Subject: Condon Wind Project
[Federal Register: November 16, 2001 (Volume 66, Number 222)]
[Notices]
[Page 57710]
>From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr16no01-37]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Bonneville Power Administration
Condon Wind Project
AGENCY: Bonneville Power Administration (BPA), Department of Energy
(DOE).
ACTION: Notice of availability of Record of Decision (ROD).
-----------------------------------------------------------------------
SUMMARY: This notice announces the availability of the ROD to enter
into power purchase and transmission service agreements to acquire and
connect the scheduled output of up to 49.8 megawatts of the Condon Wind
Project located in central Oregon. This decision is based on the Condon
Wind Project Final Environmental Impact Statement (DOE/EIS-0321, August
2001) and Supplement Analysis (DOE/EIS-0321/SA-01). The Condon Wind
Project will be developed by SeaWest WindPower, Inc.
ADDRESS: Copies of the ROD, Environmental Impact Statement, and
Supplement Analysis may be obtained by calling BPA's toll-free document
request line, 1-800-622-4520; or at our Web site, www.efw.bpa.gov.
FOR FURTHER INFORMATION CONTACT: Sarah T. Branum, Bonneville Power
Administration--KEC-4, P.O. Box 3621, Portland, Oregon, 97208-3621;
toll-free telephone number 1-800-282-3713; fax number 503-230-5699; or
e-mail stbranum@bpa.gov.
Issued in Portland, Oregon, on November 6, 2001.
Stephen J. Wright,
Acting Administrator and Chief Executive Officer.
[FR Doc. 01-28726 Filed 11-15-01; 8:45 am]
BILLING CODE 6450-01-P