Millennium Pipeline Company, L.P; Notice Requesting Comments on
Environmental Issues for a Route Variation in the City of Mount Vernon,
NY on the Millennium Pipeline Project
May 24, 2002.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) is requesting comments on environmental issues related to
the impacts of constructing and operating the Mount Vernon Variation
for the Millennium Pipeline Project (Project) proposed by Millennium
Pipeline Company (Millennium) in New York.\1\ The Mount Vernon
Variation would substitute 0.67 mile of pipeline for about 1.2 miles of
the Project in the City of Mount Vernon, New York.
---------------------------------------------------------------------------
\1\ Millennium Pipeline Company, L.P. and Columbia Gas
Transmission Corporation filed their applications with the
Commission under Section 7 of the Natural Gas Act and Part 157 of
the Commission's regulations.
---------------------------------------------------------------------------
The route was modified pursuant to the Commission's December 19,
2001 Interim Order for the Project in which the Commission asked
representatives from Millennium, the City of Mount Vernon, other
interested parties, and the citizens of Mount Vernon to work toward
reaching an agreement on a route for the Project through Mount Vernon
to an interconnection with Consolidated Edison Company of New York,
Inc.'s (Con Edison) high pressure line. The parties reached an
agreement about routing in Mount Vernon from the meter station at Oak
Street and MacQuesten Parkway. Millennium filed a request that the
Commission authorize this route, called the Mount Vernon Variation, on
May 6, 2002. The modified route would change the final portion of the
pipeline routing for the Project.
Most of the route variation would require in-street construction
generally affecting a curb to curb area within the road right-of-way.
Therefore, if you are a landowner receiving this notice, construction
may occur in the street next to your property. However, along South
Street, the variation would deviate from the road right-of-way so that
construction across Metro North's New Haven Line railroad tracks may be
completed as a bored crossing. Millennium would use the parking areas
on both sides of the railroad for staging and the bore pits. Therefore,
the parking lot landowners may be contacted by a pipeline company
representative about the acquisition of an easement to construct,
operate, and maintain the proposed facilities. The pipeline company
would seek to negotiate a mutually acceptable agreement. However, if
the project is approved by the Commission, that approval conveys with
it the right of eminent domain. Therefore, if easement negotiations
fail to produce an agreement, the pipeline company could initiate
condemnation proceedings in accordance with state law.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' addresses a number
of typically asked questions, including the use of eminent domain and
how to participate in the Commission's proceedings. It is available for
viewing on the FERC Internet website (www.ferc.gov).
We are seeking environmental comments on the portion of the route
along the Mount Vernon Variation. Your comments will be part of the
environmental review of the Project that will be used by the Commission
in its decision-making process to determine whether approval of this
portion of the Project instead of the original route is in the public
convenience and necessity.
Summary of the Mount Vernon Variation
Millennium has proposed the Mount Vernon Variation which would
replace about 1.2 miles of the Project between approximate mileposts
(MPs) 421.8 and 423.0. The route variation is proposed to minimize
construction within the City of Mount Vernon. These facilities would
transport up to 350,000 dekatherms per day of gas for shippers to Mount
Vernon, New York. Millennium seeks authority to construct and operate
the following facilities on the Mount Vernon Variation:
About 0.67 mile of 24-inch-diameter pipeline in Mount
Vernon, New York.
The location of the Mount Vernon Variation is shown in appendix 1.
The Mount Vernon Variation would extend to the southwest along the west
side of MacQuesten Parkway from the intersection with Oak Street to
South Street. At this point it would turn to the southeast on South
Street for about 300 feet. Near the Metro North Railroad crossing, the
variation would move out of the road right-of-way and into a parking
area along the south side of the road and northwest of the railroad.
The railroad crossing would be completed as a bored crossing from this
parking area to the parking area on the southeast side of the railroad.
Therefore, about 400 feet of the variation would be constructed
parallel to the South Street road right-of-way, rather than under the
road surface. After the bored crossing of the railroad, the variation
would continue to the southeast through the parking area to Beach
Street. At Beach Street the variation would turn to the southwest again
and would be installed beneath the Beach Street Road surface for a
distance of about 500 feet. The variation would end at the Bronx/Mount
Vernon border at a new interconnection with high pressure facilities of
Con Edison.
Land Requirements and Construction Procedures
Most of the pipeline construction along the variation would be
within streets. The pipe would be installed using stove-pipe
construction techniques and a 35-foot-wide construction work area
between the curbs. Millennium does not anticipate using any sidewalk
areas. MacQuesten Parkway is a divided, 4-lane street and Millennium
would use the entire west side of the divided road for construction.
In-street construction on South and Beach Streets would occupy the
entire road surface. The segment of the streets needed for construction
would be closed to vehicle traffic which would be routed around the
work area. The length of the construction segment would vary, but would
typically be between 200 and 500 feet to allow for trenching, staging
and welding of the pipe, and backfill. Construction would require about
2.8 acres of land for in-street construction plus about 0.74 acre
needed for extra workspaces for the bored railroad crossings. All
intersecting roads would be open cut. Millennium is required to restore
all road surfaces immediately after backfilling the trench.
The Interim Order requires certain construction procedures that
Millennium must use when constructing the Project in the City of Mount
Vernon. These requirements will apply to Project construction anywhere
in the City of Mount Vernon, as appropriate, including along the Mount
Vernon Variation if the Commission approves this route. These
requirements include:
Preparing site-specific construction and mitigation plans;
Providing affected parties with information about
construction related issues, including construction schedules, timing,
and traffic detours around construction activities;
Providing alternate parking locations for loss of parking
spaces;
Maintaining access to businesses and residential
buildings;
[[Page 38096]]
Properly maintaining construction equipment to reduce air
and noise pollution; and
Having appropriate utility repair crews and materials on
site at all times during construction to facilitate repairs to damaged
utilities, if needed.
The Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
We call this ``scoping''. The main goal of the scoping process is to
focus the analysis on the important environmental issues. By this
Notice, the Commission requests public comments on the scope of the
issues related to the Mount Vernon Variation. All comments received are
considered. State and local government representatives are encouraged
to notify their constituents of this proposed action and encourage them
to comment on their areas of concern.
To ensure your comments are considered, please carefully follow the
instructions in the public participation section.
Currently Identified Environmental Issues
We have already identified several issues that we think deserve
attention based on a preliminary review of the proposed facilities and
the environmental information provided by Millennium along the Mount
Vernon Variation. This preliminary list of issues may be changed based
on your comments and our analysis.
In-street construction would be required.
Construction may temporarily affect traffic.
Access to businesses and residences could be affected.
In-street construction may affect the buried utility
infrastructure.
Construction activities are noisy.
Public safety.
We will also evaluate possible alternatives, if any, to the Mount
Vernon Variation or portions of it, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. By becoming a commentor, your
concerns will be addressed and considered by the Commission. You should
focus on the potential environmental effects of the Mount Vernon
Variation, alternatives to the variation, and measures to avoid or
lessen environmental impact. The more specific your comments, the more
useful they will be. Please carefully follow these instructions to
ensure that your comments are received in time and properly recorded:
Send an original and two copies of your letter to: Ms.
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First St., NE., Room 1A, Washington, DC 20426.
Label one copy of the comments for the attention of Gas
Branch 2.
Reference Docket No. CP98-150-002.
Mail your comments so that they will be received in
Washington, DC on or before June 24, 2002.
Please note that we are continuing to experience delays in
deliveries from the U.S. Postal Service. As a result, we will include
all comments that we receive within a reasonable time frame in our
environmental analysis of this project. However, the Commission
encourages electronic filing of any comments or interventions or
protests to this proceeding. See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's web site at
http://www.ferc.gov under the ``e-Filing'' link and the link to the
User's Guide. Before you can file comments you will need to create a
free account which can be created by clicking on ``Login to File'' and
then ``New User Account.''
Becoming an Intervenor
In addition to involvement in the scoping process, you may want to
become an official party to the proceeding known as an ``intervenor''.
Intervenors play a more formal role in the process. Among other things,
intervenors have the right to receive copies of case-related Commission
documents and filings by other intervenors. Likewise, each intervenor
must provide 14 copies of its filings to the Secretary of the
Commission and must send a copy of its filings to all other parties on
the Commission's service list for this proceeding. If you want to
become an intervenor you must file a motion to intervene according to
Rule 214 of the Commission's Rules of Practice and Procedure (18 CFR
385.214) (see appendix 2).\2\ Only intervenors have the right to seek
rehearing of the Commission's decision.
---------------------------------------------------------------------------
\2\ Interventions may also be filed electronically via the
Internet in lieu of paper. See the previous discussion on filing
comments electronically.
---------------------------------------------------------------------------
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by stating that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your environmental comments considered.
Additional Information
Information is also available on the FERC website (www.ferc.gov)
using the ``RIMS'' link to information in this docket number. Click on
the ``RIMS'' link, select ``Docket #'' from the RIMS Menu, and follow
the instructions. For assistance with access to RIMS, the RIMS helpline
can be reached at (202) 208-2222. Additional information about the
proposed project is also available from the Commission's Office of
External Affairs at (202) 208-1088 (direct line) or you can call the
FERC operator at 1-800-847-8885 and ask for External Affairs.
Similarly, the ``CIPS'' link on the FERC Internet website provides
access to the texts of formal documents issued by the Commission, such
as orders, notices, and rulemakings. From the FERC Internet website,
click on the ``CIPS'' link, select ``Docket #'' from the CIPS menu, and
follow the instructions. For assistance with access to CIPS, the CIPS
helpline can be reached at (202) 208-2222.
Magalie R. Salas,
Secretary.
[FR Doc. 02-13657 Filed 5-30-02; 8:45 am]
BILLING CODE 6717-01-P