U.S. Nuclear Regulatory Commission Operations Center Event Reports For 11/29/96 - 12/02/96 ** EVENT NUMBERS ** 31391 +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 31391 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: SALEM REGION: 1 |NOTIFICATION DATE: 12/01/96 | |UNIT: [ ] [2] [ ] STATE: NJ |NOTIFICATION TIME: 13:07 [ET]| |RX TYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 12/01/96 | +------------------------------------------------+EVENT TIME: 11:49[EST]| |NRC NOTIFIED BY: JOHN ROBERTSON |LAST UPDATE DATE: 12/01/96 | |HQ OPS OFFICER: JOHN MacKINNON +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |JIM JOYNER RDO | |AESF 50.72(b)(2)(ii) ESF ACTUATION | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | | | 2 | N N 0 REFUELING | 0 REFUELING | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | DURING SURVEILLANCE TESTING, THE "2C" EMERGENCY DIESEL GENERATOR | | AUTOMATICALLY STARTED AND ENERGIZED THE "2C" 4-KV BUS WHEN THE PRIMARY | | SUPPLY BREAKER FAILED TO CLOSE TO THE BUS. THE REACTOR VESSEL IS DEFUELED. | | | | DURING SURVEILLANCE TESTING OF THE "2C" 4-KV VITAL BUS, STATION POWER | | SUPPLY BREAKER 23CSD FAILED TO CLOSE AS EXPECTED. THIS CAUSED THE "2C" | | 4-KV BUS TO DE-ENERGIZE AND CAUSED THE SUBSEQUENT AUTOMATIC START OF THE | | "2C" EMERGENCY DIESEL GENERATOR. THE "2C" 4-KV BUS WAS ENERGIZED BY THE | | EMERGENCY DIESEL GENERATOR FROM 1149 EST UNTIL 1255 EST. THE ALTERNATE | | POWER SUPPLY BREAKER FOR THE "2C" 4-KV VITAL BUS WAS CLOSED, OFFSITE POWER | | WAS RESTORED TO THE BUS, AND EMERGENCY DIESEL GENERATOR "2C" WAS SECURED. | | | | POWER TO THE SPENT FUEL POOL COOLING PUMPS WAS NEVER INTERRUPTED BECAUSE | | THE POWER TO THE PUMPS WAS BEING SUPPLIED FROM THE "2B" 4-KV VITAL BUS. THE | | LICENSEE STATED THAT TWO SOURCES OF OFFSITE POWER WERE ALWAYS AVAILABLE. | | THE LICENSEE IS INVESTIGATING WHY THE 23CSD BREAKER DID NOT CLOSE. | | | | THE LICENSEE NOTIFIED THE LOWER ALLOWAYS CREEK TOWNSHIP OF THIS EVENT. THE | | NRC RESIDENT INSPECTOR WAS ALSO NOTIFIED OF THIS EVENT BY THE LICENSEE. | +------------------------------------------------------------------------------+