Headquarters Daily Report JULY 18, 1996 *************************************************************************** REPORT NEGATIVE NO INPUT ATTACHED INPUT RECEIVED RECEIVED HEADQUARTERS û REGION I û REGION II û REGION III û REGION IV û PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION III JULY 18, 1996 Licensee/Facility: Notification: Wisconsin Electric Power Co. MR Number: 3-96-0078 Point Beach 1 2 Date: 07/16/96 Two Rivers,Wisconsin SRI Dockets: 50-266,50-301 PWR/W-2-LP,PWR/W-2-LP Subject: INATTENTION TO CONTROL ROOM INDICATIONS Discussion: The Point Beach RI and Kewaunee SRI observed the onshift operating crew, who were at their stations, watching an employee assistance program training tape during a safety meeting conducted in the control room. It appeared that operators were not monitoring control room indications while viewing the tape. The shift supervisor, who was in sight of the panels, stated that it was not uncommon for operators to observe one or more training tapes during monthly safety meetings conducted in the control room. Regional Action: Subsequent to discussions between NRC Region III and plant management on July 16, the licensee stopped this practice pending additional evaluation. On July 17, Region III dispatched an operator licensing specialist to further evaluate this issue. The inspector is scheduled to exit on July 18. The Region III DRP Branch Chief is onsite and will attend the exit meeting. In addition, this issue will be discussed with licensee management by the NRR Director of Reactor Projects for RIII/RIV who is onsite for a previously scheduled visit to Point Beach and Kewaunee. Contact: M. L. DAPAS (708)829-9628 _