U.S. Nuclear Regulatory Commission Operations Center Event Reports For 06/20/96 - 06/21/96 ** EVENT NUMBERS ** 30608 30621 30640 30653 30654 30655 30656 30657 30658 30659 !!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!!!! +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 30608 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: COOPER REGION: 4 |NOTIFICATION DATE: 06/10/96 | |UNIT: [1] [ ] [ ] STATE: NE |NOTIFICATION TIME: 08:55 [ET]| |RX TYPE: [1] GE-4 |EVENT DATE: 06/10/96 | +------------------------------------------------+EVENT TIME: 04:20[CDT]| |NRC NOTIFIED BY: T RATZLAFF |LAST UPDATE DATE: 06/20/96 | |HQ OPS OFFICER: JOHN MacKINNON +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |DALE POWERS RDO | |AIND 50.72(b)(2)(iii)(D) ACCIDENT MITIGATION | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N Y 20 POWER OPERATION | 20 POWER OPERATION | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | HIGH PRESSURE COOLANT INJECTION (HPCI) SYSTEM DECLARED INOPERABLE | | | | WHILE PERFORMING PROCEDURE 6.HPCI.103, HPCI INSERVICE TESTING AND QUARTERLY | | TEST MODE SURVEILLANCE, AN ACCEPTANCE CRITERION WAS NOT MET. THE HPCI | | AUXILIARY COOLING WATER SUPPLY PRESSURE CONTROL VALVE, HPCI-AOV-PCV50, | | FAILED TO OPEN WHEN THE HPCI PUMP WAS SHUTDOWN. THIS VALVE SUPPLIES COOLING | | WATER TO THE HPCI PUMP LUBE OIL COOLER. HPCI WAS SUBSEQUENTLY DECLARED | | INOPERABLE PER TECHNICAL SPECIFICATION 3.5.c (7 DAYS TO RETURN IT TO | | SERVICE). WITH THE HPCI SYSTEM DECLARED INOPERABLE, THE REACTOR CORE | | ISOLATION COOLING (RCIC) SYSTEM WAS TESTED SATISFACTORILY. THIS TESTING | | INCLUDED A POST MAINTENANCE TEST OF THE RCIC PUMP. | | | | THE NRC RESIDENT INSPECTOR WAS INFORMED OF THIS EVENT BY THE LICENSEE. | | | | * * * UPDATE 1806 EDT 6/20/96 FROM RATZLAFF TO S.SANDIN * * * | | | | THE LICENSEE IS RETRACTING THIS EVENT. | | | | "UPON FURTHER REVIEW OF THIS CONDITION, CNS BELIEVES THAT HPCI-AOV-PCV50, | | IN FACT, PERFORMED AS REQUIRED. THE TEST, AS WRITTEN, PROVIDES A NARROW | | WINDOW OF OPPORTUNITY FOR OBSERVATION OF THE FULL OPEN POSITION BEFORE THE | | VALVE PARTIALLY CLOSES TO PERFORM ITS NORMAL THROTTLING FUNCTION. THIS HAS | | LED TO PREVIOUS DIFFICULTIES IN PERFORMING THE TEST. BASED ON | | TROUBLESHOOTING THAT WAS SUBSEQUENTLY PERFORMED, AND OTHER SUCCESSFUL | | TESTING THAT WAS CONDUCTED BOTH BEFORE AND AFTER THE ABOVE IN-SERVICE TEST, | | IT HAS BEEN CONCLUDED THAT THE VALVE STROKED AS REQUIRED, BUT THAT IT IS | | LIKELY THAT THE ACTUATION WAS NOT PROPERLY OBSERVED. THEREFORE, ON THE | | BASIS THAT HPCI WAS NOT RENDERED INOPERABLE BY THIS CONDITION, THE ENS | | NOTIFICATION OF 6/10/96 IS RETRACTED." | | | | THE LICENSEE WILL INFORM THE NRC RESIDENT INSPECTOR. NOTIFIED | | R4DO(STETKA). | +------------------------------------------------------------------------------+ !!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!!!! +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 30621 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: FITZPATRICK REGION: 1 |NOTIFICATION DATE: 06/12/96 | |UNIT: [1] [ ] [ ] STATE: NY |NOTIFICATION TIME: 13:40 [ET]| |RX TYPE: [1] GE-4 |EVENT DATE: 06/12/96 | +------------------------------------------------+EVENT TIME: 11:30[EDT]| |NRC NOTIFIED BY: VICTOR WALZ |LAST UPDATE DATE: 06/20/96 | |HQ OPS OFFICER: DICK JOLLIFFE +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |KENNETH JENISON RDO | |AIND 50.72(b)(2)(iii)(D) ACCIDENT MITIGATION | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | - HPCI SYSTEM FAILED ITS QUARTERLY ASME SECTION XI INSERVICE TEST - | | | | DURING SCHEDULED QUARTERLY ASME SECTION XI INSERVICE TESTING OF THE | | HIGH PRESSURE COOLANT INJECTION (HPCI) SYSTEM, THE HPCI BOOSTER PUMP | | DIFFERENTIAL PRESSURE MEASURED 236.3 PSID. THIS VALUE EXCEEDS THE REQUIRED | | ACTION RANGE UPPER LIMIT VALUE OF 235.6 PSID. | | | | FAILURE TO MEET THIS TEST ACCEPTANCE CRITERIA RESULTED IN THE HPCI SYSTEM | | BEING DECLARED INOPERABLE PER TECHNICAL SPECIFICATION 3.5.C.1 (7 DAY LCO). | | THE HPCI SYSTEM REMAINS IN ITS NORMAL STANDBY LINEUP AND IS AVAILABLE FOR | | MANUAL OR AUTOMATIC INJECTION, IF NEEDED. | | | | PLANT ENGINEERING PERSONNEL ARE REVIEWING THE TEST DATA AND TEST | | INSTRUMENTATION. PREVIOUS TESTING HAS MET ALL TEST ACCEPTANCE CRITERIA | | WITH NO PERFORMANCE DETERIORATION DETECTED. | | | | THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR. | | | | * * * UPDATE 1700 EDT ON 6/20/96 FROM ZAREMBA TO S.SANDIN * * * | | | | "THE LICENSEE IS RETRACTING THIS EVENT. EVALUATION OF HPCI PUMP TEST DATA | | FOR THE 6/12/96 TEST AND EARLIER TESTS REVEALS THAT THE REFERENCE VALUE FOR | | THE HPCI BOOSTER PUMP DIFFERENTIAL PRESSURE WAS BASED ON TESTS IN WHICH THE | | PUMP SPEED WAS IN THE LOWER (SLOWER) PORTION OF THE SPECIFIED SPEED RANGE | | OF 3450-3550 RPM FOR THIS VARIABLE SPEED PUMP. THE TEST ON 6/12/96 WAS | | CONDUCTED AT 3515 RPM. SINCE PUMP DIFFERENTIAL PRESSURE IS PROPORTIONAL TO | | PUMP SPEED, THE DIFFERENTIAL PRESSURE DATA EXCEEDED THE UPPER LIMIT OF THE | | ACCEPTABLE RANGE BY 0.7 PSI. | | | | NEW REFERENCE VALUES WERE ESTABLISHED FOR A PUMP SPEED OF 3500 RPM AND THE | | ACCEPTABLE PUMP SPEED RANGE FOR TEST HAS BEEN REDUCED FROM A 100 RPM BAND | | TO A 50 RPM BAND. | | | | HPCI WAS DECLARED OPERABLE AT 1407 HOURS EDT ON 6/13/96." | | | | THE LICENSEE WILL INFORM THE NRC RESIDENT INSPECTOR. NOTIFIED R1DO | | (HARRISON). | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 30640 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: VERMONT YANKEE REGION: 1 |NOTIFICATION DATE: 06/18/96 | |UNIT: [1] [ ] [ ] STATE: VT |NOTIFICATION TIME: 15:15 [ET]| |RX TYPE: [1] GE-4 |EVENT DATE: 06/18/96 | +------------------------------------------------+EVENT TIME: 15:10[EDT]| |NRC NOTIFIED BY: RICK HENRIQUEZ |LAST UPDATE DATE: 06/20/96 | |HQ OPS OFFICER: DICK JOLLIFFE +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |CURTIS COWGILL RDO | |AARC 50.72(b)(1)(v) OTHER ASMT/COMM INOP | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | - PHONES FROM EOF TO VT, NH, & MA INOPERABLE - | | | | THE TELEPHONES FROM THE EMERGENCY OPERATIONS FACILITY LOCATED IN THE | | CORPORATE OFFICE IN BRATTLEBORO, VT, TO THE STATES OF VT, NH, AND MA ARE | | INOPERABLE. THE LICENSEE HAS REPORTED THIS PROBLEM TO THE LOCAL TELEPHONE | | COMPANY. | | | | THE LICENSEE WILL INFORM THE NRC RESIDENT INSPECTOR. | | | | * * * UPDATE AT 0749 EDT ON 6/20/96 FROM KRITZER TAKEN BY KARSCH * * * | | NUC NET PHONES RESTORED TO OPERABILITY AT 1635 EDT ON 6/19/96. THE | | LICENSEE WILL INFORM THE NRC RESIDENT INSPECTOR. R1DO (COWGILL) NOTIFIED. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 30653 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: COOK REGION: 3 |NOTIFICATION DATE: 06/20/96 | |UNIT: [1] [2] [ ] STATE: MI |NOTIFICATION TIME: 09:43 [ET]| |RX TYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 06/20/96 | +------------------------------------------------+EVENT TIME: 00:00[EDT]| |NRC NOTIFIED BY: STEVE BREWER |LAST UPDATE DATE: 06/20/96 | |HQ OPS OFFICER: RUDY KARSCH +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: | | |CCCC 21.21 UNSPECIFIED PARAGRAPH | | | | | | |VERN HODGE NRR | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | 2 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | CAM FOLLOWER SPRINGS FOR THE EMERGENCY DIESEL GENERATORS (EDGs) ARE | | DEFECTIVE AND COULD CAUSE THE EDGs TO FAIL. THESE EDGs ARE MANUFACTURED BY | | WORTHINGTON. REPLACEMENT SPRINGS OBTAINED FROM THE MANUFACTURER DO NOT | | APPEAR TO HAVE THE DEFECT. | | | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 30654 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: SOUTH TEXAS REGION: 4 |NOTIFICATION DATE: 06/20/96 | |UNIT: [1] [ ] [ ] STATE: TX |NOTIFICATION TIME: 11:52 [ET]| |RX TYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 06/19/96 | +------------------------------------------------+EVENT TIME: 15:15[CDT]| |NRC NOTIFIED BY: JAIRO PINZON |LAST UPDATE DATE: 06/20/96 | |HQ OPS OFFICER: HENRY BAILEY +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |TOM STETKA RDO | |NLTR LICENSEE 24 HR REPORT | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | SURVEILLANCE ON UNIT 1 CONTAINMENT, TO VISUALLY VERIFY NO LOOSE DEBRIS | | PRESENT DURING OPERATION, WAS INADEQUATE. | | | | "THE FOLLOWING FAX APPLIES TO UNIT 1. UNIT 1 IS CURRENTLY IN MODE 1 AT | | 100% POWER. | | | | ON JUNE 19, 1996, A REPORTABILITY REVIEW WAS COMPLETED WHICH DETERMINED | | THAT THE REQUIREMENTS OF TECHNICAL SPECIFICATION 4.5.2.C WERE NOT MET DUE | | TO PERFORMANCE OF AN INADEQUATE SURVEILLANCE ON MAY 15, 1996. | | | | TECHNICAL SPECIFICATION 4.5.2.C REQUIRES THE PERFORMANCE OF A VISUAL | | INSPECTION WHICH VERIFIES THAT NO LOOSE DEBRIS (RAGS, TRASH, CLOTHING, | | ETC.) IS PRESENT IN THE CONTAINMENT WHICH COULD BE TRANSPORTED TO THE | | CONTAINMENT SUMP AND CAUSE RESTRICTION OF THE PUMP SUCTIONS DURING LOCA | | CONDITIONS. | | | | ON MAY 16, 1996, WITH THE UNIT IN MODE 1 AT 100% POWER, MATERIAL STORED IN | | PLASTIC BAGS WAS FOUND IN THE REACTOR CONTAINMENT BUILDING WHICH HAD BEEN | | STAGED ON MAY 15, 1996, IN PREPARATION FOR A REFUELING OUTAGE. UPON | | DISCOVERY, THE MATERIAL WAS IMMEDIATELY REMOVED. AN ENGINEERING REVIEW OF | | THIS INCIDENT DETERMINED THAT THE OPERABILITY OF THE EMERGENCY CORE COOLING | | SYSTEM WOULD NOT HAVE BEEN IMPACTED SINCE THE MATERIAL COULD NOT HAVE | | REACHED THE SUMPS. THE EVALUATION ALSO DETERMINED THAT HAD THE MATERIAL | | BEEN CAPABLE OF BEING TRANSPORTED TO THE CONTAINMENT SUMPS, THE OPERABILITY | | OF THE SYSTEM WOULD NOT HAVE BEEN IMPACTED. | | | | THIS CONDITION IS CONSIDERED TO BE A FAILURE TO PROPERLY PERFORM A | | TECHNICAL SPECIFICATION REQUIRED SURVEILLANCE AND AS SUCH, A FAILURE TO | | COMPLY WITH TECHNICAL SPECIFICATION 4.5.2.C IN THAT THE PERSONNEL | | PERFORMING THE SURVEILLANCE DID NOT RECOGNIZE THAT THE MATERIAL IN QUESTION | | WAS NOT ALLOWED, BY PROCEDURE, TO REMAIN IN CONTAINMENT UNDER THE OPERATING | | CONDITIONS AT THAT TIME. THIS IS BEING REPORTED AS A VIOLATION OF PLANT | | OPERATING LICENSE NO. NP-76(2G) SECTION 2.c(2) (24 HOUR REPORT)." | | | | THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |TRANSPORTATION EVENT | |EVENT NUMBER: 30655 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |LICENSEE: METOREX CORPORATION |NOTIFICATION DATE: 06/20/96 | | CITY: LANGHORNE REGION: 1 |NOTIFICATION TIME: 13:15 [ET]| | COUNTY: BUCKS STATE: PA |EVENT DATE: 06/19/96 | |LICENSE#: 372846101 AGREEMENT: N |EVENT TIME: 00:00[EDT]| | DOCKET: |LAST UPDATE DATE: 06/20/96 | | +-----------------------------+ | |PERSON ORGANIZATION| | |CURTIS COWGILL RDO | | |JOHN HICKEY EO | +------------------------------------------------+FRANK CONGEL IRD | |NRC NOTIFIED BY: JOSEPH LOFTUS |BLANCHARD DOT | |HQ OPS OFFICER: STEVE SANDIN |BECK DOE | +------------------------------------------------+ | |EMERGENCY CLASS: NOT APPLICABLE | | |10 CFR SECTION: | | |NTRA TRANSPORTATION EVENT | | | | | | | | | | | | | | +------------------------------------------------+-----------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | INSTRUMENT CONTAINING TWO SEALED SOURCES STOLEN DURING SHIPMENT. | | | | ON JUNE 1 AN AIRBORNE EXPRESS WAREHOUSE LOCATED IN BRISTOL, PA (ABOUT 15 | | MINUTES NE OF PHILADELPHIA) WAS BROKEN INTO AND A DOPS PROBE XMET 880 | | ANALYZER SHIPPED FROM EXXON COMPANY USA, BATON ROUGE, LA, TO METOREX | | CORPORATION, 860 TOWN CENTER DRIVE, LANGHORNE, PA 19047 WAS STOLEN. THIS | | INSTRUMENT CONTAINS TWO SEALED SOURCES, i.e., CADMIUM-109 5 mCi - S/N Y919 | | AND IRON-55 40 mCi - S/N 176, USED TO MEASURE ELEMENTS IN SOILS. THE | | INSTRUMENT IS CLEARLY MARKED FOR EACH RADIOACTIVE SOURCE AND HAS A TRIGGER | | LOCK INSTALLED THAT PREVENTS OPENING THE SHUTTER AND EXPOSING THE SOURCES. | | EXXON COMPANY USA NOTIFIED REGION 2 AND THE LICENSEE NOTIFIED REGION 1 | | (STEVEN COURTEMANCHE) JUNE 20, 1996, AFTER BEING NOTIFIED BY AIRBORNE | | EXPRESS ON JUNE 19, 1996. THE LICENSEE WILL CONTACT AIRBORNE EXPRESS TO | | VERIFY THAT POLICE ARE AWARE OF THE CONTENTS OF THE STOLEN SHIPMENT. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 30656 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: POINT BEACH REGION: 3 |NOTIFICATION DATE: 06/20/96 | |UNIT: [ ] [2] [ ] STATE: WI |NOTIFICATION TIME: 16:34 [ET]| |RX TYPE: [1] W-2-LP,[2] W-2-LP |EVENT DATE: 06/20/96 | +------------------------------------------------+EVENT TIME: 13:40[CDT]| |NRC NOTIFIED BY: KEN SOKOL |LAST UPDATE DATE: 06/20/96 | |HQ OPS OFFICER: STEVE SANDIN +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |PATRICK HILAND RDO | |APRE 50.72(b)(2)(vi) OFFSITE NOTIFICATION | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | | | 2 | N Y 90 POWER OPERATION | 90 POWER OPERATION | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | LICENSEE NOTIFIED OFFSITE GOVERNMENT AGENCIES OF 2 GAL HYDRAZINE SPILL | | ONSITE WITH DISCHARGE TO LAKE MICHIGAN. | | | | "A 2 GALLON SPILL OF 35% HYDRAZINE SOLUTION OCCURRED AT 2030 ON 6/19/96 | | INSIDE THE PLANT AND DRAINED VIA FLOOR DRAIN TO THE TURBINE HALL SUMP. IT | | WAS SUBSEQUENTLY PUMPED TO THE RETENTION POND AND THEN OUT THROUGH THE | | RETENTION POND DISCHARGE TO LAKE MICHIGAN. RETENTION POND DISCHARGE TO THE | | LAKE WAS SAMPLED AND INDICATED 1.2 PPM HYDRAZINE ON 6/20. ANOTHER SAMPLE | | WILL BE COLLECTED ON 6/21 BEFORE 2100. WISCONSIN ELECTRIC ENVIRONMENTAL | | NOTIFIED: | | | | 1. NATIONAL RESPONSE CENTER @ 1340 6/20 | | 2. WDNR LAKE MICHIGAN DISTRICT OFFICE @ 1350 6/20 | | 3. MANITOWOC COUNTY OFFICE EMERGENCY PLANNING @ 1410 6/20." | | | | THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 30657 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: FARLEY REGION: 2 |NOTIFICATION DATE: 06/20/96 | |UNIT: [1] [2] [ ] STATE: AL |NOTIFICATION TIME: 19:47 [ET]| |RX TYPE: [1] W-3-LP,[2] W-3-LP |EVENT DATE: 06/20/96 | +------------------------------------------------+EVENT TIME: 17:57[CDT]| |NRC NOTIFIED BY: CHERI COLLINS |LAST UPDATE DATE: 06/20/96 | |HQ OPS OFFICER: STEVE SANDIN +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |CHARLES HOSEY RDO | |ASHU 50.72(b)(1)(i)(A) PLANT S/D REQD BY TS |ROBERT CAPRA EO | | |CONGEL IRD | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | 2 | N Y 100 POWER OPERATION | 99 POWER OPERATION | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | LICENSEE COMMENCED A TS REQUIRED SHUTDOWN OF BOTH UNITS AFTER DETERMINING | | THAT SURVEILLANCE TESTING OF MANUAL SI ACTUATION WAS INADEQUATE. | | | | A REVIEW OF SURVEILLANCE TEST PROCEDURES CONCLUDED THAT A REACTOR TRIP ON | | MANUAL SI ACTUATION FROM THE CONTROL BOARD HAND SWITCHES HAD NEVER BEEN | | VERIFIED FOR EITHER UNIT. THIS PLACED BOTH UNITS IN TS 3.0.3 WHICH | | REQUIRES THAT WITHIN 1 HOUR FROM 1757 CDT ACTIONS BE TAKEN TO PLACE BOTH | | UNITS INTO MODE 3 OR BE IN HOT STANDBY WITHIN THE FOLLOWING 6 HOURS. UNIT | | 2 IS CURRENTLY RAMPING DOWN AT 1 MW/MIN. UNIT 1 PLANS TO BEGIN RAMPING | | DOWN AT .5 MW/MIN SHORTLY. THE LICENSEE INFORMED THE NRC RESIDENT | | INSPECTOR. | | | | HOONOTE: A CONFERENCE CALL IS SCHEDULED AT 2100 EDT WITH THE LICENSEE TO | | CONSIDER A REQUEST FOR ENFORCEMENT DISCRETION. | | | | * * * UPDATE 2210 EDT 6/20/96 FROM COLLINS TO S.SANDIN * * * | | | | CONTROL ROOM NOTIFIED AT 2054 CDT THAT ENFORCEMENT DISCRETION WAS GRANTED. | | UNITs 1 AND 2 ARE CURRENTLY AT 94% AND 72% POWER, RESPECTIVELY. THE | | LICENSEE WILL RAMP BOTH UNITS TO 100% POWER. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 30658 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: MAINE YANKEE REGION: 1 |NOTIFICATION DATE: 06/21/96 | |UNIT: [1] [ ] [ ] STATE: ME |NOTIFICATION TIME: 01:42 [ET]| |RX TYPE: [1] CE |EVENT DATE: 06/21/96 | +------------------------------------------------+EVENT TIME: 00:50[EDT]| |NRC NOTIFIED BY: ROBERT MALONEY |LAST UPDATE DATE: 06/21/96 | |HQ OPS OFFICER: DOUG WEAVER +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |LEANNE HARRISON RDO | |DSAF 73.71(b)(1) SECURITY DEGRADATION | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N Y 90 POWER OPERATION | 90 POWER OPERATION | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | SAFEGUARDS SYSTEM DEGRADATION RELATED TO AN AREA BOUNDARY | | | | IMMEDIATE COMPENSATORY MEASURES TAKEN UPON DISCOVERY. THE LICENSEE WILL | | NOTIFY THE NRC RESIDENT INSPECTOR. ADDITIONAL DETAILS ARE CONTAINED IN THE | | HOO LOG. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |TRANSPORTATION EVENT | |EVENT NUMBER: 30659 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |LICENSEE: AMERIJET |NOTIFICATION DATE: 06/21/96 | | CITY: MIAMI REGION: 2 |NOTIFICATION TIME: 02:15 [ET]| | COUNTY: DADE STATE: FL |EVENT DATE: 06/21/96 | |LICENSE#: AGREEMENT: Y |EVENT TIME: 00:00[EDT]| | DOCKET: |LAST UPDATE DATE: 06/21/96 | | +-----------------------------+ | |PERSON ORGANIZATION| | |CHARLES HOSEY RDO | | |JOHN HICKEY EO | +------------------------------------------------+BLANCHARD DOT | |NRC NOTIFIED BY: KAY HEATH |TANNER DOE | |HQ OPS OFFICER: DOUG WEAVER |CONGEL AEOD | +------------------------------------------------+ | |EMERGENCY CLASS: NOT APPLICABLE | | |10 CFR SECTION: | | |NTRA TRANSPORTATION EVENT | | | | | | | | | | | | | | +------------------------------------------------+-----------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | TRANSPORTATION EVENT | | | | CALL BACK NUMBER: CONTAINED IN THE HOO LOG | | | | CALLER'S ORGANIZATION: STATE OF FLORIDA RADIATION CONTROL | | | | TRANSPORTATION MODE: AIR | | | | EXACT LOCATION OF EVENT: MIAMI INTERNATIONAL AIRPORT | | | | NAME OF CARRIER: AMERIJET | | | | -SHIPPING PAPERS AVAILABLE: YES | | | | -NAME OF SHIPPER: NORDION INTERNATIONAL INCORPORATED | | | | -ADDRESS OF SHIPPER: 447 MARCH ROAD, KANATA, ONTARIO, CANADA K2K1X8 | | | | MATERIAL INVOLVED: | | | | ONE SEVEN GALLON CONTAINER OF NaI WITH 3 Ci OF I-131 WAS DROPPED ON THE | | PAVEMENT AND SOME OF THE MATERIAL SPILLED OUT. THE TRANSPORTATION INDEX IS | | 2.7. THE DADE COUNTY HAZMAT TEAM RESPONDED AND HAS ROPED OFF THE AREA. | | THERE WERE NO PERSONNEL CONTAMINATIONS. THE MATERIAL YIELDED 50 mR/HR ON | | CONTACT WITH THE CONTAINER. THE STATE OF FLORIDA HAS SENT RESPONSE | | PERSONNEL TO THE SCENE. THERE HAS BEEN NO MEDIA COVERAGE OF THIS EVENT. | | DOT AND DOE HAVE BEEN NOTIFIED. | +------------------------------------------------------------------------------+