U.S. Nuclear Regulatory Commission Operations Center Event Reports For 08/03/95 - 08/04/95 ** EVENT NUMBERS ** 29151 29153 29154 29155 29156 29157 29158 29159 +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 29151 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: WATERFORD REGION: 4 |NOTIFICATION DATE: 08/02/95 | |UNIT: [3] [ ] [ ] STATE: LA |NOTIFICATION TIME: 20:21 [ET]| |RX TYPE: [3] CE |EVENT DATE: 08/02/95 | +------------------------------------------------+EVENT TIME: 18:53[CDT]| |NRC NOTIFIED BY: WYNN |LAST UPDATE DATE: 08/03/95 | |HQ OPS OFFICER: TIM McGINTY +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: UNUSUAL EVENT +-----------------------------+ |10 CFR SECTION: |JOHN PELLET RDO | |AAEC 50.72(a)(1)(i) EMERGENCY DECLARED |BRUCE BOGER EO | | |STEINDRUFF FEMA | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 3 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | UNUSUAL EVENT DECLARED DUE TO A HURRICANE WARNING BEING POSTED FOR ST. | | CHARLES PARISH. | | | | THE LICENSEE DECLARED AN UNUSUAL EVENT AT 1853 CDT BASED ON ST. CHARLES | | PARISH BEING UNDER A HURRICANE WARNING. THE UNIT IS CURRENTLY OPERATING AT | | 100% POWER AND IS NOT EXPERIENCING ANY OPERATIONAL DIFFICULTIES. THE | | LICENSEE HAS IMPLEMENTED PERFORMANCE OF THE OFF-NORMAL PROCEDURE FOR | | HURRICANE PREPARATION AND WILL BE VERIFYING THE OPERABILITY OF THE EDGs | | LATER ON TONIGHT. THE BASIS FOR TERMINATING THE UNUSUAL EVENT WOULD BE THE | | REMOVAL OF THE HURRICANE WARNING FOR ST. CHARLES PARISH. | | | | THE LICENSEE WILL INFORM THE NRC OPERATIONS CENTER IF SITE OR PLANT | | CONDITIONS CHANGE. ERIN IS CURRENTLY A TROPICAL STORM LOCATED AT 28.8øN | | AND 84.7øW AS OF 2000 EDT. WINDS ARE PRESENTLY 70 MPH WITH GUSTS UP TO 85 | | MPH. ERIN IS MOVING WEST-NORTHWEST AT A SPEED OF 17 MPH AND IS EXPECTED TO | | MOVE PARALLEL TO THE FLORIDA PANHANDLE THIS EVENING. THERE IS A CHANCE | | THAT ERIN WILL STRENGTHEN TO A CATEGORY ONE HURRICANE BEFORE MOVING INLAND. | | THE HURRICANE WARNING IS IN EFFECT FROM THE MOUTH OF THE SUWANNEE RIVER | | WESTWARD TO THE MOUTH OF THE MISSISSIPPI RIVER INCLUDING NEW ORLEANS. | | PROJECTED LANDFALL OF ERIN IS THURSDAY MORNING AROUND 0800 CDT. | | | | THE LICENSEE INFORMED STATE AND LOCAL AUTHORITIES AND THE NRC RESIDENT | | INSPECTOR. | | | | *** UPDATE RECEIVED AT 1542 ON AUGUST 3, 1995, FROM BAKER BY TROCINE *** | | | | THE LICENSEE TERMINATED THE UNUSUAL EVENT AT 1437 CDT ON AUGUST 3, 1995, | | DUE TO THE TERMINATION OF THE HURRICANE WARNING. A TORNADO WATCH IS STILL | | IN EFFECT AT THIS TIME. THE LICENSEE NOTIFIED THE OPERATIONAL HOT LINE | | MEMBERS INCLUDING THE ST. CHARLES PARISH EMERGENCY OPERATING CENTER, ST. | | JOHNS PARISH EMERGENCY OPERATING CENTER, TWO LOUISIANA STATE DEPARTMENTS, | | AND WATERFORD UNITS 1 AND 2. THE LICENSEE WILL ALSO NOTIFY THE NRC | | RESIDENT INSPECTOR. THE NRC OPERATIONS CENTER NOTIFIED THE R4DO (PELLET), | | NRR EO (BOGER), AND FEMA (SHULL). | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 29153 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: SAINT LUCIE REGION: 2 |NOTIFICATION DATE: 08/02/95 | |UNIT: [1] [ ] [ ] STATE: FL |NOTIFICATION TIME: 21:58 [ET]| |RX TYPE: [1] CE,[2] CE |EVENT DATE: 08/02/95 | +------------------------------------------------+EVENT TIME: 21:25[EDT]| |NRC NOTIFIED BY: SNYDER |LAST UPDATE DATE: 08/03/95 | |HQ OPS OFFICER: TIM McGINTY +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: UNUSUAL EVENT +-----------------------------+ |10 CFR SECTION: |CHARLES CASTO RDO | |AAEC 50.72(a)(1)(i) EMERGENCY DECLARED |BRUCE BOGER EO | | |BELCHER FEMA | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N N 0 HOT STANDBY | 0 HOT STANDBY | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | PRECAUTIONARY UNUSUAL EVENT WAS DECLARED DUE TO A 2 gpm IDENTIFIED LEAK | | RATE CAUSED BY THE FAILURE OF THE '1A2' RCP SEAL PACKAGE. | | | | AT 2125 EDT ON 8/2/95, A PRECAUTIONARY UNUSUAL EVENT WAS DECLARED DUE TO | | THE CONFIRMED IDENTIFICATION OF A 2 gpm LEAK RATE FROM THE '1A2' SEAL | | PACKAGE. USING CONTROL ROOM INDICATIONS, IT HAS BEEN DETERMINED THAT THE | | LEAK IS BEING COLLECTED TO THE REACTOR CAVITY SUMP. THE LEAK RATE IS | | CURRENTLY STEADY AT 2 gpm WITH A COOLDOWN IN PROGRESS AND RCS TEMPERATURE | | AT 370øF AND RCS PRESSURE AT 530 psia. THE UNIT IS BEING DEPRESSURIZED AND | | COOLED DOWN TO MODE 5 FOR REPAIRS ON THE '1A2' RCP SEAL. THE LICENSEE | | SECURED THE '1A2' RCP UPON INDICATION OF THE SECOND STAGE SEAL FAILURE. THE | | OTHER THREE RCPs REMAIN IN OPERATION. | | | | THE LICENSEE HAS NOTIFIED THE STATE AND LOCAL AGENCIES AND THE RESIDENT | | INSPECTOR. UNIT 1 HAS A 1 gpm UNIDENTIFIED LEAKAGE AND 10 gpm IDENTIFIED | | LEAKAGE ALLOWABLE TECHNICAL SPECIFICATION, AND THUS THE UNUSUAL EVENT | | DECLARATION IS PRECAUTIONARY. A PRIMARY COOLANT SYSTEM SAMPLE DRAWN TODAY | | WAS NORMAL AT 0.15 microcuries/ml. THE CONTAINMENT RADIATION GASEOUS | | MONITORING SHOWS A VERY SLIGHT INCREASE IN LEVELS. (REFER TO RELATED EVENT | | #29152.) | | | | * * * UPDATE 0647 8/3/95 FROM MIHALAKEA TAKEN BY STRANSKY * * * | | | | UNUSUAL EVENT TERMINATED AT 0630. RCS LEAKAGE THROUGH THE FAILED RCP SEAL | | PACKAGE HAS DECREASED AS RCS PRESSURE AND TEMPERATURE HAVE DECREASED. THE | | UNIT IS IN MODE 4 AND WILL CONTINUE TO BE COOLED TO PERMIT REPLACEMENT OF | | THE RCP SEAL PACKAGE. THE NRC RESIDENT INSPECTOR HAS BEEN INFORMED. THE | | NRC OPERATIONS CENTER NOTIFIED R2DO (CASTO), EO (CHAFFEE), AND FEMA (EARL). | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 29154 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: COOPER REGION: 4 |NOTIFICATION DATE: 08/03/95 | |UNIT: [1] [ ] [ ] STATE: NE |NOTIFICATION TIME: 06:40 [ET]| |RX TYPE: [1] GE-4 |EVENT DATE: 08/03/95 | +------------------------------------------------+EVENT TIME: 04:45[CDT]| |NRC NOTIFIED BY: HITZEL |LAST UPDATE DATE: 08/03/95 | |HQ OPS OFFICER: BOB STRANSKY +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |PELLET RDO | |AIND 50.72(b)(2)(iii)(D) ACCIDENT MITIGATION | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N Y 100 POWER OPERATION | 100 POWER OPERATION | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | HIGH PRESSURE COOLANT INJECTION (HPCI) SYSTEM DECLARED INOPERABLE. | | | | THE LICENSEE DECLARED THE HPCI SYSTEM INOPERABLE AND PLACED THE HPCI | | AUXILIARY OIL PUMP CONTROL SWITCH IN PULL-TO-LOCK DUE TO CONCERNS REGARDING | | WATER ACCUMULATION IN THE TURBINE EXHAUST LINE. FOLLOWING OPERATION OF THE | | HPCI SYSTEM, A SMALL QUANTITY OF WATER ACCUMULATES IN THE HPCI TURBINE | | EXHAUST LINE. THE LICENSEE HAS DETERMINED THAT THE PRESENCE OF THIS WATER | | IN THE EXHAUST LINE COULD CAUSE EXCESSIVE HYDRODYNAMIC LOADS TO BE | | GENERATED DURING THE STARTING OF THE HPCI TURBINE. THESE FORCES COULD | | CAUSE DAMAGE TO EXHAUST LINE PIPING SUPPORTS. | | | | THE LICENSEE IS PLANNING TO MODIFY THE HPCI TURBINE GOVERNOR CONTROL | | CIRCUITRY TO CAUSE THE GOVERNOR VALVE TO RAMP OPEN DURING TURBINE STARTUP | | TO REDUCE THE LOADS THAT WOULD BE GENERATED BY WATER IN THE EXHAUST LINE. | | THE RCIC SYSTEM IS CURRENTLY OPERABLE. THE NRC RESIDENT INSPECTOR HAS BEEN | | NOTIFIED BY THE LICENSEE. | | | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 29155 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: MILLSTONE REGION: 1 |NOTIFICATION DATE: 08/03/95 | |UNIT: [ ] [2] [ ] STATE: CT |NOTIFICATION TIME: 06:51 [ET]| |RX TYPE: [1] GE-3,[2] CE,[3] W-4-LP |EVENT DATE: 08/03/95 | +------------------------------------------------+EVENT TIME: 06:10[EDT]| |NRC NOTIFIED BY: SUDIGALA |LAST UPDATE DATE: 08/03/95 | |HQ OPS OFFICER: BOB STRANSKY +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |DURR RDO | |ASHU 50.72(b)(1)(i)(A) PLANT S/D REQD BY TS | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | | | 2 | N Y 8 POWER OPERATION | 3 STARTUP | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | TECHNICAL SPECIFICATION REQUIRED SHUTDOWN DUE TO DROPPED CONTROL ROD. | | | | THE LICENSEE HAS COMMENCED A UNIT SHUTDOWN IN ACCORDANCE WITH TECHNICAL | | SPECIFICATIONS DUE TO A DROPPED CONTROL ELEMENT ASSEMBLY (CEA) CAUSED BY A | | POWER SUPPLY FAILURE. THE LICENSEE REPORTED THAT BOTH THE NORMAL AND | | BACKUP POWER SUPPLIES FOR THIS CEA FAILED FOR AN UNKNOWN REASON. THE | | LICENSEE IS CURRENTLY TROUBLESHOOTING THE CAUSE OF THE FAILURES. | | | | THE NRC RESIDENT INSPECTOR WILL BE INFORMED BY THE LICENSEE. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 29156 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: WATTS BAR REGION: 2 |NOTIFICATION DATE: 08/03/95 | |UNIT: [1] [2] [ ] STATE: TN |NOTIFICATION TIME: 14:09 [ET]| |RX TYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 08/03/95 | +------------------------------------------------+EVENT TIME: 02:00[EDT]| |NRC NOTIFIED BY: RALPH THOMPSON |LAST UPDATE DATE: 08/03/95 | |HQ OPS OFFICER: LEIGH TROCINE +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |CHARLES CASTO RDO | |HFIT 26.73 FITNESS FOR DUTY | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N N 0 UNDER CONSTRUCT | 0 UNDER CONSTRUCT | | 2 | N N 0 UNDER CONSTRUCT | 0 UNDER CONSTRUCT | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | A LABORER SUPERVISOR TESTED POSITIVE FOR ALCOHOL. | | | | A NON-LICENSED SUPERVISOR TESTED POSITIVE FOR ALCOHOL DURING A RANDOM | | FITNESS-FOR-DUTY TEST. THE LICENSEE HAS REMOVED THE SUPERVISOR FROM THE | | JOB AND HAS INITIATED A REVIEW OF THE INDIVIDUAL'S WORK. THE INDIVIDUAL | | HAS BEEN REFERRED TO THE EMPLOYEE ASSISTANCE PROGRAM, AND THE INDIVIDUAL'S | | ACCESS TO THE PLANT HAS BEEN PULLED FOR A MINIMUM OF 14 DAYS. | | | | THE LICENSEE HAS NOTIFIED THE RESIDENT INSPECTOR AND PLANS TO MAKE A | | COURTESY NOTIFICATION TO THE REGION. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |GENERAL INFORMATION or OTHER | |EVENT NUMBER: 29157 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |LICENSEE: GEORGETOWN UNIVERSITY |NOTIFICATION DATE: 08/03/95 | | CITY: WASHINGTON D.C. REGION: 1 |NOTIFICATION TIME: 17:18 [ET]| | COUNTY: STATE: DC |EVENT DATE: 07/06/95 | |LICENSE#: 080170904 AGREEMENT: N |EVENT TIME: 17:30[EDT]| | DOCKET: |LAST UPDATE DATE: 08/03/95 | | +-----------------------------+ | |PERSON ORGANIZATION| | |JACK DURR RDO | | | | +------------------------------------------------+ | |NRC NOTIFIED BY: SIM SHANKS | | |HQ OPS OFFICER: LEIGH TROCINE | | +------------------------------------------------+ | |EMERGENCY CLASS: NOT APPLICABLE | | |10 CFR SECTION: | | |BAB2 20.2201(a)(1)(ii) LOST/STOLEN LNM>10X | | | | | | | | | | | | | | +------------------------------------------------+-----------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | GEORGETOWN UNIVERSITY WHICH IS LOCATED IN WASHINGTON D.C. MADE A 30-DAY | | NOTIFICATION OF AN APPARENT LOSS OF SOURCE MATERIAL (1.37-MILLICURIE SOLID | | SEED OF PALLADIUM-103) GREATER THAN TEN TIMES APPENDIX C LEVELS. | | | | A 1.37-MILLICURIE SOLID SEED OF PALLADIUM-103 (APPROXIMATELY THE SIZE OF A | | BROKEN PENCIL LEAD) IS CURRENTLY UNACCOUNTED FOR. APPARENTLY, 85 SEEDS | | WERE SHIPPED FROM THE VENDOR (THERAGENICS CORPORATION OF NORCROSS, | | GEORGIA), AND ONLY 84 SEEDS WERE RECEIVED BY GEORGETOWN UNIVERSITY ON JULY | | 6, 1995. THE PACKAGE WAS NOT BREACHED DURING SHIPPING. THE SEEDS WERE | | RE-COUNTED AND SURVEYED, AND THE LICENSEE HAS BEEN WORKING WITH THE VENDOR | | TO TRY TO RECOVER THE MATERIAL. ATTEMPTS THUS FAR HAVE BEEN UNSUCCESSFUL. | | THE LICENSEE HAS NOTIFIED THE VENDOR AND THE RADIATION MEDICINE FACILITY | | AND PLANS TO SEND A REPORT TO THE NRC REGIONAL OFFICE TOMORROW. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 29158 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: GINNA REGION: 1 |NOTIFICATION DATE: 08/03/95 | |UNIT: [1] [ ] [ ] STATE: NY |NOTIFICATION TIME: 17:48 [ET]| |RX TYPE: [1] W-2-LP |EVENT DATE: 08/03/95 | +------------------------------------------------+EVENT TIME: 15:25[EDT]| |NRC NOTIFIED BY: DOUGLAS A. PETERSON |LAST UPDATE DATE: 08/03/95 | |HQ OPS OFFICER: LEIGH TROCINE +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |JACK DURR RDO | |AESF 50.72(b)(2)(ii) ESF ACTUATION | | |ANLI 50.72(b)(1)(iii) LIGHTNING | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 1 | N Y 96 POWER OPERATION | 96 POWER OPERATION | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | AUTOMATIC START OF AN EMERGENCY DIESEL GENERATOR DUE TO A PARTIAL LOSS OF | | OFFSITE POWER WHICH RESULTED FROM A LIGHTNING STRIKE. | | | | A LIGHTNING STRIKE AT STATION 204 AT 1525 CAUSED THE LOSS OF 1 OF 2 OFFSITE | | POWER SOURCES (OFFSITE POWER SOURCE CIRCUIT 751). THE 'B' EMERGENCY DIESEL | | GENERATOR AUTOMATICALLY STARTED AND RE-ENERGIZED SAFEGUARDS BUSSES 16 AND | | 17 (2 OF 4 480-VOLT SAFEGUARDS BUSSES) ALMOST IMMEDIATELY. OPERATING | | EQUIPMENT THAT TRIPPED OFF INCLUDED THE 'B' AND 'C' CONTAINMENT | | RECIRCULATION FANS AND THE 'B' CHARGING PUMP. THESE PIECES OF EQUIPMENT | | WERE LATER RESET AND RESTARTED. ALL SAFETY-RELATED EQUIPMENT OPERATED AS | | EXPECTED. ALL SAFEGUARDS BUSSES WERE RE-ENERGIZED FROM OFFSITE POWER BY | | 1628. | | | | THE NRC RESIDENT INSPECTOR WAS NOTIFIED BY THE LICENSEE. | +------------------------------------------------------------------------------+ +----------------------------------+ +-----------------------+ |POWER REACTOR | |EVENT NUMBER: 29159 | +----------------------------------+ +-----------------------+ +------------------------------------------------+-----------------------------+ |FACILITY: FERMI REGION: 3 |NOTIFICATION DATE: 08/03/95 | |UNIT: [2] [ ] [ ] STATE: MI |NOTIFICATION TIME: 18:21 [ET]| |RX TYPE: [2] GE-4 |EVENT DATE: 08/03/95 | +------------------------------------------------+EVENT TIME: 17:26[EDT]| |NRC NOTIFIED BY: MARK SMITH |LAST UPDATE DATE: 08/03/95 | |HQ OPS OFFICER: LEIGH TROCINE +-----------------------------+ +------------------------------------------------+ NOTIFICATIONS | |EMERGENCY CLASS: NOT APPLICABLE +-----------------------------+ |10 CFR SECTION: |JIM MCCORMICKBARGER RDO | |DDDD 73.71 UNSPECIFIED PARAGRAPH | | | | | | | | | | | | | | +-----+----------+-------+--------+--------------+--+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | 2 | N Y 95 POWER OPERATION | 95 POWER OPERATION | | | | | | | | | +-----+---------------------------------------------+--------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | A LOSS OF PROTECTED AREA PERIMETER PHYSICAL SECURITY ASSESSMENT CAPABILITY | | OCCURRED DUE TO SEVERE WEATHER. | | | | SEVERE ELECTRICAL STORMS ACCOMPANIED BY HIGH WINDS AND RAIN CAUSED SECURITY | | SYSTEM ALARMS TO COME IN AT A HIGH RATE AND CAUSED BOTH THE CENTRAL AND | | SECONDARY ALARM STATION CONSOLES TO BECOME INOPERATIVE. SOME OF THE | | OFFICERS INITIALLY POSTED ON THE PROTECTED AREA PERIMETER WERE PULLED FOR | | SAFETY REASONS. A LOSS OF PERIMETER ASSESSMENT CAPABILITY OCCURRED, AND | | PERIMETER ALARM POINTS WERE UNCOMPENSATED. ONE CLOSED CIRCUIT TELEVISION | | ALSO BECAME INOPERABLE DURING THE EVENT. ADDITIONAL PATROLS WERE IN EFFECT | | IN THE VITAL AREAS THROUGHOUT THE EVENT. ONE CONTINUOUS MOBILE PATROL WAS | | ALSO IN EFFECT THROUGHOUT THE EVENT, AND PORTIONS OF THE PROTECTED AREA | | REMAINED COMPENSATED FOR. RECOVERY EFFORTS ARE CURRENTLY IN PROGRESS, AND | | MAINTENANCE PERSONNEL ARE ASSESSING THE SYSTEM DAMAGE. IN ADDITION, ARMED | | OFFICERS ALLOWED ACCESS TO RESPONDING SECURITY PERSONNEL THROUGH PROTECTED | | AREA BARRIERS. | | | | THE LICENSEE WILL NOTIFY THE NRC RESIDENT INSPECTOR. | +------------------------------------------------------------------------------+