U.S. Nuclear Regulatory Commission Operations Center Event Reports For 08/15/95 - 08/16/95 ** EVENT NUMBERS ** 29198 29199 29200 29201 29202 29203 +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 29198 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: PALISADES REGION: 3 |NOTIFICATION DATE: 08/15/95 | |UNIT: [1] [ ] [ ] STATE: MI |NOTIFICATION TIME: 05:11 [ET]| |RX TYPE: [1] CE |EVENT DATE: 08/15/95 | +------------------------------------------------+EVENT TIME: 03:39[EDT]| |NRC NOTIFIED BY: MARK HOLBEIN |LAST UPDATE DATE: 08/15/95 | |HQ OPS OFFICER: JOSEPH SEBROSKY +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |GEOFFREY WRIGHT RDO | |ARPS 50.72(b)(2)(ii) RPS ACTUATION | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | M/R N 0 HOT STANDBY | 0 HOT SHUTDOWN | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | MANUAL REACTOR TRIP DURING CONTROL ROD DROP TIMING TEST DUE TO A LEAK ON A | | PRIMARY COOLANT SYSTEM FLOW INSTRUMENT. | | | | THE LEAK STARTED AT APPROXIMATELY 02:48 AND WAS ESTIMATED TO BE | | APPROXIMATELY 11 GPM. THE INDICATIONS OF THE LEAK WERE SMOKE DETECTORS IN | | CONTAINMENT ALARMING AND OPERATORS NOTICING THE LOWERING OF A READING OF | | ONE OF THE PRIMARY COOLANT SYSTEM FLOW INSTRUMENTS. THE LOWERED READING OF | | THE PRIMARY COOLANT SYSTEM FLOW INSTRUMENT CAUSED ONE CHANNEL OF THE | | REACTOR PROTECTION SYSTEM TO TRIP. (THE FLOW SIGNAL SERVES AS AN INPUT TO | | THE RPS SYSTEM AND IS USED TO CAUSE A LOW FLOW SCRAM.) | | | | AT THE TIME OF THE LEAK, ALL CONTROL RODS (WITH ONE EXCEPTION) WERE LATCHED | | AND AT THE 2.5 INCH POSITION. ONE CONTROL ROD WAS BEING WITHDRAWN TO | | PERFORM SCRAM TIME TESTING. THE OPERATORS MANUALLY INSERTED THE PARTIALLY | | WITHDRAWN CONTROL ROD BASED ON THE ABOVE INDICATIONS. | | | | IN PARALLEL WITH INSERTING THE ROD, AN OPERATOR WAS DISPATCHED TO ISOLATE | | THE ROOT VALVES FOR THE AFFECTED INSTRUMENT. DURING THE ISOLATION OF THE | | ROOT VALVES, OPERATORS IN THE CONTROL ROOM RECEIVED INDICATIONS OF OTHER | | RPS CHANNELS (PRE-TRIPS) BEING AFFECTED. AT THIS TIME, IT APPEARS THAT THE | | ROOT ISOLATION VALVES FOR THE INSTRUMENTATION WERE MISLABELED CAUSING THE | | WRONG INSTRUMENT LINES TO BE ISOLATED. | | | | BASED ON THE INDICATIONS OF MULTIPLE RPS CHANNELS TRIPPING, THE SHIFT | | SUPERVISOR ORDERED A MANUAL REACTOR SCRAM. ALL CONTROL RODS WERE LATCHED | | AND AT THE 2.5 INCH POSITION AT THE TIME OF THIS ORDER. ALL RODS FULLY | | INSERTED ON THE SCRAM. | | | | THE LEAK LASTED FROM APPROXIMATELY 02:48 TO 04:07 AT WHICH TIME IT WAS | | ISOLATED. ALL EMERGENCY CORE COOLING SYSTEMS AND EMERGENCY DIESEL | | GENERATORS ARE OPERABLE. THE LICENSEE IS CONTINUING TO INVESTIGATE THE | | CAUSE OF THE PROBLEM. | | | | THE LICENSEE HAS INFORMED THE NRC RESIDENT INSPECTOR. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 29199 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: BRUNSWICK REGION: 2 |NOTIFICATION DATE: 08/15/95 | |UNIT: [1] [2] [ ] STATE: NC |NOTIFICATION TIME: 11:56 [ET]| |RX TYPE: [1] GE-4,[2] GE-4 |EVENT DATE: 08/15/95 | +------------------------------------------------+EVENT TIME: 11:34[EDT]| |NRC NOTIFIED BY: ROUSE |LAST UPDATE DATE: 08/15/95 | |HQ OPS OFFICER: TIM McGINTY +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: UNUSUAL EVENT +-----------------------------+ |10 CFR SECTION: |JEROME BLAKE RDO | |AAEC 50.72(a)(1)(i) EMERGENCY DECLARED |DENNIG EO | |APRE 50.72(b)(2)(vi) OFFSITE NOTIFICATION |STEINDRUFF FEMA | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | 2 | N Y 25 POWER OPERATION | 25 POWER OPERATION | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | UNUSUAL EVENT DECLARED DUE TO A POSTED HURRICANE WARNING. | | | | BRUNSWICK UNITS 1 AND 2 DECLARED AN UNUSUAL EVENT AT 11:34 EDT DUE TO A | | HURRICANE WARNING BEING POSTED IN RESPONSE TO HURRICANE FELIX. BOTH UNITS | | ARE CURRENTLY STABLE WITH OFFSITE POWER AVAILABLE. THE EDGs, ECCSs, AND | | RCIC ARE OPERABLE AT BOTH UNITS. UNIT 2 IS AT A REDUCED POWER OF | | APPROXIMATELY 25% DUE TO A CONDENSER TUBE LEAK IN THE 'B' NORTH WATER BOX. | | UNIT 2 INHOUSE LOADS HAVE BEEN TRANSFERRED TO THE STARTUP AUXILIARY | | TRANSFORMER. THE LICENSEE HAS IMPLEMENTED PROCEDURE AI-68, BRUNSWICK | | NUCLEAR PLANT RESPONSE TO SEVERE WEATHER WARNINGS. | | | | THE LICENSEE HAS NOTIFIED THE STATE AND LOCAL AUTHORITIES AND THE NRC | | RESIDENT INSPECTOR. | | | | * * * 15:28 AUGUST 15, 1995, UPDATE FROM REINSBURROW TAKEN BY TROCINE * * * | | | | THE LICENSEE SPECIFIED THAT A NOTIFICATION OF OFFSITE AGENCIES WAS MADE DUE | | TO THE DECLARATION OF THE UNUSUAL EVENT FOR HURRICANE FELIX. THE LICENSEE | | NOTIFIED THE STATE OF NORTH CAROLINA, BRUNSWICK COUNTY, AND NEW HANOVER | | COUNTY. | | | | THE NRC OPERATIONS CENTER NOTIFIED THE R2DO (CHRISTENSEN). | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |HOSPITAL | |EVENT NUMBER: 29200 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |LICENSEE: THOMAS JEFFERSON UNIVERSITY |NOTIFICATION DATE: 08/15/95 | | CITY: PHILADELPHIA REGION: 1 |NOTIFICATION TIME: 12:10 [ET]| | COUNTY: STATE: PA |EVENT DATE: 08/14/95 | |LICENSE#: 37-00148-06 AGREEMENT: N |EVENT TIME: 12:30[EDT]| | DOCKET: |LAST UPDATE DATE: 08/15/95 | | +-----------------------------+ | |PERSON ORGANIZATION| | |JOHN ROGGE RDO | | | | +------------------------------------------------+ | |NRC NOTIFIED BY: JOHN KEKLAK | | |HQ OPS OFFICER: LEIGH TROCINE | | +------------------------------------------------+ | |EMERGENCY CLASS: NOT APPLICABLE | | |10 CFR SECTION: | | |LADM 35.33(a) MED MISADMINISTRATION | | | | | | | | | | | | | | +------------------------------------------------+-----------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | REPOSITIONING OF THE ACTIVE LEADS OF TWO OF SIX 10 MILLICURIE IRIDIUM-192 | | SOURCES DURING A TREATMENT AT THOMAS JEFFERSON UNIVERSITY LOCATED IN | | PHILADELPHIA, PENNSYLVANIA. | | | | AT APPROXIMATELY 12:30 ON AUGUST 14, 1995, A PHYSICIAN MAKING ROUTINE | | ROUNDS VISITED A PATIENT BEING TREATED WITH AN ARRAY OF 10 MILLICURIE | | IRIDIUM-192 SOURCES FOR THE TREATMENT OF THE TONGUE AND PALLET, AND THE | | PHYSICIAN IDENTIFIED THAT THE ACTIVE LEAD ENDS OF TWO OF SIX CATHETERS HAD | | BEEN REPOSITIONED TO THE OUTSIDE OF THE CHEEK FROM THE INSIDE OF THE MOUTH. | | INVESTIGATION REVEALED THAT A NURSE RESPONDING TO A PATIENT COMPLAINT THAT | | THE CATHETERS WERE LOOSE HAD RETAPED THE CATHETER ENDS AT APPROXIMATELY | | 11:00. APPARENTLY, THERE WERE NONACTIVE CATHETER ENDS THAT WERE TAPED TO | | THE CHEEK, AND THE TYPE OF CATHETERS THAT WERE BEING USED WITH THE SOURCES | | IN THEM WERE MORE OPAQUE THAN USUAL. IT WAS ANTICIPATED THAT FOLLOWUP DOSE | | REDISTRIBUTION WITH A HIGH DOSE RATE MACHINE TO THE SAME SITE MAY BE NEEDED | | SO THE LOW DOSE RATE SOURCES WERE LOADED INTO A HIGH DOSE RATE CATHETER. | | THEREFORE, THE NURSE DID NOT RECOGNIZED THE SEEDS INSIDE THE CATHETER | | BECAUSE THEY WERE NOT VISIBLE, AND IT WAS THOUGHT THAT JUST THE NONACTIVE | | LEADS HAD COME LOOSE. DUE TO DIFFICULTY WITH THE TREATMENT IN GENERAL, | | THE TREATMENT WAS ABORTED AT 13:20. THE PATIENT HAS BEEN INFORMED. | | | | THE TOTAL PRESCRIBED DOSE TO THE TUMOR INSIDE THE MOUTH WAS 5,020 | | CENTIGRAYS, AND THE TREATMENT WAS COMMENCED AT 19:20 ON AUGUST 10, 1995. | | THE TUMOR RECEIVED APPROXIMATELY 2,000 CENTIGRAYS LESS THAN PRESCRIBED | | BECAUSE THE TREATMENT WAS TERMINATED EARLY. | | | | THE LICENSEE DETERMINED THAT THE DOSE TO THE PATIENT'S CHEEK RESULTING FROM | | THE REPOSITIONING WAS ABOUT 70 RADs. IF THE TREATMENT HAD PROCEEDED | | NORMALLY (FOR ANOTHER 70 HOURS), THE SAME AREA WOULD HAVE RECEIVED 1,500 | | RADs. THE CATHETERS HAD ALREADY BEEN IN POSITION FOR APPROXIMATELY 90 | | HOURS. | | | | THE AMOUNT OF TIME THAT THE NURSE WOULD HAVE BEEN IN PROXIMITY OF THE | | SOURCES TO RETAPE THEM WAS MINIMAL. | | | | THE LICENSEE PLANS TO ENHANCE ITS TRAINING PROGRAM IN SEVERAL WAYS, TO | | INCREASE THE SOURCE PHYSICIAN CHECK FREQUENCY, AND TO INVESTIGATE WAYS TO | | BETTER IDENTIFY THE ACTIVE ENDS OF THE CATHETERS. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 29201 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: PEACH BOTTOM REGION: 1 |NOTIFICATION DATE: 08/15/95 | |UNIT: [2] [3] [ ] STATE: PA |NOTIFICATION TIME: 14:23 [ET]| |RX TYPE: [2] GE-4,[3] GE-4 |EVENT DATE: 08/15/95 | +------------------------------------------------+EVENT TIME: 10:35[EDT]| |NRC NOTIFIED BY: JOHN J. BOUCK |LAST UPDATE DATE: 08/15/95 | |HQ OPS OFFICER: LEIGH TROCINE +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |JOHN ROGGE RDO | |AESF 50.72(b)(2)(ii) ESF ACTUATION | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 2 | N Y 100 POWER OPERATION | 95 POWER OPERATION | | 3 | N Y 66 POWER OPERATION | 66 POWER OPERATION | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | ESF ACTUATIONS ON BOTH UNITS DUE TO THE TRIPPING OF A STARTUP SOURCE | | BREAKER. | | | | AT 14:23, THE NUMBER 2 STARTUP SOURCE BREAKER (SU-25) TRIPPED. THIS | | BREAKER IS THE SOURCE BREAKER FOR THE 13KV SYSTEM WHICH IN TURN SUPPLIES | | THE 4KV EMERGENCY BUSSES. THERE ARE FOUR 4KV EMERGENCY BUSSES PER UNIT. | | TWO 4KV EMERGENCY BUSSES COME OFF OF THE NUMBER 2 STARTUP SOURCE AND TWO | | 4KV EMERGENCY BUSSES COME OFF THE NUMBER 3 STARTUP SOURCE ON EACH UNIT. THE | | TRIPPING OF THE NUMBER 2 STARTUP SOURCE BREAKER CAUSED A FAST TRANSFER OF | | TWO 4KV EMERGENCY BUSSES PER UNIT. DUE TO THE MOMENTARY LOSS OF POWER, ESF | | ACTUATIONS OCCURRED. THE FOLLOWING ISOLATIONS OCCURRED ON UNIT 2: THE | | INBOARD OXYGEN ANALYZER VALVE, THE INBOARD DRYWELL SUMP ISOLATION VALVES, | | THE INBOARD DRYWELL 2 INCH VENT, AND THE INBOARD DRYWELL INSTRUMENT | | NITROGEN VALVE. THE FOLLOWING ISOLATIONS OCCURRED ON UNIT 3: THE OUTBOARD | | OXYGEN ANALYZER VALVE, THE OUTBOARD DRYWELL SUMP ISOLATION VALVES, THE | | OUTBOARD DRYWELL INSTRUMENT NITROGEN VALVE, AND THE TORUS INSTRUMENT | | NITROGEN VALVE. ESF ACTUATIONS WHICH OCCURRED BUT ARE EXEMPTED FROM | | REPORTABILITY WERE NOT INCLUDED. ALL SYSTEMS FUNCTIONED AS REQUIRED. | | | | CURRENTLY, ALL OF THE 4KV BUSSES ARE BEING POWER FROM THE NUMBER 3 STARTUP | | SOURCE. THIS PLACES THE UNITS IN A SEVEN-DAY TECHNICAL SPECIFICATION | | LIMITING CONDITION FOR OPERATION. THE LICENSEE IS ATTEMPTING TO TRANSFER | | THESE BUSSES TO ANOTHER STARTUP SOURCE TO EXIT THE LIMITING CONDITION FOR | | OPERATION. THE EMERGENCY DIESEL GENERATORS DID NOT START BECAUSE OF THE | | FAST TRANSFER, AND THEY ARE AVAILABLE IF NEEDED. THE 13KV SOURCE BREAKER | | IS NOT BACK IN SERVICE YET, AND THE CAUSE OF THE BREAKER TRIP IS CURRENTLY | | UNDER INVESTIGATION. THERE WAS NO ADVERSE WEATHER IN THE AREA AT THE TIME | | OF THE BREAKER TRIP. | | | | POWER WAS REDUCED ON UNIT 2 DUE TO AN ISOLATION OF A FEEDWATER HEATER | | STRING. POWER ASCENSION IS IN PROGRESS. A POWER REDUCTION ON UNIT 3 WAS | | NOT NECESSARY. | | | | THE LICENSEE NOTIFIED THE NRC RESIDENT INSPECTOR. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 29202 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: ZION REGION: 3 |NOTIFICATION DATE: 08/15/95 | |UNIT: [1] [2] [ ] STATE: IL |NOTIFICATION TIME: 14:33 [ET]| |RX TYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 08/15/95 | +------------------------------------------------+EVENT TIME: 13:30[CDT]| |NRC NOTIFIED BY: CURTIS BASNER |LAST UPDATE DATE: 08/15/95 | |HQ OPS OFFICER: LEIGH TROCINE +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |GEOFFREY WRIGHT RDO | |ASHU 50.72(b)(1)(i)(A) PLANT S/D REQD BY TS | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N Y 100 POWER OPERATION | 99 POWER OPERATION | | 2 | N Y 100 POWER OPERATION | 99 POWER OPERATION | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | TECHNICAL SPECIFICATION REQUIRED SHUTDOWN ENTERED ON BOTH UNITS DUE TO | | CONTAINMENT PATHWAYS NOT BEING TESTED IN ACCORDANCE WITH APPENDIX J. | | | | ON AUGUST 14, 1995, IT WAS IDENTIFIED THAT 23 CONTAINMENT PATHWAYS ON UNIT | | 1 AND 18 CONTAINMENT PATHWAYS ON UNIT 2 HAD NOT BEEN TESTED IN ACCORDANCE | | WITH THE PROVISIONS OF 10 CFR PART 50, APPENDIX J. AS A RESULT, UNITS 1 | | AND 2 WERE PLACED ON A 24 HOUR LIMITING CONDITION FOR OPERATION FOR MISSED | | SURVEILLANCE IN ACCORDANCE WITH TECHNICAL SPECIFICATION 4.0.3 AT 12:30 CDT | | ON AUGUST 14, 1995. AT 12:30 CDT ON AUGUST 15, 1995, THE 24 HOUR PERIOD TO | | CONDUCT THESE SURVEILLANCES EXPIRED. AT THAT TIME, UNITS 1 AND 2 ENTERED A | | 5 HOUR LIMITING CONDITION FOR OPERATION TO SHUTDOWN IN ACCORDANCE WITH | | TECHNICAL SPECIFICATION 3.0.3. THIS ACTION STATEMENT ALLOWS THE LICENSEE 1 | | HOUR TO PREPARE TO SHUTDOWN WITH THE SUBSEQUENT 4 HOURS TO ENTER MODE 3, | | HOT SHUTDOWN. THE LICENSEE COMMENCED RAMPING POWER DOWN ON BOTH UNITS AT | | 13:30 CDT AND PLANS TO HAVE BOTH UNITS SHUTDOWN WITHIN APPROXIMATELY 4 | | HOURS. THE LICENSEE IS CURRENTLY PURSUING ENFORCEMENT DISCRETION AND HAS | | INFORMED THE NRC RESIDENT INSPECTOR. | | | | * * * 16:55 AUGUST 15, 1995, UPDATE RECEIVED FROM OBEREMBT BY TROCINE * * * | | | | A NOTICE OF ENFORCEMENT DISCRETION WAS BEEN GRANTED FOR BOTH UNITS AT 15:00 | | CDT. ACCORDING TO THIS NOTICE, THE LICENSEE HAS UNTIL 15:00 ON 08/16/95 TO | | SUBMIT AN EXEMPTION REQUEST FOR TESTING. BOTH UNITS ARE CURRENTLY | | RETURNING TO RATED POWER. REACTOR POWER HAD BEEN REDUCED TO 73% AND 69% | | FOR UNITS 1 AND 2, RESPECTIVELY. POWER ASCENSION WAS COMMENCED AT | | APPROXIMATELY 15:10 CDT. | | | | THE NRC OPERATIONS CENTER NOTIFIED THE R3DO (WRIGHT). | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 29203 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: INDIAN POINT REGION: 1 |NOTIFICATION DATE: 08/15/95 | |UNIT: [2] [ ] [ ] STATE: NY |NOTIFICATION TIME: 22:17 [ET]| |RX TYPE: [2] W-4-LP,[3] W-4-LP |EVENT DATE: 08/15/95 | +------------------------------------------------+EVENT TIME: 21:25[EDT]| |NRC NOTIFIED BY: CHRIS MASSARO |LAST UPDATE DATE: 08/15/95 | |HQ OPS OFFICER: LEIGH TROCINE +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |JOHN ROGGE RDO | |ANHU 50.72(b)(1)(iii) HURRICANE | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 2 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | HURRICANE FELIX IS LOCATED WITHIN 500 MILES OF THE FACILITY. | | | | IN ACCORDANCE WITH THE TECHNICAL SPECIFICATIONS, THE LICENSEE REPORTED THAT | | HURRICANE FELIX IS LOCATED WITHIN 500 MILES OF THE FACILITY WITH WIND GUSTS | | OF APPROXIMATELY 100 MILES PER HOUR. | | | | THE LICENSEE WILL NOTIFY THE NRC RESIDENT INSPECTOR. | +------------------------------------------------------------------------------+