32298 32299 32300 32301 32302 32303 !!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!!!! +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 32244 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: CATAWBA REGION: 2 |NOTIFICATION DATE: 04/30/97 | |UNIT: [ ] [2] [ ] STATE: SC |NOTIFICATION TIME: 07:43 [ET]| |RX TYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 04/30/97 | +------------------------------------------------+EVENT TIME: 05:24[EDT]| |NRC NOTIFIED BY: KEN DOVER |LAST UPDATE DATE: 05/08/97 | |HQ OPS OFFICER: JOHN MacKINNON +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |CHUCK CASTO RDO | |AESF 50.72(b)(2)(ii) ESF ACTUATION | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | | | 2 | N N 0 HOT STANDBY | 0 HOT STANDBY | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | DURING AN EVOLUTION, THE STEAM DUMPS ISOLATED DUE TO LOW REACTOR COOLANT | | SYSTEM TEMPERATURE. | | | | WHILE DRAINING MOISTURE FROM THE 2B FEEDWATER PUMP TURBINE, STEAM PRESSURE | | AND REACTOR COOLANT SYSTEM TEMPERATURE BEGAN TO DECREASE AS EXPECTED. WHEN | | THE DRAINS ON THE 2B FEEDWATER PUMP WERE RETURNED TO "AUTO," TWO OUT OF THE | | FIVE VALVES DID NOT CLOSE. THE SWITCH USED FOR THESE DRAINS IS AN | | "AUTO/CLOSE" SWITCH. DRAIN VALVES 2SP-23 AND 2SP-33 DID NOT CLOSE WHEN THE | | SWITCH WAS PLACED BACK IN "AUTO". THIS RESULTED IN REACTOR COOLANT SYSTEM | | TEMPERATURE DECREASING TO 547.6øF. REACTOR PROTECTION SYSTEM TRIP SIGNAL | | P-12 ACTUATED WHEN THE TWO-OUT-OF-FOUR LOOP LOW-LOW Tave LOGIC WAS | | SATISFIED. THE P-12 ACTUATION CAUSED THE STEAM DUMPS TO ISOLATE. | | | | THE DRAIN VALVES ON THE 2B FEEDWATER PUMP WERE MANUALLY ISOLATED, AND A | | WORK REQUEST HAS BEEN ISSUED TO INVESTIGATE/REPAIR THE PROBLEM. | | | | THE LICENSEE NOTIFIED THE NRC RESIDENT INSPECTOR. | | | | *** UPDATE AT 1521 ON 05/08/97, FROM TOWER TO GOULD *** THE LICENSEE IS | | RETRACTING THIS EVENT NOTIFICATION AFTER REVIEWING FINAL SAFETY ANALYSIS | | REPORT SECTION 7.3.1.1.1 AND DETERMINING THAT THE "P-12" LOW-LOW Tavg BLOCK | | OF THE STEAM DUMP VALVE OPERATION IS NOT LISTED OR DESCRIBED AS AN | | ENGINEERED SAFETY FEATURE FUNCTION AND SHOULD NOT HAVE BEEN REPORTED AS | | SUCH. | | | | THE NRC RESIDENT INSPECTOR WAS INFORMED BY THE LICENSEE. THE R2DO | | (CHRISTENSEN) WAS NOTIFIED BY THE NRC OPERATIONS CENTER. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 32296 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: DIABLO CANYON REGION: 4 |NOTIFICATION DATE: 05/08/97 | |UNIT: [1] [ ] [ ] STATE: CA |NOTIFICATION TIME: 14:17 [ET]| |RX TYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 05/08/97 | +------------------------------------------------+EVENT TIME: 09:17[PDT]| |NRC NOTIFIED BY: PIERCE |LAST UPDATE DATE: 05/08/97 | |HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |PHIL HARRELL RDO | |AESF 50.72(b)(2)(ii) ESF ACTUATION | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N N 0 REFUELING | 0 REFUELING | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | AUTOMATIC START AND LOADING OF DIESEL GENERATOR "1-1" DUE TO AN ERROR | | RELATED TO A CRAFT WORK ORDER | | | | AT 0917 PDT, 4.16-KV VITAL ELECTRICAL BUS "H" DE-ENERGIZED AND TRANSFERRED | | TO DIESEL GENERATOR "1-1" DUE TO AN ERROR OCCURRING WHILE PERFORMING CRAFT | | WORK ORDER #C0145944. A LEAD WAS BEING REMOVED FROM THE "27HHB2" RELAY AS | | PER THE WORK ORDER, AND THIS ACTIVATED THE BUS UNDERVOLTAGE AUTOMATIC | | TRANSFER SCHEME CAUSING THE DIESEL GENERATOR TO START AND LOAD ONTO BUS | | "H". THE LEAD WILL BE REPLACED. THE DIESEL AND BUS RELAYS WILL BE RESET, | | AND ALL RELATED SYSTEMS WILL BE RETURNED TO PRE-EVENT STATUS. THE WORK | | ORDER WILL BE TERMINATED AT THIS POINT UNTIL THE CAUSE OF THE EVENT, WHICH | | APPEARS TO BE WORK ORDER SEQUENCING, IS CORRECTED. AT THE TIME OF THE | | EVENT, ALL THREE VITAL BUSES WERE ENERGIZED, AND THE DIESELS ASSOCIATED | | WITH BUSES "H" AND "F" WERE AVAILABLE. ALL COOLING LOADS WERE ALIGNED TO | | THE OTHER VITAL BUSSES WHEN THIS TOOK PLACE. | | | | THE NRC RESIDENT INSPECTOR WAS INFORMED BY THE LICENSEE. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |HOSPITAL | |EVENT NUMBER: 32297 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |LICENSEE: ST MARY'S MEDICAL CENTER |NOTIFICATION DATE: 05/08/97 | | CITY: DULUTH REGION: 3 |NOTIFICATION TIME: 14:20 [ET]| | COUNTY: ST LOUIS STATE: MN |EVENT DATE: 05/08/97 | |LICENSE#: 22-02396-01 AGREEMENT: N |EVENT TIME: 11:45[CDT]| | DOCKET: |LAST UPDATE DATE: 05/08/97 | | +-----------------------------+ | |PERSON ORGANIZATION| | |WAYNE KROPP RDO | | | | +------------------------------------------------+ | |NRC NOTIFIED BY: RICHARD RANDOLPH | | |HQ OPS OFFICER: JOHN MacKINNON | | +------------------------------------------------+ | |EMERGENCY CLASS: NOT APPLICABLE | | |10 CFR SECTION: | | |LADM 35.33(a) MED MISADMINISTRATION | | | | | | | | | | | | | | +------------------------------------------------+-----------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | PATIENT ACCIDENTALLY GIVEN Tc-99 HDP INSTEAD OF Tc-99m CARDOLITE. | | | | A PATIENT WAS ACCIDENTALLY GIVEN 24.8 mCi OF Tc-99 HDP INSTEAD OF 25 mCi OF | | Tc-99m CARDOLITE. THE SYRINGE USED WAS SUPPOSED TO CONTAIN Tc-99m | | CARDOLITE, BUT INSTEAD IT CONTAINED Tc-99 HDP (BONE SEEKING). THE MISTAKE | | WAS RECOGNIZED WHEN THE PATIENT WAS BEING PREPARED FOR IMAGING. PHYSICIAN | | SAW BONE IMAGES INSTEAD OF SEEING A CARDO IMAGE. THIS ERROR DOES NOT POSE | | ANY ADVERSE HEALTH OR PHYSICAL RISK TO THE PATIENT. THE PATIENT WAS | | NOTIFIED OF THE ERROR BY THE REFERRING PHYSICIAN AND THE TECHNOLOGIST. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 32298 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: SOUTH TEXAS REGION: 4 |NOTIFICATION DATE: 05/08/97 | |UNIT: [1] [2] [ ] STATE: TX |NOTIFICATION TIME: 14:37 [ET]| |RX TYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 05/07/97 | +------------------------------------------------+EVENT TIME: 17:40[CDT]| |NRC NOTIFIED BY: HEAD |LAST UPDATE DATE: 05/08/97 | |HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |PHIL HARRELL RDO | |NLTR LICENSEE 24 HR REPORT | | |NLCO TECH SPEC LCO A/S | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | 2 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | THE LICENSEE DISCOVERED THAT THE CURRENT SURVEILLANCE METHODOLOGY FOR | | MONITORING REACTOR COOLANT SYSTEM (RCS) DEPARTURE FROM NUCLEATE BOILING | | (DNB) PARAMETERS DID NOT SATISFY TECHNICAL SPECIFICATION (TS) 4.2.5.1 AND | | ITS BASIS. | | | | THE LIMITS USED IN THE OPERATOR LOGS PROCEDURE FOR TS 3.2.5 DNB PARAMETER'S | | RCS AVERAGE TEMPERATURE (Tavg) AND PRESSURIZER PRESSURE ARE NOT CORRECTLY | | USED IN TS SURVEILLANCE 4.2.5.1. TS 3.2.5 LIMITS FOR Tavg (598øF) AND | | PRESSURIZER PRESSURE (2,189 PSIG) ARE ANALYTICAL LIMITS. THESE LIMITS | | CANNOT BE DIRECTLY COMPARED TO INDICATED VALUES BECAUSE THEY ARE NOT | | ADJUSTED FOR INSTRUMENT INDICATION/MEASUREMENT UNCERTAINTY. THE TS BASES | | STATES, "THE READINGS FROM FOUR CHANNELS WILL BE AVERAGED AND THEN ADJUSTED | | TO ACCOUNT FOR MEASUREMENT UNCERTAINTIES BEFORE COMPARING WITH THE REQUIRED | | LIMIT." THE CURRENT SURVEILLANCE FOR THESE PARAMETERS DOES NOT COMPLY WITH | | THIS REQUIREMENT. | | | | AS A RESULT OF THIS FINDING, THE ACTION STATEMENT WAS ENTERED FOR TS 3.2.5 | | REQUIRING THE LICENSEE TO IMPLEMENT CORRECTIVE ACTION WITHIN 2 HOURS OR TO | | REDUCE THERMAL POWER TO <5% WITHIN THE NEXT 4 HOURS. INTERIM PARAMETERS | | FOR PRESSURIZER PRESSURE AND Tavg WERE DEVELOPED TO ADDRESS THE DNB LIMITS. | | THE SURVEILLANCE WAS REPERFORMED USING THESE REVISED PARAMETERS, AND THE | | RESULTS WERE FOUND TO BE ACCEPTABLE. THE TS LIMITING CONDITION FOR | | OPERATION WAS EXITED WITHIN THE 2-HOUR TIME CLOCK. | | | | THE NRC RESIDENT INSPECTOR WAS INFORMED BY THE LICENSEE. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 32299 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: COOK REGION: 3 |NOTIFICATION DATE: 05/08/97 | |UNIT: [ ] [2] [ ] STATE: MI |NOTIFICATION TIME: 15:54 [ET]| |RX TYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 05/08/97 | +------------------------------------------------+EVENT TIME: 15:09[EDT]| |NRC NOTIFIED BY: DEPUYDT |LAST UPDATE DATE: 05/08/97 | |HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |WAYNE KROPP RDO | |ASHU 50.72(b)(1)(i)(A) PLANT S/D REQD BY TS | | |NLCO TECH SPEC LCO A/S | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | | | 2 | N Y 100 POWER OPERATION | 93 POWER OPERATION | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | THE PLANT IS SHUTTING DOWN DUE TO TECHNICAL SPECIFICATION (TS) 3.8.1.1 | | LIMITING CONDITION FOR OPERATION (LCO) ACTION STATEMENT WHICH ALLOWS ONE | | EMERGENCY DIESEL GENERATOR (EDG) TO BE OUT OF SERVICE FOR NO LONGER THAN 72 | | HOURS. | | | | A UNIT SHUTDOWN WAS COMMENCED AT APPROXIMATELY HOUR 60 OF A 72-HOUR LCO IN | | ACCORDANCE WITH TS 3.8.1.1 DUE TO THE "AB" EDG BEING REMOVED FROM SERVICE | | FOR ROUTINE MAINTENANCE ON 05/06/97. AS PART OF THIS MAINTENANCE, THE | | VOLTAGE REGULATOR CIRCUIT BOARDS WERE TO BE CHECKED AND CLEANED. UPON THE | | COMPLETION OF THIS WORK AND POST-MAINTENANCE TESTING, THE MANUAL PORTION OF | | THE VOLTAGE REGULATOR FAILED. EFFORTS TO REPLACE THE FAILED COMPONENT HAVE | | NOT BEEN SUCCESSFUL, AND THE DECISION TO SHUT DOWN WAS MADE. THE SHUTDOWN | | IS EXPECTED TO BE COMPLETED EARLY ON 05/09/97, BUT IT MAY BE TERMINATED IF | | THE ROOT CAUSE FOR THE VOLTAGE REGULATOR FAILURE IS CONFIRMED AND IF THE | | EDG IS RETURNED TO SERVICE. | | | | THE NRC RESIDENT INSPECTOR WAS NOTIFIED BY THE LICENSEE. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 32300 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: RIVER BEND REGION: 4 |NOTIFICATION DATE: 05/08/97 | |UNIT: [1] [ ] [ ] STATE: LA |NOTIFICATION TIME: 16:51 [ET]| |RX TYPE: [1] GE-6 |EVENT DATE: 05/08/97 | +------------------------------------------------+EVENT TIME: 15:08[CDT]| |NRC NOTIFIED BY: ROAN |LAST UPDATE DATE: 05/08/97 | |HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |PHIL HARRELL RDO | |APRE 50.72(b)(2)(vi) OFFSITE NOTIFICATION | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N N 0 COLD SHUTDOWN | 0 COLD SHUTDOWN | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | THE LICENSEE NOTIFIED THE LOUISIANA DEPARTMENT OF ENVIRONMENTAL QUALITY OF | | AN UNANTICIPATED OVERFLOW OF CIRCULATING WATER TO THE MISSISSIPPI RIVER. | | | | THE PLANT'S COOLING TOWER OVERFLOWED DUE TO OUTLET SCREEN BLOCKAGE. THE | | OVERFLOW OF APPROXIMATELY 8,000 GALLONS, WHICH WILL EVENTUALLY DRAIN INTO | | THE MISSISSIPPI RIVER, IS CONSIDERED TO BE AN UNANTICIPATED BYPASS WHICH IS | | REPORTABLE TO THE STATE. | | | | THE NRC RESIDENT INSPECTOR WAS NOTIFIED BY THE LICENSEE. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 32301 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: HARRIS REGION: 2 |NOTIFICATION DATE: 05/08/97 | |UNIT: [1] [ ] [ ] STATE: NC |NOTIFICATION TIME: 21:05 [ET]| |RX TYPE: [1] W-3-LP |EVENT DATE: 05/08/97 | +------------------------------------------------+EVENT TIME: 17:55[EDT]| |NRC NOTIFIED BY: PALMER |LAST UPDATE DATE: 05/08/97 | |HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |CHRIS CHRISTENSEN RDO | |NINF INFORMATION ONLY | | | |STACEY DOT | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N N 0 REFUELING | 0 REFUELING | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | THE CONTROL ROOM WAS NOTIFIED OF A BATTERY ACID LEAK INTO THE BACK OF A | | TRUCK ON INTERSTATE-95. | | | | BATTERIES BEING SHIPPED FROM HARRIS STARTED LEAKING IN THE BACK OF THE | | TRUCK WHILE IT WAS TRAVELLING ON I-95. NO ACID SPILLED FROM THE TRUCK, NO | | RADIOACTIVE MATERIALS WERE INVOLVED, AND NO INJURIES RESULTED FROM THIS | | INCIDENT. SITE PERSONNEL ARE RESPONDING TO SUPPORT CLEANUP, AND JOHNSTON | | COUNTY, NC, OFFICIALS ARE AWARE OF THE SITUATION. | | | | THE NRC RESIDENT INSPECTOR WAS NOTIFIED BY THE LICENSEE. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 32302 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: POINT BEACH REGION: 3 |NOTIFICATION DATE: 05/08/97 | |UNIT: [1] [2] [ ] STATE: WI |NOTIFICATION TIME: 21:44 [ET]| |RX TYPE: [1] W-2-LP,[2] W-2-LP |EVENT DATE: 05/08/97 | +------------------------------------------------+EVENT TIME: 19:15[CDT]| |NRC NOTIFIED BY: PARLATO |LAST UPDATE DATE: 05/08/97 | |HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |WAYNE KROPP RDO | |AIND 50.72(b)(2)(iii)(D) ACCIDENT MITIGATION | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N N 0 COLD SHUTDOWN | 0 COLD SHUTDOWN | | 2 | N N 0 REFUELING | 0 REFUELING | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | THE LICENSEE HAS DETERMINED THAT 8-HOUR BATTERY POWERED LIGHTING IS NOT | | AVAILABLE TO ILLUMINATE CERTAIN AREAS. | | | | THIS WAS DETERMINED AFTER A PRELIMINARY REVIEW OF INFORMATION NOTICE 95-036 | | (POTENTIAL PROBLEMS WITH POST FIRE EMERGENCY LIGHTING) INDICATED THAT | | 8-HOUR BATTERY POWERED EMERGENCY LIGHTING IS NOT AVAILABLE TO ILLUMINATE | | THE GAS TURBINE BUILDING, SERVICE WATER PUMP HOUSE, 13.8-KV SWITCHGEAR | | BUILDING, AND ACCESS/EGRESS ROUTES TO THESE LOCATIONS. EMERGENCY LIGHTING | | IS ALSO NOT AVAILABLE TO ILLUMINATE ACCESS AND EGRESS ROUTES TO AND FROM | | THE EMERGENCY DIESEL GENERATOR BUILDING. IN THE EVENT OF A FIRE IN THE | | CONTROL ROOM, CABLE ROOM, OR 4-KV VITAL SWITCHGEAR ROOM; AN OPERATOR MAY BE | | REQUIRED TO PERFORM ACTIONS IN THESE LOCATIONS. COMPENSATORY MEASURES WILL | | INCLUDE THE USE OF PORTABLE LANTERNS IN THESE AREAS. THIS PLACES BOTH | | UNITS IN AN UNANALYZED CONDITION OUTSIDE OF THE DESIGN BASIS OF AN APPENDIX | | R SCENARIO. APPENDIX R REQUIREMENTS DO NOT APPLY UNDER CURRENT PLANT | | CONDITIONS. | | | | THE NRC RESIDENT INSPECTOR WAS NOTIFIED BY THE LICENSEE. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 32303 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: HARRIS REGION: 2 |NOTIFICATION DATE: 05/08/97 | |UNIT: [1] [ ] [ ] STATE: NC |NOTIFICATION TIME: 22:28 [ET]| |RX TYPE: [1] W-3-LP |EVENT DATE: 05/08/97 | +------------------------------------------------+EVENT TIME: 19:30[EDT]| |NRC NOTIFIED BY: PALMER |LAST UPDATE DATE: 05/08/97 | |HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |CHRIS CHRISTENSEN RDO | |APRE 50.72(b)(2)(vi) OFFSITE NOTIFICATION |JACK ROE, NRR EO | | |FRANK CONGEL, IRD AEOD | | |JOHN DAVIDSON, NMSS IAT | | |LOREN BUSH, NRR IAT | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N N 0 REFUELING | 0 REFUELING | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | THE PLANT NOTIFIED THE WAKE COUNTY SHERIFF OF A BOMB THREAT WHICH WAS NOT | | CONSIDERED TO BE CREDIBLE. INVESTIGATIVE ASSISTANCE WAS REQUESTED FROM THE | | SHERIFF. COMPENSATORY MEASURES WERE TAKEN. (REFER TO THE HOO LOG FOR | | FURTHER DETAILS.) | | | | THE NRC RESIDENT INSPECTOR WAS INFORMED BY THE LICENSEE, AND THE LICENSEE | | PLANS TO INFORM THE FBI. | +------------------------------------------------------------------------------+