Subject: Notice of Application Ready for Environmental Analysis
[Federal Register: November 15, 2001 (Volume 66, Number 221)]
[Notices]
[Page 57434-57435]
>From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr15no01-56]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Ready for Environmental Analysis and
Soliciting Comments, Recommendations, Terms and Conditions, and
Prescriptions
November 8, 2001.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: New Major License.
b. Project No.: P-2056-016.
c. Date filed: December 21, 1998.
d. Applicant: Northern States Power Company.
e. Name of Project: St. Anthony Falls Project.
f. Location: On the Mississippi River, near Minneapolis and St.
Paul, Hennepin County, Minnesota. There are no federal lands within the
project boundary.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mark H. Holmberg, P.E., Northern States Power
Company, 414 Nicollet Mall, Minneapolis, MN 55401; (612) 330-6568.
i. FERC Contact: Any questions on this notice should be addressed
to Monte TerHaar, E-mail: monte.terhaar@ferc.fed.us, or telephone (202)
219-2768.
j. Deadline Date: 60 days from the date of issuance of this notice.
All documents (original and eight copies) should be filed with:
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Comments, protests and
interventions may be filed electronically via the Internet in lieu of
paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's web site under the ``e-Filing'' link.
The Commission's rules of practice and procedure require all
interveners filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervener files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Status of environmental analysis: This application has been
accepted for filing and is ready for environmental analysis at this
time. The Commission will prepare a draft and a final Environmental
Assessment.
l. Description of the Project: The St. Anthony Falls Project
currently consists of two developments on the Mississippi River, the
Upper Development and the Lower Development.
The Upper Development consists of the following existing facilities
located across from the U.S. Army Corps of Engineers Upper Saint
Anthony Lock: (1) Horseshoe Dam, a 1,952-foot-long concrete, timber,
and rock structure topped with 1.6-foot-high wooden flashboards; (2)
the main spillway, a concrete, timber and rock structure 425 feet wide
and 150 feet-long; (3) a 340-foot-long roll dam; (4) a 358-acre
reservoir with a normal pool water surface elevation of 799.2 feet
NGVD, and a total storage capacity of 967 acre-feet; (5) a concrete and
masonry powerhouse, 133 feet long by 92 feet wide; (6) 5 turbines with
a total installed capacity of 12,400 kilowatts, and a maximum hydraulic
capacity of 4,025 cfs, producing an average of 79,518 megawatt-hours
annually; and (7) four 115-kilovolt primary transmission lines; and
other appurtenances.
The Lower Development consists of an upstream closure dam, a
downstream closure dam, and left retaining wall which encompass
approximately 3.53 acres of land owned by Northern States Power Company
(NSP). There are currently no hydropower facilities at the Lower
Development. In November of 1987, the St. Anthony Falls Lower Dam Hydro
Plant experienced an undermining failure. On August 19, 1988, the
Commission issued an order authorizing complete demolition and removal
of the lower facility. Demolition of the powerhouse was completed by
the end of 1988. As of August 2001, all necessary remedial work
necessary to ensure dam safety at the Lower Development has been
completed to the Commission's satisfaction.
As part of the application for re-license of St. Anthony Falls
Project, the applicant proposes to remove the lower development from
the project. The Commission will discuss this alternative in its
Environmental Assessment.
m. Locations of the application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE, Washington, DC 20246.
Copies of this filing are on file with the Commission and are available
for public inspection. This filing may also be viewed on the web at
http://www.ferc.gov using the ``RIMS'' link, select ``Docket#'' and
follow the instructions (call 202-208-2222 for assistance). A copy is
also available for inspection and reproduction at the address in item
``h'' above.
Filing and Service of Responsive Documents--The application is
ready for environmental analysis at this time, and the Commission is
requesting comments, reply comments, recommendations, terms and
conditions, and prescriptions.
The Commission directs, pursuant to Sec. 4.34(b) of the regulations
(see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20, 1991) that
all comments,
[[Page 57435]]
recommendations, terms and conditions and prescriptions concerning the
application be filed with the Commission within 60 days from the
issuance date of this notice. All reply comments must be filed with the
Commission within 105 days from the date of this notice.
Anyone may obtain an extension of time for these deadlines from the
Commission only upon a showing of good cause or extraordinary
circumstances in accordance with 18 CFR 385.2008.
All filings must (1) bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Any of these documents must be
filed by providing the original and the number of copies required by
the Commission's regulations to: The Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An
additional copy must be sent to Director, Division of Environmental and
Engineering Review, Office of Energy Projects, Federal Energy
Regulatory Commission, at the above address. Each filing must be
accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b) and 385.2010.
David P. Boergers,
Secretary.
[FR Doc. 01-28595 Filed 11-14-01; 8:45 am]
BILLING CODE 6717-01-P