DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice Soliciting Written Scoping Comments
August 9, 2001.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Subsequent License for Minor Project.
b. Project No.: 719-007.
c. Date filed: October 31, 2000.
[[Page 42854]]
d. Applicant: Trinity Conservancy, Inc.
e. Name of Project: Trinity Power Project.
f. Location: On Phelps Creek and James Creek in the Columbia River
Basin in Chelan County, near Leavenworth, Washington. The project
occupies 47.9 acres of federal lands in Wenatchee National Forest.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Reid L. Brown, President, Trinity
Conservancy, Inc., 3139 E. Lake Sammamish SE, Sammamish, WA 98075-9608,
(425) 392-9214.
i. FERC Contact: Charles Hall, (202) 219-2853 or
Charles.Hall@FERC.fed.us.
j. Deadline for scoping comments: September 14, 2001.
All documents (original and eight copies) should be filed with:
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE, Washington, DC 20426 and should clearly show the
following on the first page: Trinity Power Project, FERC No. 719.
Scoping comments may be filed electronically via the Internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's web site at http://www.ferc.gov, under the ``e-Filing''
link.
The Commission's Rules of Practice and Procedure require all
interveners filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. This application has been accepted, but is not ready for
environmental analysis at this time.
l. The Trinity Project consists of: (1) A deteriorated wooden
diversion dam, 70-foot-long flume and settling tank on James Creek, and
a 3,350-foot-long, partially destroyed steel penstock, all of which is
proposed for decommissioning with this license application; (2) a 45-
foot-long, 10-foot-high timber crib diversion dam and screened intake
on Phelps Creek; (3) a 24-inch-diameter, 6,000-foot-long, gravity-flow,
steel pipe aqueduct; (4) a 20-foot-long, 14-foot-wide, 9-foot-deep,
reinforced concrete settling tank; (5) a 42-inch-to 12-inch-diameter,
2,750-foot-long, riveted spiral-wound penstock; (6) a 145-foot-long,
34-foot-wide, wood-frame powerhouse building containing a single Pelton
impulse turbine and 240-kilowatt synchronous generator; (7) a tailrace;
and (8) appurtenant facilities. The generator supplies the electricity
needs of four residences, a cabin and shed; the project is not
connected to the electric transmission grid. The licensee proposes to
remove the inoperable James Creek diversion facilities from the project
boundary accordingly.
m. A copy of the application is on file with the Commission and is
available for inspection. This filing may also be viewed on the web at
http://ferc.gov using the ``RIMS'' link--select ``Docket #'' and follow
the instructions (call (202) 208-2222 for assistance). A copy is also
available for inspection and reproduction at the address in item h
above.
n. Scoping Process: The Commission intends to prepare an
Environmental Assessment (EA) on the project in accordance with the
National Environmental Policy Act. We are asking agencies, Native
American tribes, non-governmental organizations, and individuals to
help us identify the scope of environmental issues that should be
analyzed in the EA, and to provide us with information that may be
useful in preparing the EA. To help focus comments on the environmental
issues, a scoping document outlining subject areas to be addressed in
the EA will soon be mailed to those on the mailing list for the
project.
Those not on the mailing list may request a copy of the scoping
document from the FERC Contact, whose telephone number is listed above.
Linwood A. Watson, Jr.,
Acting Secretary.