Subject: Hackberry LNG Terminal, L.L.C.; Notice of Intent To
[Federal Register: July 22, 2002 (Volume 67, Number 140)]
[Notices]
[Page 47791-47793]
>From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr22jy02-58]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP02-374-000]
Hackberry LNG Terminal, L.L.C.; Notice of Intent To Prepare an
Environmental Impact Statement for the Proposed Hackberry LNG Terminal
Project, Request for Comments on Environmental Issues, and Notice of
Public Scoping Meeting and Site Visit
July 16, 2002.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental impact statement (EIS) that
will discuss the environmental impacts of Hackberry LNG Terminal
L.L.C.'s (Hackberry) proposed Hackberry LNG Terminal Project in
Louisiana.\1\ These proposed facilities would consist of liquefied
natural gas (LNG) import terminal and storage facilities in Cameron
Parish and 35.4 miles of 36-inch-diameter pipeline in Cameron,
Calcasieu, and Beauregard Parishes, Louisiana. This EIS will be used by
the Commission in its decision-making process to determine whether the
project is in the public convenience and necessity.
---------------------------------------------------------------------------
\1\ Hackberry's application was filed with the Commission under
Sections 3(a) and 7(c) of the Natural Gas Act and Parts 157 and 284
of the Commission's regulations.
---------------------------------------------------------------------------
This notice is being sent to residences within 0.5 mile of
Hackberry's proposed LNG facilities and to landowners along the
proposed pipeline route. If you are a landowner receiving this notice,
you may be contacted by a pipeline company representative about the
acquisition of an easement to construct, operate, and maintain the
proposed facilities. The pipeline company would seek to negotiate a
mutually acceptable agreement. However, if the project is approved by
the Commission, that approval conveys with it the right of eminent
domain. Therefore, if easement negotiations fail to produce an
agreement, the pipeline company could initiate condemnation proceedings
in accordance with state law.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' was attached to the
project notice Hackberry provided to landowners. This fact sheet
addresses a number of typically asked questions, including the use of
eminent domain and how to participate in the Commission's proceedings.
It is available for viewing on the FERC Internet website (http://
www.ferc.gov).
Summary of the Proposed Project
Hackberry proposes to build a new LNG import, storage, and
vaporization terminal approximately 2.3 miles north of Hackberry,
Louisiana; and a natural gas pipeline to transport approximately 1.5
billion cubic feet per day of imported natural gas to the United States
market. The natural gas would primarily supply new power generation
markets. Hackberry seeks authorization to construct and operate the
following new facilities at its proposed site:
LNG ship docking and unloading facilities with two berths,
each equipped with mooring and breasting dolphins, three liquid
unloading arms, and one vapor return arm;
three double-walled LNG storage tanks each with a usable
volume of 1,006,000 barrels (3.5 billion cubic feet of gas equivalent);
nine 250 million standard cubic feet per day (MMscf/d) in-
tank pumps;
ten 188 MMscf/d second-stage pumps;
twelve 150 MMscf/d submerged combustion vaporizers;
a boil-off gas compressor and condensing system;
an LNG circulation system to maintain the facilities at
the appropriate temperature when LNG ships are not being unloaded;
a natural gas liquids recovery unit;
utilities, buildings, and service facilities; and
35.4 miles of 36-inch-diameter natural gas pipeline
extending from the LNG import terminal in Cameron Parish north through
Calcasieu Parish to a connection with the existing Transcontinental Gas
Pipe Line compressor station site in Beauregard Parish.
As part of the proposed project, Hackberry plans to remove the
existing liquefied petroleum gas facilities and associated dock at the
proposed site. The general location of the project facilities is shown
in appendix 1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies are available on the
Commission's website (http://www.ferc.gov) at the ``RIMS'' link or
from the Commission's Public Reference and Files Maintenance Branch,
888 First Street, NE., Washington, DC 20426, or call (202) 208-1371.
For instructions on connecting to RIMS refer to the last page of
this notice. Copies of the appendices were sent to all those
receiving this notice in the mail.
---------------------------------------------------------------------------
Hackberry is requesting approval to begin construction of the LNG
facilities in October 2003 and the pipeline in April 2006. The
approximate duration of construction of the LNG facilities would be 3
years, while pipeline construction would take 6 months. Hackberry
proposes to place the project in service by November 2006.
[[Page 47792]]
Land Requirements for Construction
Construction of the LNG terminal would require about 153 acres for
the docking and LNG terminal facilities. Construction of the proposed
pipeline facilities would disturb about 446 acres of land including the
construction right-of-way, temporary extra workspaces, and contractor/
pipe yards. Additional temporary work areas would include the use of
36.1 miles of primarily existing access roads along the proposed
pipeline route. Approximately 6.1 miles of these access roads would
require some improvements, resulting in the disturbance of 36.7 acres.
The nominal construction right-of-way for the pipeline would be 100
feet wide. Additional right-of-way width and temporary extra workspace
would be required at road and waterbody crossings and areas requiring
topsoil segregation or special construction techniques.
Hackberry would maintain a 50-foot-wide permanent right-of-way for
operation of the pipeline. Total land requirements would be
approximately 199 acres for the new permanent right-of-way and 101
acres for the LNG facilities. Aboveground facilities associated with
the pipeline, including mainline block valves, pig launchers and
receivers, would be located within the new permanent right-of-way.\3\
---------------------------------------------------------------------------
\3\ A pig is an internal tool used to clean, dry, or internally
inspect a pipeline for potential leaks.
---------------------------------------------------------------------------
The EIS Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about
proposals.\4\ This process is referred to as ``scoping''. The main goal
of the scoping process is to focus the analysis in the EIS on the
important environmental issues and reasonable alternatives. By this
Notice of Intent, we are requesting agency and public comments on the
scope of the issues to be analyzed and presented in the EIS. All
comments received are considered during the preparation of the EIS.
State and local government representatives are encouraged to notify
their constituents of this proposed action and encourage them to
comment on their areas of concern.
---------------------------------------------------------------------------
\4\ ``We'', ``us'', and ``our'' refer to the environmental staff
of the Office of Energy Projects (OEP).
---------------------------------------------------------------------------
Our independent analysis of the issues will be in the Draft EIS.
The Draft EIS will be mailed to Federal, state, and local agencies,
public interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission's official service list for
this proceeding. We will consider all comments on the Draft EIS and
revise the document, as necessary, before issuing a Final EIS. The
Final EIS will include our response to all comments received. To ensure
your comments are considered, please carefully follow the instructions
in the public participation section beginning on page 6.
Currently Identified Environmental Issues
The EIS will discuss impacts that could occur as a result of the
construction and operation of the proposed project. We have already
identified a number of environmental issues and alternatives that we
think deserve attention based on a preliminary review of the proposed
facilities, and the environmental information provided by Hackberry.
This preliminary list of issues and alternatives may be changed based
on your comments and our additional analysis.
Geology and Soils:
--Assessment of potential geological hazards, including subsidence.
--Assessment of potentially contaminated dredge material.
--Impact on mineral and petroleum resources.
--Erosion and sedimentation control.
--Right-of-way restoration.
Water Resources:
--Impact on groundwater and surface water supplies.
--Assessment of dredge and fill of coastal wetlands associated with
construction of the proposed LNG terminal.
--Assessment of alternatives to avoid or minimize wetland impacts.
--Permanent impact on forested wetlands associated with
construction and maintenance of the pipeline.
--Impact on wetland hydrology.
--Effect of pipeline crossings on perennial and intermittent
streams, canals, and ditches, including possible increased turbidity
from construction.
--Assessment of hydrostatic test water sources and discharge
locations.
Fish, Wildlife, and Vegetation:
--Effect on Essential Fish Habitat.
--Effect on economically important marine fisheries.
--Effect on wildlife resources and their habitat.
--Effect on migratory birds.
--Assessment of wildlife-related construction time window
restrictions.
--Control of noxious weeds within the right-of-way.
--Assessment of measures to successfully revegetate the right-of-
way.
--Clearing and permanent loss of forestland.
Endangered and Threatened Species:
--Potential effect on federally listed species.
Cultural Resources:
--Assessment of survey methodologies.
--Effect on historic and prehistoric sites.
--Native American and tribal concerns.
Paleontological resources:
--Effect on paleontological resources.
Land Use, Recreation and Special Interest Areas, and Visual
Resources:
--Permanent land use alteration associated with site development.
--Impacts on forest land associated with pipeline construction,
including forested wetlands.
--Impact on residences near the pipeline construction work area.
--Evaluation of the project's consistency with coastal zone
management area guidelines.
--Visual impacts associated with the new LNG terminal and storage
tanks.
Socioeconomics:
--Effects on transportation and traffic within the project area,
including the increase of shipping traffic within the Calcasieu Ship
Channel by approximately 210 LNG tankers per year.
--Effects of construction workforce demands on public services and
temporary housing.
Air Quality and Noise:
--Effects on local air quality and noise environment from
construction and operation of the proposed facilities.
Reliability and Safety:
--Assessment of hazards associated with shipping and storage of
LNG.
--Assessment of hazards associated with natural gas pipelines.
Alternatives:
--Assessment of the use of existing natural gas systems to reduce
or avoid environmental impacts.
--Evaluation of alternative sites for the LNG import and storage
facilities.
--Evaluation of pipeline route alternatives.
--Identification of measures to lessen or avoid impacts on the
various resource and special interest areas.
[[Page 47793]]
Cumulative Impact:
--Assessment of the effect of the proposed project when combined
with other past, present, or future actions in the same region.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. By becoming a commentor, your
concerns will be addressed in the EIS and considered by the Commission.
You should focus on the potential environmental effects of the
proposal, alternatives to the proposal (including alternative locations
and routes), and measures to avoid or lessen environmental impact. The
more specific your comments, the more useful they will be. Please
carefully follow these instructions to ensure that your comments are
received in time and properly recorded:
Send an original and two copies of your letter to: Magalie
R. Salas, Secretary Federal Energy Regulatory Commission, 888 First
St., NE., Room 1A, Washington, DC 20426.
Label one copy of the comments for the attention of Gas
Branch 1, PJ-11.1.
Reference Docket No. CP02-374-000.
Mail your comments so that they will be received in
Washington, DC on or before August 16, 2002.
Please note that we are continuing to experience delays in mail
deliveries from the U.S. Postal Service. As a result, we will include
all comments that we receive within a reasonable time frame in our
environmental analysis of this project. However, the Commission
encourages electronic filing of any comments or interventions or
protests to this proceeding. See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's web site at http://www.ferc.gov under
the ``e-Filing'' link and the link to the User's Guide. Before you can
file comments you will need to create a free account which can be
created by clicking on ``Login to File'' and then ``New User Account.''
Public Scoping Meetings and Site Visit
In addition to or in lieu of sending written comments, we invite
you to attend the public scoping meeting we will conduct in the project
area. The location and time for this meeting is listed below: August 6,
2002, 7:00 pm. Holiday Inn Express, 102 Mallard Street, Sulphur,
Louisiana 70665, Telephone: 337-625-2500.
The public scoping meeting is designed to provide state and local
agencies, interested groups, affected landowners, and the general
public with more detailed information and another opportunity to offer
your comments on the proposed project. Interested groups and
individuals are encouraged to attend the meeting and to present
comments on the environmental issues they believe should be addressed
in the EIS. A transcript of the meeting will be made so that your
comments will be accurately recorded.
On the day of the meeting, we will also be conducting a limited
site visit to the LNG terminal site and pipeline route. Anyone
interested in participating in the site visit should meet at the
proposed LNG terminal site, located approximately 15 miles south of
Sulphur, Louisiana along Louisiana State Route 27, at 8:30 AM on August
6, 2002. The meeting place is a gravel drive on the left side of
Louisiana State Route 27, two miles south of the Intracoastal Waterway
bridge. Participants must provide their own transportation.
Becoming an Intervenor
In addition to involvement in the EIS scoping process, you may want
to become an official party to the proceeding known as an
``intervenor''. Intervenors play a more formal role in the process.
Among other things, intervenors have the right to receive copies of
case-related Commission documents and filings by other intervenors.
Likewise, each intervenor must provide 14 copies of its filings to the
Secretary of the Commission and must send a copy of its filings to all
other parties on the Commission's service list for this proceeding. If
you want to become an intervenor you must file a motion to intervene
according to Rule 214 of the Commission's Rules of Practice and
Procedure (18 CFR385.214) (see appendix 2).\5\ Only intervenors have
the right to seek rehearing of the Commission's decision.
---------------------------------------------------------------------------
\5\ Interventions may also be filed electronically via the
Internet in lieu of paper. See the previous discussion on filing
comments electronically.
---------------------------------------------------------------------------
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by stating that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your environmental comments considered.
Environmental Mailing List
This notice is being sent to individuals, organizations, and
government entities interested in and/or potentially affected by the
proposed project. It is also being sent to all identified potential
right-of-way grantors. By this notice we are also asking governmental
agencies, especially those in appendix 3, to express their interest in
becoming cooperating agencies for the preparation of the EIS.
Additional Information
Additional information about the proposed project is available from
the Commission's Office of External Affairs at 1-866-208-FERC or on the
FERC website (http://www.ferc.gov) using the ``RIMS'' link to
information in this docket number. Click on the ``RIMS'' link, select
``Docket #'' from the RIMS Menu, and follow the instructions.
For assistance with access to RIMS, the RIMS helpline can be reached at
(202) 208-2222. Similarly, the ``CIPS'' link on the FERC Internet
website provides access to the texts of formal documents issued by the
Commission, such as orders, notices, and rulemakings. From the FERC
Internet website, click on the ``CIPS'' link, select ``Docket
#'' from the CIPS menu, and follow the instructions. For
assistance with access to CIPS, the CIPS helpline can be reached at
(202) 208-2222.
Linwood A. Watson, Jr.,
Deputy Secretary.
[FR Doc. 02-18380 Filed 7-19-02; 8:45 am]
BILLING CODE 6717-01-P