Headquarters Daily Report OCTOBER 11, 1995 *************************************************************************** REPORT NEGATIVE NO INPUT ATTACHED INPUT RECEIVED RECEIVED HEADQUARTERS û REGION I û REGION II û REGION III û REGION IV û PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION I OCTOBER 11, 1995 Licensee/Facility: Notification: New York Power Authority MR Number: 1-95-0130 Indian Point 3 Date: 10/10/95 Buchanan,New York SRI PC Dockets: 50-286 PWR/W-4-LP Subject: INDIAN POINT 3 ORGANIZATION CHANGES Discussion: NYPA has made several organizational changes since Indian Point 3 restarted from a maintenance / performance improvement outage on June 27, 1995. Several position titles have changed. The Resident Manager title was changed to the Site Executive Officer. The Vice President, Engineering, and, Vice President, Regulatory Affairs and Special Projects, have been renamed Director, Engineering, and Director, Regulatory Affairs and Special Projects, respectively. The Technical Services Department was separated into the Performance Engineering and System Engineering Departments. The Performance Engineering Department will report to the General Manager of Operations. The System Engineering Department will report to the Site Engineering Director. The position of the Tactical Assessment Coordinator, which will be filled by Mr J. Comiotes, was created and reports to the Vice President of Appraisal, Compliance and Regulatory Affairs. Mr. J. Vozzella was appointed to a new General Manager position for site planning and outage services. This new position will oversee central planning, planning and scheduling, outage management and work control. Mr. M. Pearson has been named the new Operations Manager. He will replace Mr. N. Eggemeyer, an INPO loanee, in December 1995. Regional Action: None Contact: Curtis Cowgill (610)337-5233 _