Headquarters Daily report JUNE 02, 1995 *************************************************************************** REPORT NEGATIVE NO INPUT ATTACHED INPUT RECEIVED RECEIVED HEADQUARTERS X REGION I X REGION II X REGION III X REGION IV X *************************************************************************** PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION I JUNE 2, 1995 Licensee/Facility: Notification: New York Power Authority MR Number: 1-95-0074 Fitz Patrick 1 Date: 06/02/95 Lycoming,New York Dockets: 50-333 BWR/GE-4 Subject: Reportable Event Number: N/A Discussion: On June 1, during unit startup at approximately 6:00 p.m., the James A. FitzPatrick plant staff decided to discontinue the startup after several control rods "double notched" in the outward direction. Sixteen of the 147 control rods had been withdrawn from the core when the licensee observed the third control rod moving two notches vice the standard one notch. The plant is currently in a cold condition with all rods inserted. The licensee is conducting control rod testing including control rod speed timing and stall flow rates. Contact: Curtis Cowgill (610)337-5233 PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION III JUNE 2, 1995 Licensee/Facility: Notification: Union Electric Co. MR Number: 3-95-0102 Callaway 1 Date: 06/02/95 Fulton,Missouri PHONE CALLS TO SITES Dockets: 50-483 PWR/W-4-LP Subject: FLOODING (CLOSEOUT). PHONE CALLS WERE MADE TO SITES FEMA REGION VII, MISSOURI EMERGENCY MANAGEMENT ANGENCY (SEMA) Reportable Event Number: N/A Discussion: At both sites, local rivers have crested and river levels are decreasing. Some localities and local roads may be affected, but designated alternate evacuation routes are available. FEMA monitoring efforts are being significantly reduced. Regional Action: Information only. Contact: J.R. CREED (708)829-9857