Headquarters Daily Report JANUARY 27, 1998 *************************************************************************** REPORT NEGATIVE NO INPUT ATTACHED INPUT RECEIVED RECEIVED HEADQUARTERS û REGION I û REGION II û REGION III û REGION IV û PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION III JANUARY 27, 1998 Licensee/Facility: Notification: Commonwealth Edison Co. MR Number: 3-98-0006 Braidwood 2 Date: 01/27/98 Braceville,Illinois SRI VIA PC Dockets: 50-457 PWR/W-4-LP Subject: TURBINE TRIP/RX TRIP Discussion: On January 26, 1998, at about 9:53 p.m. central daylight time, Braidwood Unit 2 underwent a turbine trip and reactor trip. All equipment operated as expected after the reactor trip. The cause of the trip is unknown. However, the licensee was performing troubleshooting maintenance on a circuit card for the main turbine digital electo-hydraulic control system at the time of the trip. The licensee plans to cool the unit down to 360 degrees Fahrenheit and remain shutdown for at least seven days to perform forced outage maintenance. The Senior Resident Inspector responded to the site. Regional Action: Resident Inspector followup of the root cause of the trip and forced outage maintenance. Contact: MICHAEL JORDAN (630)829-9637 _