U.S. Nuclear Regulatory Commission Operations Center Event Reports For 10/31/95 - 11/01/95 ** EVENT NUMBERS ** 29471 29516 29529 29530 29531 29532 29533 29534 !!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!!!! +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 29471 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: WATERFORD REGION: 4 |NOTIFICATION DATE: 10/18/95 | |UNIT: [3] [ ] [ ] STATE: LA |NOTIFICATION TIME: 14:10 [ET]| |RX TYPE: [3] CE |EVENT DATE: 10/18/95 | +------------------------------------------------+EVENT TIME: 12:15[CDT]| |NRC NOTIFIED BY: GREG SCOTT |LAST UPDATE DATE: 10/31/95 | |HQ OPS OFFICER: LEIGH TROCINE +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |PHIL HARRELL RDO | |HFIT 26.73 FITNESS FOR DUTY | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 3 | N N 0 REFUELING | 0 REFUELING | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | DEROGATORY INFORMATION WAS DISCOVERED ON A CONTRACT EMPLOYEE WHO HAD | | CURRENT UNESCORTED ACCESS TO THE PROTECTED AREA. | | | | A CONTRACT EMPLOYEE'S PRE-EMPLOYMENT DRUG SCREENING RESULTS WERE CONFIRMED | | POSITIVE FOR MARIJUANA AFTER INITIALLY RELEASING THE RESULTS AS NEGATIVE. | | HAD THIS INFORMATION BEEN KNOWN PRIOR TO THE INDIVIDUAL RECEIVING | | UNESCORTED ACCESS, THE LICENSEE WOULD NOT HAVE GRANTED ACCESS. THE | | INDIVIDUAL'S ACCESS HAS BEEN SUSPENDED, AND A FOR-CAUSE TEST HAS BEEN | | ORDERED. | | | | THE LICENSEE PLANS TO NOTIFY THE NRC RESIDENT INSPECTOR. | | | | * * * 08:34 OCTOBER 31, 1995, RETRACTION FROM SCOTT TAKEN BY TROCINE * * * | | | | THE ORIGINAL DETERMINATION THAT THIS EVENT WAS REPORTABLE WAS BASED ON THE | | INFORMATION AVAILABLE WITHIN ONE HOUR OF THE EVENT OCCURRENCE. AN | | INVESTIGATION INTO THE FACTS OF THE EVENT DETERMINED THAT DUE TO AN | | ADMINISTRATIVE MIS-APPLICATION OF THE FITNESS-FOR-DUTY RULE BY LICENSEE | | PERSONNEL, THE INITIALLY SCREENED NEGATIVE RESULTS FROM THE HEALTH AND | | HUMAN SERVICES (HHS) LAB WERE THE RESULTS REQUIRED TO BE USED IN | | DETERMINING THE CONTRACT INDIVIDUAL'S DRUG SPECIMEN RESULTS. BECAUSE THE | | INITIALLY SCREENED DRUG SPECIMEN RESULTS BY THE HHS LAB WERE NEGATIVE, THIS | | EVENT DID NOT REPRESENT A DISCOVERY OF DEROGATORY INFORMATION ON THE | | INDIVIDUAL. ACCORDINGLY, WATERFORD 3 IS RETRACTING THIS NOTIFICATION. | | | | THE LICENSEE NOTIFIED THE NRC RESIDENT INSPECTOR. THE NRC OPERATIONS | | CENTER NOTIFIED THE R4DO (POWERS). REFER TO HOO LOG FOR CONTACT NUMBER. | +------------------------------------------------------------------------------+ !!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!!!! +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 29516 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: HADDAM NECK REGION: 1 |NOTIFICATION DATE: 10/27/95 | |UNIT: [1] [ ] [ ] STATE: CT |NOTIFICATION TIME: 14:12 [ET]| |RX TYPE: [1] W-4-LP |EVENT DATE: 10/19/95 | +------------------------------------------------+EVENT TIME: 23:50[EDT]| |NRC NOTIFIED BY: PIERRE L'HEUREUX |LAST UPDATE DATE: 10/31/95 | |HQ OPS OFFICER: BOB STRANSKY +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |RONALD BELLAMY RDO | |AINA 50.72(b)(2)(iii)(A) POT UNABLE TO SAFE SD | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | FIRE PROTECTION SYSTEM INOPERABLE DURING SYSTEM TESTING. | | | | DURING A LEAK TEST OF REPAIRS MADE TO THE FIRE SUPPRESSION SYSTEM, A 10" | | DIAMETER CROSS-CONNECT VALVE TO THE SERVICE WATER SYSTEM WAS INADVERTENTLY | | OPENED. THIS VALVE IS NORMALLY LOCKED CLOSED. WHEN ONE OF THE FIRE PUMPS | | WAS STARTED, FLOW FROM THE FIRE SUPPRESSION SYSTEM TO THE SERVICE WATER | | SYSTEM OCCURRED. THE ERROR WAS DETECTED AND CORRECTED WITHIN 27 MINUTES. | | | | THE LICENSEE STATED THAT BECAUSE THE CONTROL HAND SWITCH FOR THE OTHER FIRE | | SUPPRESSION PUMP WAS IN PULL-TO-LOCK, IF A FIRE HAD OCCURRED, THE FIRE | | SUPPRESSION SYSTEM WOULD NOT HAVE HAD ADEQUATE CAPACITY TO SUPPLY SPRINKLER | | HEADS. THEREFORE, IF A FIRE HAD OCCURRED IN A SAFETY RELATED AREA, THERE | | IS A POSSIBILITY THAT SUFFICIENT EQUIPMENT MAY NOT HAVE BEEN AVAILABLE TO | | ACHIEVE SAFE SHUTDOWN. THE LICENSEE DID NOT DETERMINE THE REPORTABILITY OF | | THIS EVENT UNTIL TODAY. THE NRC RESIDENT INSPECTOR HAS BEEN INFORMED BY | | THE LICENSEE. | | | | * * * UPDATE AT 1439 ON 10/31/95 BY HOMER TAKEN BY WEAVER * * * | | THE LICENSEE IS RETRACTING THIS EVENT BASED ON THE FOLLOWING EXPLANATION. | | THE LICENSEE'S TECHNICAL REQUIREMENTS MANUAL (NOT TECH SPECS) HAS AN | | "ACTION STATEMENT" WHEN THE FIRE SYSTEM IS INOPERABLE. THE ACTION | | STATEMENT REQUIRES A FIRE WATCH TO BE ESTABLISHED WITHIN ONE HOUR AND THE | | FIRE SYSTEM BE TO RESTORED TO AN OPERABLE STATUS WITHIN 24 HOURS. SINCE | | THE SYSTEM WAS INOPERABLE FOR 27 MINUTES, THE ACTION STATEMENT WAS NOT | | EXCEEDED. THEREFORE, THE LICENSEE FEELS THE EVENT IS NOT REPORTABLE. THE | | NRC RESIDENT INSPECTOR WILL BE INFORMED. THE HOO NOTIFIED THE R1DO | | (DOERFLEIN). | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 29529 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: LASALLE REGION: 3 |NOTIFICATION DATE: 10/31/95 | |UNIT: [1] [ ] [ ] STATE: IL |NOTIFICATION TIME: 12:28 [ET]| |RX TYPE: [1] GE-5,[2] GE-5 |EVENT DATE: 10/31/95 | +------------------------------------------------+EVENT TIME: 10:35[CST]| |NRC NOTIFIED BY: MUNDT |LAST UPDATE DATE: 10/31/95 | |HQ OPS OFFICER: DOUG WEAVER +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: ALERT +-----------------------------+ |10 CFR SECTION: |LEWIS MILLER RDO | |AAEC 50.72(a)(1)(i) EMERGENCY DECLARED |AL CHAFFEE EO | | |BERNICE CARR FEMA | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N Y 94 POWER OPERATION | 94 POWER OPERATION | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | ALERT DECLARED BASED ON HIGH RADIATION LEVELS IN CONTAINMENT | | | | AN ALERT WAS DECLARED AT 10:35 CST BASED ON HIGH RADIATION LEVELS IN THE | | REACTOR BUILDING. THE CAUSE OF THE HIGH RAD LEVELS IS BELIEVED TO BE A | | TRAVERSING INCORE PROBE (TIP) THAT WAS WITHDRAWN BEYOND THE SHIELDED | | STORAGE LOCATION IN THE REACTOR BUILDING. | | | | AN INTERLOCK DESIGNED TO PREVENT OVERTRAVEL DID NOT WORK. THE EXACT CAUSE | | OF THE FAILURE IS NOT KNOWN. RADIATION LEVELS IN THE GENERAL AREA WERE | | MEASURED AT 500 mR/HR. AN EXPOSURE RATE OF 7 R/HR WAS MEASURED AT THE | | SURFACE OF THE PLATFORM SUPPORTING THE TIP DRIVE MECHANISM. | | | | THE REACTOR BUILDING HAS BEEN EVACUATED, AND CONTAINMENT ACCESS IS BEING | | CONTROLLED TO PREVENT A PERSONNEL OVEREXPOSURE ACCIDENT. | | | | THE LICENSEE HAS STAFFED THE TECHNICAL SUPPORT CENTER (TSC). THE RESIDENT | | INSPECTOR HAS BEEN NOTIFIED. | | | | * * * UPDATE AT 17:10 ON 10/31/95 BY GAROLD SWIHART TAKEN BY WEAVER * * * | | | | THE ALERT WAS TERMINATED AT 16:00 CST. CONTROLLED ACCESS TO THE REACTOR | | BUILDING HAS BEEN RESTORED. ACCESS TO ALL AREAS REQUIRED BY NORMAL, | | EMERGENCY AND SAFE SHUTDOWN PROCEDURES HAS BEEN RESTORED. THE AREA AROUND | | THE TIP IS BEING CONTROLLED AS A HIGH RADIATION AREA. THE LICENSEE PLANS | | TO LET THE RADIATION LEVELS DECAY PRIOR TO ATTEMPTING RETRIEVAL OF THE TIP | | LATER THIS WEEK. THE HOO NOTIFIED THE RDO (MILLER), EO (SPESSARD), AND | | FEMA (EARL). | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 29530 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: MILLSTONE REGION: 1 |NOTIFICATION DATE: 10/31/95 | |UNIT: [ ] [2] [ ] STATE: CT |NOTIFICATION TIME: 13:32 [ET]| |RX TYPE: [1] GE-3,[2] CE,[3] W-4-LP |EVENT DATE: 10/31/95 | +------------------------------------------------+EVENT TIME: 12:50[EST]| |NRC NOTIFIED BY: JOHN BECKER |LAST UPDATE DATE: 10/31/95 | |HQ OPS OFFICER: DOUG WEAVER +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |LAWRENCE DOERFLEIN RDO | |AINB 50.72(b)(2)(iii)(B) POT RHR INOP | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | | | 2 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | BOLTS MADE OF THE WRONG MATERIAL WERE USED IN SUPPORTS FOR THE TWO SHUTDOWN | | COOLING HEAT EXCHANGERS | | | | AN OPERATOR ON ROUTINE ROUNDS NOTICED A BROKEN BOLT ON ONE OF THE SHUTDOWN | | HEAT EXCHANGERS ON OCTOBER 24TH. ENGINEERING REVIEW DETERMINED ON OCTOBER | | 30TH THAT BOLTS OF THE WRONG MATERIAL WERE USED. THE AS-FOUND BOLTS WERE | | MADE OF A307 CARBON STEEL. THE CORRECT MATERIAL IS A490 HIGH TENSILE | | STRENGTH CARBON STEEL. A TOTAL OF TWO OF THESE BOLTS ARE USED ON EACH HEAT | | EXCHANGER. THE BOLTS HAVE BEEN REPLACED WITH ONES MADE OF THE CORRECT | | MATERIAL. THE LICENSEE CONCLUDED THAT THE HEAT EXCHANGERS WERE INOPERABLE | | IN THE AS-FOUND CONDITION. | | | | THE LICENSEE IS INVESTIGATING HOW THESE BOLTS CAME TO BE INSTALLED AND IS | | ALSO LOOKING TO SEE IF ANY OTHER BOLTS OF THE WRONG MATERIAL ARE USED | | THROUGHOUT THE PLANT. | | | | THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR. THE APPROPRIATE STATE | | AND LOCAL OFFICIALS WERE ALSO NOTIFIED. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 29531 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: MILLSTONE REGION: 1 |NOTIFICATION DATE: 10/31/95 | |UNIT: [1] [2] [3] STATE: CT |NOTIFICATION TIME: 17:17 [ET]| |RX TYPE: [1] GE-3,[2] CE,[3] W-4-LP |EVENT DATE: 10/31/95 | +------------------------------------------------+EVENT TIME: 01:00[EST]| |NRC NOTIFIED BY: RICHARD KRAEMER |LAST UPDATE DATE: 10/31/95 | |HQ OPS OFFICER: DOUG WEAVER +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |LAWRENCE DOERFLEIN RDO | |HFIT 26.73 FITNESS FOR DUTY | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | 2 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | 3 | N Y 100 POWER OPERATION | 100 POWER OPERATION | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | A SUPERVISORY CONTRACT EMPLOYEE WAS ARRESTED FOR THE POSSESSION OF A | | CONTROLLED SUBSTANCE. THE EMPLOYEE'S ACCESS TO THE SITE HAS BEEN | | SUSPENDED. THE NRC RESIDENT AND APPROPRIATE STATE AND LOCAL OFFICIALS HAVE | | BEEN NOTIFIED. SEE HOO LOG FOR DETAILS. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |OTHER NUCLEAR MATERIAL | |EVENT NUMBER: 29532 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |LICENSEE: FMC |NOTIFICATION DATE: 10/31/95 | | CITY: GREEN RIVER REGION: 4 |NOTIFICATION TIME: 17:30 [ET]| | COUNTY: STATE: WY |EVENT DATE: 10/31/95 | |LICENSE#: AGREEMENT: N |EVENT TIME: 12:00[MST]| | DOCKET: |LAST UPDATE DATE: 10/31/95 | | +-----------------------------+ | |PERSON ORGANIZATION| | |DALE POWERS RDO | | | | +------------------------------------------------+ | |NRC NOTIFIED BY: LEWIS KORITNIK | | |HQ OPS OFFICER: DOUG WEAVER | | +------------------------------------------------+ | |EMERGENCY CLASS: NOT APPLICABLE | | |10 CFR SECTION: | | |NINF INFORMATION ONLY | | | | | | | | | | | | | | +------------------------------------------------+-----------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | A DENSITY GAUGE WAS SHIPPED WITH THE SHUTTER OPEN | | | | A DENSITY GAUGE WAS INADVERTENTLY TAKEN FROM AN FMC FACILITY IN GREEN | | RIVER, WYOMING, BY A CONTRACTOR. THE CONTRACTOR, RACHO INTERNATIONAL, | | TRANSPORTED THE GAUGE TO ITS FACILITY IN SPOKANE, WASHINGTON. | | | | THE GAUGE IS A BERTHOLD MODEL LD367 WITH A LB-7440 SOURCE HOLDER. THE | | GAUGE CONTAINS 150 mCi OF Cs-137. THE RADIATION SAFETY OFFICER WITH RACHO | | INTERNATIONAL HAS LOCATED AND ISOLATED THE GAUGE. A SURVEY CONDUCTED AT | | THE RACHO INTERNATIONAL FACILITY YIELDED 1.4 mR/HR AT 1 FOOT FROM THE | | GAUGE. | | | | THIS EVENT WAS REPORTED TO THE REGION IV OFFICE. CONTACT NAMES AND PHONE | | NUMBERS ARE AVAILABLE IN THE HOO LOG. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 29533 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: MILLSTONE REGION: 1 |NOTIFICATION DATE: 10/31/95 | |UNIT: [ ] [2] [ ] STATE: CT |NOTIFICATION TIME: 18:16 [ET]| |RX TYPE: [1] GE-3,[2] CE,[3] W-4-LP |EVENT DATE: 10/31/95 | +------------------------------------------------+EVENT TIME: 17:52[EST]| |NRC NOTIFIED BY: BECKER |LAST UPDATE DATE: 10/31/95 | |HQ OPS OFFICER: DOUG WEAVER +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |LAWRENCE DOERFLEIN RDO | |AOUT 50.72(b)(1)(ii)(B) OUTSIDE DESIGN BASIS | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | | | 2 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | CONTROL ROOM AIR CONDITIONING FAN MOTOR NOT CERTIFIED | | | | CONTROL ROOM AIR CONDITIONING FAN MOTOR F-36A WAS FOUND NOT TO HAVE THE | | PROPER CERTIFICATION. THE CERTIFICATION DOES INDICATE THAT FAN WILL START | | UNDER DEGRADED VOLTAGE CONDITIONS. THE DEFICIENCY WAS FOUND DURING AN | | ENGINEERING REVIEW. THE PLANT ENTERED A 7-DAY LCO BECAUSE THE FAN HAS BEEN | | DECLARED INOPERABLE. | | | | TECHNICAL DATA HAS BEEN REQUESTED FROM THE MANUFACTURER AND WILL BE | | REVIEWED LATER THIS WEEK. | | | | THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR. APPROPRIATE STATE AND | | LOCAL OFFICIALS HAVE BEEN NOTIFIED. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |OTHER NUCLEAR MATERIAL | |EVENT NUMBER: 29534 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |LICENSEE: ANS CONSULTANTS, INC. |NOTIFICATION DATE: 10/31/95 | | CITY: EDISON REGION: 1 |NOTIFICATION TIME: 20:50 [ET]| | COUNTY: STATE: NJ |EVENT DATE: 10/31/95 | |LICENSE#: 29-30183-01 AGREEMENT: N |EVENT TIME: 18:15[EST]| | DOCKET: |LAST UPDATE DATE: 10/31/95 | | +-----------------------------+ | |PERSON ORGANIZATION| | |LAWRENCE DOERFLEIN RDO | | | | +------------------------------------------------+ | |NRC NOTIFIED BY: ATUL SHAH | | |HQ OPS OFFICER: DOUG WEAVER | | +------------------------------------------------+ | |EMERGENCY CLASS: NOT APPLICABLE | | |10 CFR SECTION: | | |NINF INFORMATION ONLY | | | | | | | | | | | | | | +------------------------------------------------+-----------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | ANS CONSULTANTS REPORTED THAT A TROXLER DENSITY GAUGE WAS RUN OVER | | | | A TROXLER DENSITY GAUGE WAS RUN OVER AT A JOB SITE ON INTERSTATE 80 EAST | | BOUND NEAR EXIT 65. THE GAUGE CONTAINS 8 mCi OF Cs-137. A VISUAL | | INSPECTION AT THE JOB SITE INDICATED THAT THE SOURCE HOLDER WAS STILL | | INTACT. THE GAUGE WAS PACKED UP AND RETURNED TO THE ANS FACILITY IN | | EDISON, NEW JERSEY. | | | | SURVEYS CONDUCTED AT THE ANS FACILITY SHOW NORMAL RADIATION LEVELS AROUND | | THE GAUGE. PARTS OF THE GAUGE WILL BE SENT TO TROXLER TOMORROW FOR LEAK | | TESTING. A CONTACT PHONE NAME AND PHONE NUMBER ARE AVAILABLE IN THE HOO | | LOG. | +------------------------------------------------------------------------------+