U.S. Nuclear Regulatory Commission Operations Center Event Reports For 09/18/96 - 09/19/96 ** EVENT NUMBERS ** 31019 31020 31021 31022 31023 31024 31025 31026 31027 +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 31019 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: FERMI REGION: 3 |NOTIFICATION DATE: 09/18/96 | |UNIT: [2] [ ] [ ] STATE: MI |NOTIFICATION TIME: 13:09 [ET]| |RX TYPE: [2] GE-4 |EVENT DATE: 09/18/96 | +------------------------------------------------+EVENT TIME: 12:18[EDT]| |NRC NOTIFIED BY: SKLARCZYK |LAST UPDATE DATE: 09/18/96 | |HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |WAYNE KROPP RDO | |DDDD 73.71 UNSPECIFIED PARAGRAPH | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 2 | N Y 89 POWER OPERATION | 89 POWER OPERATION | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | THE LICENSEE REPORTED THAT AN INDIVIDUAL ATTEMPTED TO INTRODUCE CONTRABAND | | INTO THE CONTROL ACCESS AREA. COMPENSATORY MEASURES TAKEN UPON DISCOVERY. | | THE RI WILL BE INFORMED. SEE HOO LOG FOR FURTHER DETAILS. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 31020 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: COOPER REGION: 4 |NOTIFICATION DATE: 09/18/96 | |UNIT: [1] [ ] [ ] STATE: NE |NOTIFICATION TIME: 13:15 [ET]| |RX TYPE: [1] GE-4 |EVENT DATE: 09/18/96 | +------------------------------------------------+EVENT TIME: 08:30[CDT]| |NRC NOTIFIED BY: CROW |LAST UPDATE DATE: 09/18/96 | |HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |WILLIAM JOHNSON RDO | |AINA 50.72(b)(2)(iii)(A) POT UNABLE TO SAFE SD | | |NLCO TECH SPEC LCO A/S | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | THE LICENSEE DECLARED THE REACTOR OVERFILL PROTECTION INSTRUMENTATION | | INOPERABLE, PLACING THE UNIT IN A 30 DAY LCO. | | | | ON 9/17/96, THE REACTOR VESSEL OVERFILL PROTECTION CHANNELS WERE DECLARED | | INOPERABLE WHEN THE LICENSEE DISCOVERED THAT THEY WERE NOT BEING PROPERLY | | SURVEILLED DUE TO INADEQUATE CALIBRATION AND FUNCTIONAL TESTING WHICH | | FAILED TO ENCOMPASS THE ENTIRE INSTRUMENT. UPON FURTHER REVIEW, THE | | LICENSEE DETERMINED ON 9/18/96 THAT THIS MAY CONSTITUTE A REPORTABLE | | CONDITION. | | | | THE THREE REACTOR VESSEL OVERFILL CHANNELS PROVIDE INPUT TO A 2-OUT-OF-3 | | LOGIC SYSTEM DESIGNED TO TRIP THE REACTOR FEED PUMPS AND THE MAIN TURBINE | | ON HIGH REACTOR WATER LEVEL. A MAIN TURBINE TRIP RESULTS IN A TURBINE STOP | | VALVE CLOSURE, WHICH INITIATES A REACTOR SCRAM. IN THE LICENSEE'S ACCIDENT | | ANALYSIS, THIS RPS TRIP IS CREDITED WITH TERMINATING THE REACTOR FEED PUMP | | CONTROLLER FAILURE TRANSIENT. ALTHOUGH THE MAIN TURBINE STOP VALVE CLOSURE | | RPS CHANNEL WAS OPERABLE AND ALTERNATE MEANS, INCLUDING MANUAL SCRAM, WOULD | | LIKELY HAVE RESULTED IN SAFE SHUTDOWN, THIS CONDITION IS CONSERVATIVELY | | BEING REPORTED PENDING FURTHER REVIEW. THE NRC RESIDENT INSPECTOR WAS | | INFORMED. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 31021 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: COMANCHE PEAK REGION: 4 |NOTIFICATION DATE: 09/18/96 | |UNIT: [ ] [2] [ ] STATE: TX |NOTIFICATION TIME: 14:31 [ET]| |RX TYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 09/18/96 | +------------------------------------------------+EVENT TIME: 12:45[CDT]| |NRC NOTIFIED BY: HALL |LAST UPDATE DATE: 09/18/96 | |HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |WILLIAM JOHNSON RDO | |ARPS 50.72(b)(2)(ii) RPS ACTUATION | | |AESF 50.72(b)(2)(ii) ESF ACTUATION | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | | | 2 | A/R Y 100 POWER OPERATION | 0 HOT STANDBY | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | REACTOR TRIP/TURBINE TRIP FROM 100% POWER DUE TO AN INVALID RCS | | OVERTEMPERATURE (OT) N-16 TRIP SIGNAL CAUSED BY A LIGHTNING STRIKE. | | | | A LIGHTNING STRIKE RESULTED IN TWO REACTOR TEMPERATURE INDICATIONS SPIKING | | HIGH. THESE SIGNALS INPUT TO THE OVER TEMPERATURE N-16 SETPOINT CALCULATION | | WHICH CAUSED THE RUNBACK AND TRIP SETPOINTS TO SPIKE LOW. TWO OUT OF FOUR | | OT N-16 TRIP SETPOINTS WERE REACHED, RESULTING IN A REACTOR TRIP/TURBINE | | TRIP. FOLLOWING THE TRIP, A LOW-LOW STEAM GENERATOR LEVEL CAUSED THE MOTOR | | DRIVEN AND TURBINE DRIVEN AUXILIARY FEEDWATER PUMPS TO START. ALL RODS | | FULLY INSERTED, NO INJECTION OCCURRED AND NO SAFETY RELIEF VALVES LIFTED. | | ALL EQUIPMENT RESPONDED NORMALLY. THEY HAVE NOT YET INVESTIGATED FOR | | LIGHTNING DAMAGE. THE RI WAS INFORMED. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 31022 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: SUSQUEHANNA REGION: 1 |NOTIFICATION DATE: 09/18/96 | |UNIT: [1] [ ] [ ] STATE: PA |NOTIFICATION TIME: 14:39 [ET]| |RX TYPE: [1] GE-4,[2] GE-4 |EVENT DATE: 09/18/96 | +------------------------------------------------+EVENT TIME: 00:00[EDT]| |NRC NOTIFIED BY: DAVID WALSH |LAST UPDATE DATE: 09/18/96 | |HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |RICHARD KEIMIG RDO | |ADAS 50.72(b)(2)(i) DEG/UNANALYZED COND | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N N 0 REFUELING | 0 REFUELING | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | HPCI STEAM SUPPLY PENETRATION LEAKAGE DOES NOT MEET THE SECONDARY | | CONTAINMENT CRITERIA | | | | WHILE PERFORMING A 10CFR50 APPENDIX J LOCAL LEAK RATE TEST ON THE HPCI | | STEAM SUPPLY PENETRATION, THE LEAKAGE RATE WAS DETERMINED TO BE 67.8 SCFH. | | THIS LEAKAGE RATE FOR THE PENETRATION PASSED ITS APPENDIX J ACCEPTANCE | | CRITERIA BUT FAILED ITS SECONDARY CONTAINMENT BYPASS LEAKAGE (SCBL) | | ACCEPTANCE CRITERIA. THIS PENETRATION HAS RECENTLY BEEN IDENTIFIED AS A | | SCBL PATHWAY. THE ADDITION OF THE LEAKAGE FROM THE HPCI STEAM LINE | | PENETRATION TO THE EXISTING TOTAL SCBL EXCEEDS THE CALCULATED LIMIT FOR | | OFFSITE DOSE CALCULATIONS. THE SAFETY ANALYSIS FOR THE OFFSITE DOSE | | CALCULATION LIMITS THE SCBL TO 9 SCFH. THE CURRENT TOTAL FOR THE SCBL IS | | 72.48 SCFH. | | | | THE ASSOCIATED CONTAINMENT ISOLATION VALVES WILL BE REPAIRED BEFORE THE | | PLANT RETURNS TO POWER OPERATION. | | | | THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 31023 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: INDIAN POINT REGION: 1 |NOTIFICATION DATE: 09/18/96 | |UNIT: [2] [ ] [ ] STATE: NY |NOTIFICATION TIME: 18:48 [ET]| |RX TYPE: [2] W-4-LP,[3] W-4-LP |EVENT DATE: 09/18/96 | +------------------------------------------------+EVENT TIME: 18:15[EDT]| |NRC NOTIFIED BY: SANTINI |LAST UPDATE DATE: 09/18/96 | |HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |RICHARD KEIMIG RDO | |ASHU 50.72(b)(1)(i)(A) PLANT S/D REQD BY TS | | |NLCO TECH SPEC LCO A/S | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 2 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | THE PLANT ENTERED AN LCO TO BE IN HOT SHUTDOWN IN 7 HRS DUE TO BOTH 21 AND | | 22 HYDROGEN RECOMBINERS BEING DECLARED INOPERABLE. | | | | THAT LICENSEE IS STARTING TO REDUCE POWER AT THE RATE OF 100MW/HR DUE TO | | IMPROPERLY SUPPORTED INSTRUMENT AIR TUBING TO VALVES "FCV2A" AND "FCV2B" | | WHICH ARE USED TO CONTROL THE HYDROGEN FLOW TO THE RECOMBINERS. THIS WAS | | DISCOVERED DURING A PLANT WALKDOWN INSPECTION. THE CORRECTIVE ACTION IS TO | | INSTALL THE PROPER SEISMIC SUPPORTS ON THE TUBING. THEY ESTIMATE THE | | INSTALLATION SHOULD BE COMPLETED WITHIN 2 HRS. THE RI WILL BE INFORMED. | | | | ***UPDATE AT 20:30 BY MANNSELL TO GOULD*** THE PLANT HAS EXITED THE TS | | REQUIRED SHUTDOWN AT 20:00 DUE TO THE 22 HYDROGEN RECOMBINER BEING MADE | | AVAILABLE SINCE THE INSTRUMENT AIR TUBING SUPPORTS HAVE BEEN REPLACED WITH | | SEISMICALLY QUALIFIED SUPPORTS. THEY ARE STILL WORKING ON THE TUBING | | SUPPORTS FOR THE VALVE THAT SUPPLIES THE 21 HYDROGEN RECOMBINER. THIS | | CONDITION PUTS THEM IN A 30 DAY LCO. REACTOR POWER WAS REDUCED TO 80%. THE | | RI WAS INFORMED. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |TRANSPORTATION EVENT | |EVENT NUMBER: 31024 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |LICENSEE: INTERCOMMUNITY CANCER CTR |NOTIFICATION DATE: 09/18/96 | | CITY: NEW ORLEANS REGION: 4 |NOTIFICATION TIME: 19:13 [ET]| | COUNTY: STATE: LA |EVENT DATE: 09/18/96 | |LICENSE#: AGREEMENT: Y |EVENT TIME: 15:37[CDT]| | DOCKET: |LAST UPDATE DATE: 09/18/96 | | +-----------------------------+ | |PERSON ORGANIZATION| | |WILLIAM JOHNSON RDO | | |JOHN GREEVES EO | +------------------------------------------------+BAGWELL FEMA | |NRC NOTIFIED BY: FINKBEINER(NAT RES CTR) | | |HQ OPS OFFICER: CHAUNCEY GOULD | | +------------------------------------------------+ | |EMERGENCY CLASS: NOT APPLICABLE | | |10 CFR SECTION: | | |NTRA TRANSPORTATION EVENT | | | | | | | | | | | | | | +------------------------------------------------+-----------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | | | TRANSPORTATION EVENT | | | | CALL BACK NUMBER: 504-924-1473 | | CALLER'S ORGANIZATION: FEDERAL EXPRESS | | TRANSPORTATION MODE : UNKNOWN | | EXACT LOCATION OF EVENT ( 3105 S FAITH HOME RD, TURLOC, STANISLAUS, CA) | | NAME OF CARRIER: FEDERAL EXPRESS | | -SHIPPING PAPERS AVAILABLE: UNKNOWN | | -NAME OF SHIPPER(FROM SHIPPING PAPERS): INTERCOMMUNITY CANCER CENTER | | -ADDRESS OF SHIPPER(FROM SHIPPING PAPERS): 800 NAPOLEON, NEW ORLEANS, LA | | -NAME OF CONSIGNEE(FROM SHIPPING PAPERS): ENVIRONMENTAL MANAGEMENT & | | CONTROLS | | -ADDRESS OF CONSIGNEE(FROM SHIPPING PAPERS): 3105 S. FAITH HOME RD, | | TURLOC, CA. | | -VEHICLE NUMBER: UNKNOWN | | -VEHICLE PLACARDED: UNKNOWN | | MATERIAL INVOLVED: RADIUM 226 | | -TYPE OF PACKAGES(CARDBOARD, METAL, DRUM, CASK, ETC): UNKNOWN | | -NUMBER OF PACKAGES: UNKNOWN | | -PACKAGE LABEL(E.G., RADIOACTIVE-WHITE I, YELLOW II or III, LSA): UNKNOWN | | -DOT PACKAGE SPECIFICATION MARKING(DOT-7A TYPE A, FIBER BOARD BOX): | | UNKNOWN | | -OTHER PACKAGE MARKINGS: UNKNOWN | | -MATERIAL ID NUMBER(FROM SHIPPING PAPERS)(E.G., UN XXXX): UNKNOWN | | -CONDITION OF PACKAGES(DAMAGED, LEAKING, ETC): INTACT | | -RADIATION SURVEY INFORMATION: 3.3 GIGABECQUERELS OF RADIUM 226 | | MEDIA COVERAGE(Y/N): UNKNOWN | | AGENCIES NOTIFIED: DOT, EPA, DOE, STATE(CA RAD CONTROL & LA RAD CONTROL) | | AGENCIES ON SCENE: UNKNOWN | | INJURIES: UNKNOWN | | | | CURRENT STATUS: THE RECIPIENT OF THE PACKAGE DISCOVERED EXCESSIVE AMOUNTS | | OF RADIATION COMING FROM THE PACKAGE. THE PACKAGE IS INTACT AND HAS BEEN | | SECURED | | | | | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 31025 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: DIABLO CANYON REGION: 4 |NOTIFICATION DATE: 09/18/96 | |UNIT: [1] [2] [ ] STATE: CA |NOTIFICATION TIME: 19:16 [ET]| |RX TYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 09/18/96 | +------------------------------------------------+EVENT TIME: 08:35[PDT]| |NRC NOTIFIED BY: RYAN |LAST UPDATE DATE: 09/18/96 | |HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |WILLIAM JOHNSON RDO | |HFIT 26.73 FITNESS FOR DUTY | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | 2 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | THE LICENSEE FOUND A SUSPICIOUS PAPER WRAPPER WITH A RESIDUE THAT TESTED | | POSITIVE FOR COCAINE. | | | | ON 9/4/96 A PAPER WRAPPER WITH RESIDUE WAS FOUND IN ION EXCHANGER CUBICAL | | 2-4 IN THE HIGH RADIATION AREA OF THE PLANT AUX BUILDING. THIS PAPER WAS | | SENT OUT TO HAVE THE RESIDUE ANALYZED AND THE RESULTS RECEIVED ON 9/18/96 | | WERE POSITIVE FOR COCAINE. THE AREA WHERE THE PAPER WRAPPER WAS FOUND IS | | ENTERED INFREQUENTLY. THE LAST RECORDED TIME WORK WAS PERFORMED IN THIS | | AREA WAS 9/92. PLANT SECURITY IS CONTINUING THEIR INVESTIGATION. THE RI WAS | | INFORMED. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 31026 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: OYSTER CREEK REGION: 1 |NOTIFICATION DATE: 09/19/96 | |UNIT: [1] [ ] [ ] STATE: NJ |NOTIFICATION TIME: 03:23 [ET]| |RX TYPE: [1] GE-2 |EVENT DATE: 09/19/96 | +------------------------------------------------+EVENT TIME: 01:25[EDT]| |NRC NOTIFIED BY: STEVE FULLER |LAST UPDATE DATE: 09/19/96 | |HQ OPS OFFICER: RUDY KARSCH +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |RICHARD KEIMIG RDO | |NLTR LICENSEE 24 HR REPORT | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N N 0 COLD SHUTDOWN | 0 COLD SHUTDOWN | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | THE LICENSEE REPORTED A CONDITION PROHIBITED BY TECH SPECS. THE REACTOR | | WAS IN THE REFUEL MODE WITH THE INTERMEDIATE RANGE NEUTRON MONITORING | | PROTECTIVE FUNCTION BYPASSED. JUMPERS TO BYPASS THE PROTECTIVE FUNCTION | | WERE PUT IN PLACE THROUGH HUMAN ERROR. | | | | TECH SPECS REQUIRE OPERATIONAL INTERMEDIATE RANGE (IR) NEUTRON MONITORS | | WHILE THE REACTOR IS IN THE REFUEL MODE. TECH SPECS REQUIRE CONTROL ROD | | INSERTION IF THE PROTECTIVE FUNCTIONS ARE INOPERABLE. THE CONTROL RODS | | WERE ALREADY FULLY INSERTED. THE LICENSEE'S IMMEDIATE CORRECTIVE ACTION | | WAS TO PLACE THE MODE SWITCH INTO THE COLD SHUTDOWN POSITION. COLD | | SHUTDOWN DOES NOT REQUIRE IR NEUTRON MONITORING. THE LICENSEE WILL ALSO | | REMOVE THE BYPASS JUMPERS TO RESTORE THE IR NEUTRON MONITORS TO OPERATIONAL | | STATUS. THE LICENSEE WILL INFORM THE NRC RESIDENT INSPECTOR. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 31027 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: CRYSTAL RIVER REGION: 2 |NOTIFICATION DATE: 09/19/96 | |UNIT: [3] [ ] [ ] STATE: FL |NOTIFICATION TIME: 05:47 [ET]| |RX TYPE: [3] B&W-L-LP |EVENT DATE: 09/19/96 | +------------------------------------------------+EVENT TIME: 05:10[EDT]| |NRC NOTIFIED BY: GREGORY SUTTER |LAST UPDATE DATE: 09/19/96 | |HQ OPS OFFICER: RUDY KARSCH +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: UNUSUAL EVENT +-----------------------------+ |10 CFR SECTION: |THOMAS DECKER RDO | |AAEC 50.72(a)(1)(i) EMERGENCY DECLARED |JACK ROE EO | | |WRIGHT FEMA | | |FRANK CONGEL AEOD | | |EUGENE MCPEEK IAT | | |JOHN DAVIDSON NMSS | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 3 | N N 0 COLD SHUTDOWN | 0 COLD SHUTDOWN | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | THE LICENSEE DECLARED AN UNUSUAL EVENT DUE TO AN APPARENT ACT OF SABOTAGE. | | THE LICENSEE DISCOVERED A FOREIGN OBJECT LODGED IN THE LUBE OIL STRAINER OF | | THEIR "A" EMERGENCY DIESEL GENERATOR. THE OBJECT APPEARED TO BE PLACED IN | | A WAY THAT INDICATED DELIBERATE ACTION. THE LICENSEE WILL STAY IN THE | | UNUSUAL EVENT UNTIL THEY ARE CERTAIN THAT THIS REPRESENTS A SINGULAR EVENT | | AND THAT THE "B" EDG IS NOT SIMILARLY JEOPARDIZED. THE LICENSEE INFORMED | | THE NRC RESIDENT INSPECTOR, THE STATE OF FLORIDA AND LOCAL GOVERNMENT | | AGENCIES. | | | | SEE HOO LOG FOR ADDITIONAL INFORMATION. | +------------------------------------------------------------------------------+