Headquarters Daily Report APRIL 03, 1997 *************************************************************************** REPORT NEGATIVE NO INPUT ATTACHED INPUT RECEIVED RECEIVED HEADQUARTERS û REGION I û REGION II û REGION III û REGION IV û PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION II APRIL 3, 1997 Licensee/Facility: Notification: Florida Power Corporation MR Number: 2-97-0022 Crystal River 3 Date: 04/03/97 Crystal River,Florida Dockets: 50-302 PWR/B&W-L-LP Subject: ORGANIZATIONAL CHANGES Discussion: Effective April 3, 1997, Florida Power Corporation has announced the following management changes at their Crystal River Unit 3 (CR3) Nuclear Plant: Mr. Charles Pardee has been hired to be the Director of Nuclear Plant Operations (Plant Manager). Mr. Pardee is currently the Operations Manager at Carolina Power & Light's (CP&L) Brunswick Plant and was previously the Manager of Technical Support. He holds an active Senior Reactor Operator license at Brunswick. He was formerly employed by INPO as an on-shift Startup Director and Knolls Atomic Power Laboratory as a Shift Supervisor, Maintenance Manger, and Operations Manager. The current Director of Nuclear Plant Operations, Bruce Hickle, will assume the duties of Restart Director and will be responsible for all aspects of the licensee's activities associated with restart efforts. He will continue to be a direct report to the Vice President, Nuclear Production. Mr. Robert Grazio has been hired to be the Director Regulatory Affairs to oversee all licensing and regulatory interface functions. This position replaces the current position of Director Site Support. Mr. Grazio is currently the Brunswick Engineering Manager but is on loan to Northeast Utilities' Millstone Site where he is overseeing Licensing and Engineering interfaces. He has previously worked for Florida Power and Light (FP&L) on Turkey Point nuclear licensing issues and at Pilgrim as Engineering and Licensing Manager. Mr. Mark Marano has been hired to be the Director of Site Services to oversee Nuclear Security, Information Resources, Document Control, Contract Services, Financial Planning, and Corporate Relations. These functions are currently overseen by the Director Nuclear Operations Materials and Controls held by Mr. William Conklin. Mr. Conklin will retain this title and oversite of Nuclear Purchasing and Material Control. Mr. Marano is currently the Corrective Action Program Manager at PSE&G's Salem plant. He was previously employed by CP&L as the Brunswick Site Support Director and FP&L in the Information Technology area. Regional Action: Information Only Contact: L. MELLEN (404)331-5561 _ REGION II MORNING REPORT PAGE 2 APRIL 3, 1997 Licensee/Facility: Notification: MR Number: 2-97-0023 Florida Bureau Of Radiation Control Date: 04/03/97 Crystal River,Florida License No: 1157-1 Subject: PERSONNEL EXPOSURE UPDATE Reportable Event Number: 32068 Discussion: The Florida Bureau of Radiation Control (BRC) reported that their initial investigation of the personnel exposure at the coal plant at Crystal River shows that only 4 out of the 17 people working in the vicinity of the source could potentialy have been exposed to the direct radiation beam while working on a ladder. The initial dosimetry evaluation indicates that the maximum dose that any one person could have received was an estimated 35 millirem whole body dose. The exposure device was confirmed to be a Texas Nuclear Corporation (TN Technologies) device with 50 millicuries of cesium-137. Florida is continuing their investigation of the event. Contact: R.Woodruff (404)331-5545 _