Headquarters Daily Report JULY 22, 1996 *************************************************************************** REPORT NEGATIVE NO INPUT ATTACHED INPUT RECEIVED RECEIVED HEADQUARTERS û REGION I û REGION II û REGION III û REGION IV û PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION IV JULY 22, 1996 Licensee/Facility: Notification: Entergy Operations, Inc. MR Number: 4-96-0078 River Bend 1 Date: 07/22/96 St Francisville,Louisiana Senior Resident Inspector Dockets: 50-458 BWR/GE-6 Subject: STARTUP FROM FORCED OUTAGE Discussion: On July 20, 1996, at 5:15 p.m. (CDT), the reactor entered Mode 2 following a 9-day unplanned outage. The reactor entered Mode 1 at 2:16 p.m. (CDT) and the turbine was synchronized to the grid at 7:40 p.m. (CDT) on July 21, 1996. The plant was shutdown on July 11, 1996, for failing to perform a Technical Specification surveillance test on the Division II station battery (PNO-IV-96-037). During the unplanned outage, the licensee also identified testing deficiencies with the Division III station battery as well as 25 other surveillance testing deficiencies on various systems. Both batteries were tested, recharged, and declared operable. All deficient surveillance tests were either reperformed or analyzed as being satisfactory prior to restart. Additional work performed during the outage included replacement of the pump seals for both reactor recirculation pumps, the overhaul of Circulating Water Pump C, and cold shutdown inservice testing of valves. Regional Action: The resident inspectors will continue to monitor licensee activities. Contact: W. Smith (504)635-3193 G. Werner (817)860-8269 _